Loading...
HomeMy WebLinkAbout214013-1pd Pool Backfill - signedHeadquarters 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando 723 Progress Way Sanford, FL. 32771 DATE TESTED CONTRACTOR: JOB LOCATION: tl 40 1 t ENGINEERING i11.7jVi AND TESTING SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 6938 May 27, 2021 A & G Pools 7674 Greenbrier Circle Port St Lucie, Florida Mailing PO Box 78-1377 Sebastian, FL. 32978 Phone: 772-589-0712 C.A.# 5693 KSMengineering.net KSM JOB # : 214013-1pd/CF/bm PERMIT #: 2101-0432 NUC # 234 Nuc Model: MC -DR Nuc Serial #: MD60308234 PO: 2101001/Raffa ITEM TESTED Pool Backfill Compaction TEST LOCATION PEN DRY MAX. DRY PERCENT DEPTH OF SAMPLE READ DENSITY PROCTOR VALUE COMPACTION 1 S.E. 0'-11 50+ 109.7 110.0 99.7% 2 1'-2' 11- " 95.0% + 3 2'-31 11- " 95.0% + 4 3'-4' 11- 1195.0% + 5 N.E. 0'-1' 50+ 110.0 110.0 100.0% 6 1'-2' 11- " 95.0% + 7 2'-3' 11- " 95.0% + 8 3'-4' 11- 1195.0% + 9 N.W. 0'-1' 50+ 109.2 110.0 99.3% 10 1'-2' 11- " 95.0% + 11 2'-3' 11- " 95.0% + 12 3'-4' 11- " 95.0% + Soil Description: Brown Sand with Traces 111.0 I I I I I I I of Shell Fragments In Place Moisture: 6.9% E 110.0—..J..—.1—..1 �..—.I.—..- Proctor Optimum Moisture: I I 10.0% GH I Proctor Max. Dry Density: P.C.F. 109.0 110.0 @ Test Locations the Density & P R Y /.1 Penetrometer reading indicate the 108.0 —III ••1III —••4II —1II • —••- Degree of Compaction Meets C I I I I Minimum Requirement I I I I I I I I for Plumbed Backfill F 107.0 • — • — — — — — Respectfully Submitted: I I I I I I I This item has been electronically signed and I 1 1 I I I I 1 sealed by Bryan E. Dahlke, PE FL. Lic. 81439 on the date stated directly to the right using 106.0 • • • • — • I — • • • • — I • — • • I— • • • • — • I• — • • ,� a digital signature. Printed copies of this documents are not 5 6 7 8 9 10 11 12 13 considered signed and sealed and the signature must be verified on any electronic copies. Moisture - % of Dry Weight Digitally signed by Disclaimer: Contractor is responsible to maintain the pool backfill in the condition that KSM completed the indicated Bryan E Dahlke passed compaction test. KSM is not responsible if the Date:2021.05.28 poolbackfill has been altered from the approved inspected 10:10:48-04'00' condition. Bryan E. Dahlke, P.E. V.P. of Engineering PE # 81439 5/28/2021 Email to: Abirmingham@AnGPools.com Test report shall not be reproduced, except in full, without the written approval of KSM Engineering & Testing Geotechnical Engineering - Construction Materials Testing - Special Inspections - Civil and Structural Consulting Proudly Serving Florida since 1990 Certified Women Owned Business - WBE