HomeMy WebLinkAboutApproved Site Plan 30'
Concrete must be a minimum of off
5' from your left property lot line.
I, Sean Minix owner of the Road
Runner Travel Resort give
permission to install concrete on
S-25 with the requirements listed
above and have prepared this lot
plan.
Patio S-25
Prep for 12' Park
Sean Minix May �� 2021 awning Model
8'X 35'
Scale 1" = 10' 71
North
20'
�"p"% CYNTHIA BAKER Driveway
gMY COMMISSION#GG366608 Approx 23'
° EXPIRES:August 18,2023 . 460.' sq ft
ROAD in front of Lot S-25
MIN. S. TBACK REQ.
FRONT
SIDES L,
CNR SIDESS
REAR
ZNG.
®4
TECH. ����
v C 40 ��