HomeMy WebLinkAboutAPPROVED NOA (2)NOA No. 21-0 122.0 4
Expiration Date: October 23, 2024
Approval Date: March 18, 2021
Page 1
MIAMI –DADE COUNTY, FLORIDA
PRODUCT CONTROL SECTION
11805 SW 26 Street, Room 208
DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) Miami, Florida 33175-2474
BOARD AND CODE ADMINISTRATION DIVISION T (786) 315-2590 F (786) 315-2599 NOTICE OF ACCEPTANCE (NOA) www.miamidade.gov/building
Eco Window Systems, LLC
8502 NW 80th Street
Medley, Fl. 33166 S COPE:
This NOA is being issued under the applicable rules and regulations governing the use of construction
m aterials. Th e d ocumentation submitted h as b een reviewed and accepted by Miami-Dade County RER -
Product Control Sectio n to be used in Miami Dade County and other areas where allowed by the A uthority
Having Jurisdiction (AHJ).
This NOA shall n ot be v alid a fter th e expiration d ate stated b elow. Th e Miami-Dade C ounty Product Co ntrol
Section (In Miami-Dade County) and/ or the AHJ (in areas other than Miami-Dade Co unty) reserve the right
to have this product or material tested for quality assurance purposes. If this p roduct o r m aterial f ails to
perform in the accepted manner, the manufacturer will incur the expense of such testing and t he AHJ may
immediately revoke, m odify, o r suspend th e u se o f such p roduct or m aterial within th eir ju risdictio n. RER
reserves the right to revoke this acceptance, if it is determined by Miami-Dade County Product Control
Section th at this p roduct or material fails to meet the requirements o f th e applicable b uilding c ode.
This product is approved as described herein and has been designed to comply with the Florida Building
Code, in cluding th e High Velocity Hurricane Zo ne. DESCRIPTION: Series “ECO-Guard” C lipped Aluminum Tube Mullio n – L.M.I.
APPROVAL DOCUMENT: Drawing No. M14-01 Rev B, titled “Aluminum Tube Mullions”, sheets 1
through 9 of 9, dated 05/19/14 and last revised on 01/08/21, prepared by Al-Farooq Corporation, signed and
sealed by Jalal Farooq, P. E., bearing the Miami–Da de County Product Control Re vision stamp with the
Notice of Acceptance number and expiration date by the Miami-Dade County Product Control Section. MISSILE IMPACT RATING: Large and Small Missile Impact Resistant
LABELING: Each unit shall bear a permanent label with the manufacturer's name or logo, city, state,
series, and following statement: "Miami-Dade County Product Control Approved", unless otherwise noted
herein. RENEWAL of this NOA shall be considered after a renewal application has been f iled and there has been
no change in the applicable building code negatively affecting the performance of this product. TERMINATION of this NOA will occur after the expiration date or if there has been a revision or change
in the materials, use, and/ or manufacture of the product or process. Misuse of this NOA as an endorsement
of any product, f or sales, advertising or any other purposes shall automatically terminate this NOA. F ailure
to comply with any section of this NOA shall be cause for termination and removal of NOA. ADVERTISEMENT: The NOA number preceded by the words Miami-Dade County, Florida, and
followed by the expiration date may be displayed in advertising literature. If any po rtion of the NOA is
displayed, then it shall be done in its entirety.
INSPECTION: A copy of this entire NOA shall be provided to the user by the manufacturer or its
distributors and shall be a vailable for in spection at th e jo b site at the request of th e Building Official.
This NOA revise s NOA No. 19-0405.09 and consists of this page 1 and evidence pages E-1, E -2 a nd E-3, as
well as approval document mentioned above .
Th e submitted documentation was reviewed by Ishaq I. Chanda , P.E.
Ishaq I. Chanda , P.E.
Product Control Unit Supervisor
NOA No. 21-0 122.0 4
Expiration Date: October 23, 2024
Approval Date: March 18, 2021
E - 1
Eco Window Systems, LLC
NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
1. EVIDENCE SUBMITTED UNDER PREVIOUS NOA’s
A. DRAWINGS
1.Manufacturer's die drawings and sections.
(Submitted under NOA# 14-0529.16)
2.Drawing No. M14-01, titled “Aluminum Tube Mullions”, sheets 1 through 9 of 9,
dated 05/19/14, with revision A dated 11/15/17, prepared by Al-Farooq Corporation,
signed and sealed by Javad Ahmad , P.E.
B. TESTS
1.Test reports on: 1) Air Infiltration Test, per PA 202-94
2) Uniform Static Air Pressure Test, Loading per PA 202-94
3) Water Resistance Test, per PA 202-94
along with marked -up drawings and installation diagram of a clipped aluminum
mullion at fixed windows, prepared by Hurricane Engineering & Testing, Inc., Test
Report No. HE TI-08-2192A , dated 01/15/09, signed and sealed by Candido F. Font,
P.E.
