Loading...
HomeMy WebLinkAboutAPPROVED NOA (2)NOA No. 21-0 122.0 4 Expiration Date: October 23, 2024 Approval Date: March 18, 2021 Page 1 MIAMI –DADE COUNTY, FLORIDA PRODUCT CONTROL SECTION 11805 SW 26 Street, Room 208 DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) Miami, Florida 33175-2474 BOARD AND CODE ADMINISTRATION DIVISION T (786) 315-2590 F (786) 315-2599 NOTICE OF ACCEPTANCE (NOA) www.miamidade.gov/building Eco Window Systems, LLC 8502 NW 80th Street Medley, Fl. 33166 S COPE: This NOA is being issued under the applicable rules and regulations governing the use of construction m aterials. Th e d ocumentation submitted h as b een reviewed and accepted by Miami-Dade County RER - Product Control Sectio n to be used in Miami Dade County and other areas where allowed by the A uthority Having Jurisdiction (AHJ). This NOA shall n ot be v alid a fter th e expiration d ate stated b elow. Th e Miami-Dade C ounty Product Co ntrol Section (In Miami-Dade County) and/ or the AHJ (in areas other than Miami-Dade Co unty) reserve the right to have this product or material tested for quality assurance purposes. If this p roduct o r m aterial f ails to perform in the accepted manner, the manufacturer will incur the expense of such testing and t he AHJ may immediately revoke, m odify, o r suspend th e u se o f such p roduct or m aterial within th eir ju risdictio n. RER reserves the right to revoke this acceptance, if it is determined by Miami-Dade County Product Control Section th at this p roduct or material fails to meet the requirements o f th e applicable b uilding c ode. This product is approved as described herein and has been designed to comply with the Florida Building Code, in cluding th e High Velocity Hurricane Zo ne. DESCRIPTION: Series “ECO-Guard” C lipped Aluminum Tube Mullio n – L.M.I. APPROVAL DOCUMENT: Drawing No. M14-01 Rev B, titled “Aluminum Tube Mullions”, sheets 1 through 9 of 9, dated 05/19/14 and last revised on 01/08/21, prepared by Al-Farooq Corporation, signed and sealed by Jalal Farooq, P. E., bearing the Miami–Da de County Product Control Re vision stamp with the Notice of Acceptance number and expiration date by the Miami-Dade County Product Control Section. MISSILE IMPACT RATING: Large and Small Missile Impact Resistant LABELING: Each unit shall bear a permanent label with the manufacturer's name or logo, city, state, series, and following statement: "Miami-Dade County Product Control Approved", unless otherwise noted herein. RENEWAL of this NOA shall be considered after a renewal application has been f iled and there has been no change in the applicable building code negatively affecting the performance of this product. TERMINATION of this NOA will occur after the expiration date or if there has been a revision or change in the materials, use, and/ or manufacture of the product or process. Misuse of this NOA as an endorsement of any product, f or sales, advertising or any other purposes shall automatically terminate this NOA. F ailure to comply with any section of this NOA shall be cause for termination and removal of NOA. ADVERTISEMENT: The NOA number preceded by the words Miami-Dade County, Florida, and followed by the expiration date may be displayed in advertising literature. If any po rtion of the NOA is displayed, then it shall be done in its entirety. INSPECTION: A copy of this entire NOA shall be provided to the user by the manufacturer or its distributors and shall be a vailable for in spection at th e jo b site at the request of th e Building Official. This NOA revise s NOA No. 19-0405.09 and consists of this page 1 and evidence pages E-1, E -2 a nd E-3, as well as approval document mentioned above . Th e submitted documentation was reviewed by Ishaq I. Chanda , P.E. Ishaq I. Chanda , P.E. Product Control Unit Supervisor NOA No. 21-0 122.0 4 Expiration Date: October 23, 2024 Approval Date: March 18, 2021 E - 1 Eco Window Systems, LLC NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED 1. EVIDENCE SUBMITTED UNDER PREVIOUS NOA’s A. DRAWINGS 1.Manufacturer's die drawings and sections. (Submitted under NOA# 14-0529.16) 2.Drawing No. M14-01, titled “Aluminum Tube Mullions”, sheets 1 through 9 of 9, dated 05/19/14, with revision A dated 11/15/17, prepared by Al-Farooq Corporation, signed and sealed by Javad Ahmad , P.E. B. TESTS 1.Test reports on: 1) Air Infiltration Test, per PA 202-94 2) Uniform Static Air Pressure Test, Loading per PA 202-94 3) Water Resistance Test, per PA 202-94 along with marked -up drawings and installation