HomeMy WebLinkAboutCreekside Lot 49 Frame All.pdf®UNIVERSAL
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date: Permit No.
Project: C /LLZ k S idu
Address: 3 Z- q Z Q i R-
`f �
Check one:
1% Regular Inspection:
❑ Reinspection
Date of Initial Inspection:
Inspection Type Requested (check):
,;?o /t - o l 75-
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
)C
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
I
Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type:
Area Inspected/Code: (oso {'/ZA PO,5 �lLL
Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
K DP -Disapproved ❑ Not Ready
Conditions/Comments: I n-A -f 7 ,S 4.,, AI ev-d.4 - L GR4Z46-0-Y- T-W,4. � j Lo /3n-m 4wo a
2.
3.
4.
5.
6.
7. C
Inspector's Name: /fit L �'r �,y-ice- Lic.#: 15N q
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com