Loading...
HomeMy WebLinkAboutsoil testHeadquarters ENGINEERING Malting po 13ox 78-1377 11,34,5 U.S. Highway I Sebastian, FL. 32M Sebastian. FL. 32978 AND TES TI N G Phone. 772-589-0712 Orlando 723 Progress Way Soft COMPACTION REPORT KSMengineering-net c,k# 5693 Sanford, FL. 32771 ASTM D 1557 and ASTM D 6938 KSM ioB#: 213861-Id/JM/ah DATE TESTED: May 24,2021 NUC # 215 PERMIT 8: Nuc Model: MC-1DR-P Nuc Serial #- MDS0404215 CONTRACTOR: James Trefelner JOB LOCATION. 1200 Oak Avenue Fort Pierce, Florida rrEM TESTED: Compacted Foundation Fill - Metal Building Pad TEST LOCATION PEN DRYMAX. DRY PERCENT OF SAMPLE DEPTH READ DENSITY PROCTOR VALUE (P.C.F) COMPACTION I S.W. 0" - 12's 14D 103.7 107.2 96.7% 2 N.W. 14D 103.2 96.3% 3 Center 4 N.E. 5 S.E. Soil Description: Fine Grayish Brown Sand with Traces of Shell Fragments In Place Moisture: 4.7% Proctor Optimum Moisture' 10.0% Proctor max. Dry Density: P.C.F. 107.2 @ Test Locations the Density & Penetrometer readings indicate the Degree of Compaction Meets Minimum Requirement for staked Foundatloa &VUA111jer A 15D 104.8 97.8% 14D 104.0 97.0% ISD 105.5 98.4 04 % E Digitally 1, ;+.+ signed by 4b..' Bryan E Z No. 81439 Dahlke Date: 2021.05.25 ,0 STATF- Or- 1149:25 -04'00' V.P. of Engineering PE # 81439 5/25/2021 Email to: 109.0 W E 108.0 G H 1107.0 T 106.0 P 105.0 G F ID4.0 103.o D IOU Y 5 6 7 8 9 10 11 12 13 Moisture - % of Dry Weight Disclaimer: Contractor is responsible to maintain the tested area in the condition that KSM completed the indicated passed compaction test. KSM is not responsible if the tested area has been altered from the approved inspected condition. Test report shall not be reproduced, except Infiffl. without the written approval of KSM Engineering &-resting GeotechnIcal Engineering - Construction Materials Testing - Special Inspections- Civil and Structural Consulting Proudly Serving Florida since 1990 Certified Women Owned Business - WRE Email to: 109.0 W E 108.0 G H 1107.0 T 106.0 P 105.0 G F ID4.0 103.o D IOU Y 5 6 7 8 9 10 11 12 13 Moisture - % of Dry Weight Disclaimer: Contractor is responsible to maintain the tested area in the condition that KSM completed the indicated passed compaction test. KSM is not responsible if the tested area has been altered from the approved inspected condition. Test report shall not be reproduced, except Infiffl. without the written approval of KSM Engineering &-resting GeotechnIcal Engineering - Construction Materials Testing - Special Inspections- Civil and Structural Consulting Proudly Serving Florida since 1990 Certified Women Owned Business - WRE