HomeMy WebLinkAboutCreekside Lot 112-UG Plumbing.pdf®UNIVERSAL
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date: S_ Z? _ Z I Permit No.
Project: e /2-k'"e f ti&
Address: QyM6 TOi Gmac Dir.
// Z
Check one:
4 Regular Inspection:
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
,:7-/ b 3 - o8 34,
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
}(
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
I Storm Piping & Test
Insulation
Sheet Rock
Appliance/EquipmentfRe-i
ures
Wall & Ceiling
Roofing
Lighting Protection
ipment
Equipment
Re -inspection
Re -inspection
nspection
Re -inspection
Final Building
Final Electrical
l PlumbingI
Final Mechanical
Other Inspection Type:
Area Inspected/Code: iozc� G
Inspection Results: �KAP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments:
1.
2.
3.
4.
5.
6.
7.
Inspector's Name: L-,, 6 Lic.#: 14AJ V 4 ff If
OFFICES THROUGHOUT FLORIDA
607 N W Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com