Loading...
HomeMy WebLinkAbouttermitev PEST CONTROL CONTRACTOR' • PEST CONTROL We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Percentage of solution: .05 Date of Treatment: ' �r3 ' C`� 1�Fo*`o, ing� ''i Treatment Re -Treat Driveway is Treatment Re -Treat -Other ist Treatment Re -Treat Chemicals used: DOMINION 2L Total gallons used: 3 ,�-6) Time of Treatment: Treatment Re -Treat Pools 11� Treatment Re -Treat perimeter for Final Ins re' of xion v Nate: there must be a completed form for each required treatment or k-Atleatment and this form must be on the job site to be pi ed up by the Inspector at time of each Inspection or the schedule' inspection will fail and a re Inspection fee charged. FBC144.2.6 Certificate of protenve Treatment for prevention of termites: A weather resistant jobsite posting board shall be prodded to receive duplicate Treatment Certificates as each required protective treatment is completeet providing a copy for the person the perrnit Is Issued to and another copy for the building permit files 777e Treatment Certificate shall proulde the product used, identity of the applicator, lime and date dithe treatment, site location, area treated, chemical used, percent concentration and number ofgallons used, to establlsh a verifiable* record of protective treatment. If the soil chemical ba 'er method for termite prevention Is used, final extenor treatment shall be completed prior to final bullding approval. St Lucie County requires for the final inspection for CQ, a Permanent ;sticker to be placed on the electrical parcel box cower, listing all the treatments and bates of applications. Revised 7/24/2014