(Submitted under NOA# 14-0529.16)
2.Test reports on: 1) Large Missile Impact Test per PA 201-94
2) Cyclic Wind Pressure Loading per PA 203-94
along with marked -up drawings and installation diagram of a clipped aluminum
mullion at a fixed window/ a single hung window, prepared by Hurricane Engineering
& Testing, Inc., Test Reports No. HE TI-08-2192B and HE TI-08-2166C , both dated
01/15/09, signed and sealed by Candido F. Font, P.E.
(Submitted under NOA# 14-0529.16)
3.Test reports on: 1) Air Infiltration Test, per FBC, TAS 202-94
2) Uniform Static Air Pressure Test, Loading per FBC, TAS 202-94
3) Water Resistance Test, per FBC, TAS 202-94
4) Forced Entry Test, per FBC 2411.3.2.1, and TAS 202-94
along with marked -up drawings and installation diagram of a clipped aluminum
mullion at a fixed window/ a single hung window , prepared by Hurricane Engineering
& Testing, Inc., Test Report No. HE TI-08-2166A , dated 01/15/09, signed and sealed
by Candido F. Font , P.E.
(Submitted under NOA# 14-0529.16)
C. CALCULATIONS
1.Structural analysis, complying with FBC 6th Edition (2017), prepared by Al-Farooq
Corporation, dated 11/30/17, signed and sealed by Javad Ahmad, P. E.
2.Glazing complies with ASTM E1300-04.
Ishaq I. Chanda , P.E.
Product Control Unit Supervisor
NOA No. 21-0 122.0 4
Expi ration Date: October 23, 2024
Approval Date: Marc h 18, 2021
E - 2
Eco Window Systems, LLC
NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
D.QUALITY ASSURANCE
1.Miami-Dade Department of Regulatory and Economic Resources (RER).
E.MATERIAL CERTIFICATIONS
1.None
F.STATEMENTS
1.Statement letter of conformance to FBC 6th Edition (2017) and of no financial
interest, issued by Al-Farooq Corporation, dated November 14, 2017, signed and
sealed by Javad Ahmad, P.E.
(Submitted under NOA# 17-1218.14)
2.Department of State Certification of Eco Window Systems, L LC as a limited liability
company, active and organized under the laws of the State of Florida, dated 03/21/13
and signed by Kurt S. Browning, Secretary of State.
(Submitted under NOA# 14-0529.16)
3.Laboratory compliance letter for Test Reports No. HE TI-08-2192A ,
HE TI-08-2192B, HE TI-08-2166A and HE TI-08-2166C, all issued by Hurricane
Engineering & Testing, Inc., dated 01/15/09, signed and sealed by Candido F. Font,
P.E.
(Submitted under NOA# 14-0529.16)
4.Proposal No. 08-0236 issued by the Product Cont rol, dated 06/04/08, signed by
Manuel Perez, P.E.
(Submitted under NOA# 14-0529.16)
G.OTHERS
1.Notice of Acceptance No. 14-0529.16, issued to Eco Window Systems, LLC for their
Series “ECO-Guard Clipped” Aluminum Tube Mullion - L.M.I., approved on
10/2 3/14 and expiring on 10/23/19.
2. EVIDENCE SUBMITTED under previous submittal
A. DRAWINGS
1.None.
B. TESTS
1.None.
C. CALCULATIONS
1.None.
Ishaq I. Chanda , P.E.
Product Control Unit Supervisor
NOA No. 21-0 122.0 4
Expiration Date: October 23, 2024
Approval Date: March 18, 2021
E - 3
Eco Window Systems, LLC
NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
3. EVIDENCE SUBMITTED under previous submittal (conti:)
D.QUALITY ASSURANCE
1.Miami-Dade Department of Regulatory and Economic Resources (RER)
E.MATERIAL CERTIFICATIONS
1.None
F.STATEMENTS
1.Statement letter verifying conformance to FBC 6th Edition (2017), issued by Al-
Farooq Corporation, dated March 21, 2019, signed and sealed by Javad Ahmad, P.E.
G.OTHERS
1.Notice of Acceptance No. 17-1218.14, issued to Eco Window Systems, LLC for their
Series “ECO-Guard Clipped ” Aluminum Tube Mullion - L.M.I., approved on
02/22/18 and expiring on 10/23/19.
4. N EW EVIDENCE SUBMITTED
A.DRAWINGS
1.Drawing No. M14-01 Rev B, titled “Aluminum Tube Mullions”, sheets 1 through 9 of
9, d ated 05/19/14 and last revised on 01/08/21, prepared by Al-Farooq Corporation,
signed and sealed by Jalal Farooq, P. E.
B.TESTS
1.None
C.CALCULATIONS
1.Anchor verification calculation, complying with FBC 7th Edition (2020), prepared by
Al-Farooq Corporation, dated 01/08/21, signed and sealed by Jalal Farooq, P. E.
D.QUALITY ASSURANCE
1.Miami-Dade Department of Regulatory and Economic Resources (RER)
E.MATERIAL CERTIFICATIONS
1.None
F.STATEMENTS
1.Statement letter verifying conformance to FBC 7th Edition (2020), issued by Al-
Farooq Corporation, dated 01/08/21, signed and sealed by Jalal Farooq, P.E.
G.OTHERS
1.This NOA revises NOA No. 19-0405.09, expiring 10/23/2024.