Loading...
HomeMy WebLinkAboutAPPROVED Project Information6 GT. LUCIE WORKS }i I Section A (General Information). Master Permit No. Process No. Contractors Name: �{�l;E,fJrG C r_d I!'�License g JobAddresti Ciao' ROOF CATEGORY E7 tow Slope 0 Mechanically Fastened Tile n Mortar/Adhesive Set Tiles CXAsphaltic Shingles jimetal Panel/$hingies Mood Shingles/Shakes 0 Prescriptive BUR:RAS 150 ROOF ROOF TYPE. 13 New roof 12 Repair d Maintenance - Pf Reroofing Q Recovering ROOF SYMM INFORMATION Low Slope Roof Area (SF) Steep Sloped hoof Area (SF j Total (SF) Section B (Roof Plan) Sketch Roof Plan: illustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains. include dimensions of sections and levels,.clearly Identify dimensions of elevated pressure zones and location of parapets. 'i �T. LUCIE WORKS Section C (Low Slope Roof) Fill in specific roof assembly components and identify manufacturer (if a component is not used, -identify as "NA") System Manufacturer: Product Approval No.: Design Wind Pressures, From RAS 128 Or Calculations: Zone V: Zone IL_... --Zone 2: Zone 3, Max. Design Pressure, from the specific product approval system: oe&- Type: Gauge Thickness Slope• Anchor/Base Sheet & No. df Ply(s): Anchor/Base Sheet Fastener/Bonding Material: Insulation Base Layer; Base insultation Size and Thickness: Base insulation Fastener/Bonding Material: Top Insulation Layer: Top Insulation Size and Thickness: Top Insulation Fastener/Bonding Material: Base Sheet(s) & No. of Piy(s): Base Sheet fastener/Bonding Material: Ply Sheet(sr & No. of Piyls): Ply -Sheet Fastener/Bonding Material: ,Top Ply:. Top Ply Fastener/Bonding Material: t Surfacing: Fastener Spacing for Anchor/Base Sheet Attachment: f Zone ' " oc @ Lap, # Rows._. ®......: �? 9.'' Zone 1• - " oc @ Lap, # Rows ® ' eo Zone 2:...._." oc Lap, # Rows ® ° oo ' Zone 3:_...." oc l.ap, # Rows.__._ @ "ao " Number of.Fasteners Per Insulatfon 6pard; Zone 12:_.._..Zone 1-.--2one 2:_._,7one 3_,._,.. illustrate Components Noted and Details as Applicable: Woodbiocking, Gutter, Edge Termination, Stripping, Flashin& Continuous Cleat, Cant Strip, Base ' Flashing, Counterflashftlg, Coping, Etc... Indicate: Mean Roof Height, Parapet Height, Height of Base Flashing, Component Material, Material' Thickness, Fastener Type, Fastener Spacing or Submit Manufacturers Details that Comply with RAS 111 and Chapter 16. . m 1 1.' LUCIE WORKS .0, Section D (Steep Slope Roof System) ¢ j Roof System Manufacturer: ✓ l�Lr �0� ri 1 �fi� f�A� , Notice of Acceptance Number: �Gaa4�H Minimum Design Wind Pressures, If Applicable (From•iRAS 127 or Calculations): Zone done 2e:.._.—Zone Zn: Zone 2r. - a n 2one Se,* --- —Zone 3r. - 9� Dedk,jpe: J.t� •,,,, �a a--r--�• Rapt`. SlopeType Undedayment �� G Fire Barrier: RidgeVe aROO FWener'"eS5pechlg: N f��nc one 1 Adhesive'type: Type Cap Sheet: . R Mean Roc'Height: 161.5ta4e i ROOHlovedn Typ® $ Size Drip �l at• ay+ • Edge: �'. LUCIE W* ORKS Section E (Tile Calculations) For Moment based tilesystems, choose eltherMethod 1 or 2. Compare the values for Mrwith thevalues from Mt. If the Mfvalues are greater than or equal tdthe Mrvalues, for each area of the roof, then the the attachment method Is acceptable. Method 1'Moment Based T€le Calculations Per RAS 12T (Zone 1: X� _ `�.. Ms; = fild _ Product Approval ML (Zone2e: _ . x1,;a ��MB: �MProduct Approval Mi • (Zone In- x1.,w,= _-�i-Mir._.aM�,...._. Product Approval (Zone 2r: X #% cR Mg: ,_. m M& Product -Approval Mt ' (Zone3e: ;.,,,,_x)s - -ProductApprovatMr. (zone3r. x2. ---a" _ Product Approval Mr Method 2 "Simplified file Calculations Per Table Below"• Reauired Moment of Resistance (M►) From Table Below Product Approval Mf...._.,__, Mr required Moment Resistance* Mean Roof Height Roof Stope 15' 20' 25, 30' 40' 21.12 34:4 36.5 38.2 39.7 42.2 3.12 32.2 34.4 36.0 37A 39.8 4:12 30.4 32.2 33.8 35.1 37.3 S 12 28.4 301 31.6 32.8 34.9 6:12 28.4 28.0 2 9.4 30.5 32.E 7:12 24.4 25.9 27.1 28.2 30.0 'Must be used in conjunction with a list of moment based tale systems For Uplift based'tile systems use Method 3: Compare the values for F' with the values for Fr if the F' values are greater tlfa equal to the Fr values, for each area of the roof, then the the attachment method is acceptable. Method 3 "Uplift -Based 111e Calculations Per RAS 1ZT (Zone 1: x L. =x W "} W: cos r =Fn Product Approval F' (Zone 2e x L =x W: _. _ j VV: cos r=FrxsProduct Approval F'_„_,�� (Zone 2n: x L =at W*.=---J -W: cos r aFru+ Product Approval br (Zone 2r: x L x W:=,___j W: cos r =Far Product Approval F' (Zone 3e: x L =x W _____j -W: cos r =Frse Product Approval Fr�_, (Zone 3r:_ _XL cxW--„� W:,,.,____cosr =Fr3r ProductAppmvalF' Where to obtain information Descriptlon Symbol Where to find Design Pressure Zones 1, 2ef Zn, Zr, 3e, 3r From applicable table in RAS 127 or by an engineering analysis prepared by PE based on ASC87 Mean Roof Height H ' lob Site Roof Slope 8 lob Site Aerodynamic Multiplier a Product approval liestoring Moment due to Gravlty Ma Product Approval Attachment Resistance Mr Product Approval Required Moment Resistance me Calculated Minimum Attachment Resistance F' Product Approval Required Uplift Resistance Fr Calculated Average Tile Weight W Product Approval Tie Dimensions L - length W r vAdth Product Approval All calculations must be submitted to the building official at the time of permit application. or