diagram of a clipped aluminum mullion at fixed windows, prepared by Hurricane Engineering & Testing, Inc., Test Report No. HE TI-08-2192A , dated 01/15/09, signed and sealed by Candido F. Font, P.E. (Submitted under NOA# 14-0529.16) 2.Test reports on: 1) Large Missile Impact Test per PA 201-94 2) Cyclic Wind Pressure Loading per PA 203-94 along with marked -up drawings and installation diagram of a clipped aluminum mullion at a fixed window/ a single hung window, prepared by Hurricane Engineering & Testing, Inc., Test Reports No. HE TI-08-2192B and HE TI-08-2166C , both dated 01/15/09, signed and sealed by Candido F. Font, P.E. (Submitted under NOA# 14-0529.16) 3.Test reports on: 1) Air Infiltration Test, per FBC, TAS 202-94 2) Uniform Static Air Pressure Test, Loading per FBC, TAS 202-94 3) Water Resistance Test, per FBC, TAS 202-94 4) Forced Entry Test, per FBC 2411.3.2.1, and TAS 202-94 along with marked -up drawings and installation diagram of a clipped aluminum mullion at a fixed window/ a single hung window , prepared by Hurricane Engineering & Testing, Inc., Test Report No. HE TI-08-2166A , dated 01/15/09, signed and sealed by Candido F. Font , P.E. (Submitted under NOA# 14-0529.16) C. CALCULATIONS 1.Structural analysis, complying with FBC 6th Edition (2017), prepared by Al-Farooq Corporation, dated 11/30/17, signed and sealed by Javad Ahmad, P. E. 2.Glazing complies with ASTM E1300-04. Ishaq I. Chanda , P.E. Product Control Unit Supervisor NOA No. 21-0 122.0 4 Expi ration Date: October 23, 2024 Approval Date: Marc h 18, 2021 E - 2 Eco Window Systems, LLC NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED D.QUALITY ASSURANCE 1.Miami-Dade Department of Regulatory and Economic Resources (RER). E.MATERIAL CERTIFICATIONS 1.None F.STATEMENTS 1.Statement letter of conformance to FBC 6th Edition (2017) and of no financial interest, issued by Al-Farooq Corporation, dated November 14, 2017, signed and sealed by Javad Ahmad, P.E. (Submitted under NOA# 17-1218.14) 2.Department of State Certification of Eco Window Systems, L LC as a limited liability company, active and organized under the laws of the State of Florida, dated 03/21/13 and signed by Kurt S. Browning, Secretary of State. (Submitted under NOA# 14-0529.16) 3.Laboratory compliance letter for Test Reports No. HE TI-08-2192A , HE TI-08-2192B, HE TI-08-2166A and HE TI-08-2166C, all issued by Hurricane Engineering & Testing, Inc., dated 01/15/09, signed and sealed by Candido F. Font, P.E. (Submitted under NOA# 14-0529.16) 4.Proposal No. 08-0236 issued by the Product Cont rol, dated 06/04/08, signed by Manuel Perez, P.E. (Submitted under NOA# 14-0529.16) G.OTHERS 1.Notice of Acceptance No. 14-0529.16, issued to Eco Window Systems, LLC for their Series “ECO-Guard Clipped” Aluminum Tube Mullion - L.M.I., approved on 10/2 3/14 and expiring on 10/23/19. 2. EVIDENCE SUBMITTED under previous submittal A. DRAWINGS 1.None. B. TESTS 1.None. C. CALCULATIONS 1.None. Ishaq I. Chanda , P.E. Product Control Unit Supervisor NOA No. 21-0 122.0 4 Expiration Date: October 23, 2024 Approval Date: March 18, 2021 E - 3 Eco Window Systems, LLC NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED 3. EVIDENCE SUBMITTED under previous submittal (conti:) D.QUALITY ASSURANCE 1.Miami-Dade Department of Regulatory and Economic Resources (RER) E.MATERIAL CERTIFICATIONS 1.None F.STATEMENTS 1.Statement letter verifying conformance to FBC 6th Edition (2017), issued by Al- Farooq Corporation, dated March 21, 2019, signed and sealed by Javad Ahmad, P.E. G.OTHERS 1.Notice of Acceptance No. 17-1218.14, issued to Eco Window Systems, LLC for their Series “ECO-Guard Clipped ” Aluminum Tube Mullion - L.M.I., approved on 02/22/18 and expiring on 10/23/19. 4. N EW EVIDENCE SUBMITTED A.DRAWINGS 1.Drawing No. M14-01 Rev B, titled “Aluminum Tube Mullions”, sheets 1 through 9 of 9, d ated 05/19/14 and last revised on 01/08/21, prepared by Al-Farooq Corporation, signed and sealed by Jalal Farooq, P. E. B.TESTS 1.None C.CALCULATIONS 1.Anchor verification calculation, complying with FBC 7th Edition (2020), prepared by Al-Farooq Corporation, dated 01/08/21, signed and sealed by Jalal Farooq, P. E. D.QUALITY ASSURANCE 1.Miami-Dade Department of Regulatory and Economic Resources (RER) E.MATERIAL CERTIFICATIONS 1.None F.STATEMENTS 1.Statement letter verifying conformance to FBC 7th Edition (2020), issued by Al- Farooq Corporation, dated 01/08/21, signed and sealed by Jalal Farooq, P.E. G.OTHERS 1.This NOA revises NOA No. 19-0405.09, expiring 10/23/2024.