HomeMy WebLinkAboutFiberglass Step AnchoringP,1/07/2015 09:44 86346767BO
02-19`09 69- 58 FRM-
HOME DEPOT
pool101e F-534
Fibor's-fai$ -Sup--Artalhodng
Guldertnes
Ud Of Copts 000md L.OW,-.
2ea
. 1/4' and brj&d at
ftame nkinber;
2) IngWt L U6ittSW%20x2VP
, -B*U% wabaki. and Mft -
3) Mark joradoh of h619 In Vbrklm on the
4) Move the 9V WAY ff0m *0 home. WI
bales in canW49 *t the d6gka %cB40m-
Tap in Yr ametM anchors. , ,
5) Replace mp so that *9 tops &ft Wncrm
authors protmde. ftough " t-brft&eM-
Seem with the nets and wo&m
fS
(2) "41% Andior Asmv
Emb assembly
IS Ivich Anchor
(1) 3Ir it I W bg m*W
41MOXI.WvWher
Imts,11*40n.
i da*a '
n I , P-M
goof fbtia
step at the betg�i
4 rw law 10,00
..*'m
ftu& We offbe iml
on and mark &e
'd 816" ptanove
I curldsotbatft gasetioa as
he pjaj�c where the
I
dwinamthe.sids
of t}ee layover frame
IWO �.mnber
WARMG-. FaIhm to 8
= Its* in Wuty. PIM
houm bite sut+e the sub
rem is level"
S"Qfe4jmc;TjrawerA
mid *aShW-
ar the swp property
step against die
on vhm the Sep
owbAmo