APPROVED Prices
Oceanique Bldg. A - Bid Spreadsheet - Units 201-207 & 605 Description1 Mobilization LS $9,200-00 $9,200 1 2 Demobilization 1 LS S1 000.00 S1000 3 Permitting at Cost 1 LS $0 4 Concrete Beam Repair CF $0 5 Concrete Column Repair CF $0 6 Concrete Deck Slab Repair Full Depth) 142 SF $78.00 $11,076 7 Concrete Deck Slab Repair(Overhead) SF $0 8 Concrete Deck Slab Repair Partial SF $0 9 Concrete Deck Slab Repair 12" Deep Ede 329 LF $110.00 $36,190 10 Concrete Wall Repair CF $0 11 Concrete Stair Repair CF $0 121 Expansion Joints LF $0 13 Epoxy injection overhead LF LF $0 14 Epoxy Injection Vertical LF LF $0 15 Horizontal cracks ravi feed LF LF $0 16 Galvashield XP embedded anodes 25 EA $50.00 $1,250 17 Migrating Corrosion Inhibitor Sika Ferro and 903 1916 SF $1.99 $3,813 18 Water roofin Urethane 1916 SF $4.50 $8,622 19 Waterproofing SIKA, clear 3290 SF $0 To be applied over existing stucco wall below 2nd floor 10' wall x 329 LF 20 Surface Preparation 1916 SF $3.75 $7,185 Prior to flash patch and waterproofing 21 Painting SF $0 22 Resla e open concrete surface for positive draining 620 SF $19.00 $11,780 Flash patch 23 Remove Stucco & Re -Install 170 SF $20.00 $3,400 4" thick slab x 329 LF & 2" up the wall of balcony perimeter (approx. 400 LF 24 Floorin Coatin Removal SF $0 25 S ra Deck with stain 1916 SF $4.00 $7,664 26 Install caulk joint around perimeter & eve 20' for control joints LF $0 27 Remove store, & reinstall top/bottom track only LF $0 28 Preparation & testing of concrete Eylinders EA $0 Includes slump test 29 Dust wall Installation & Removal LF $0 30 Remove & dispose of Sliding Glass Doors LF $0 31 Remove & dispose of Glass Window Systems LF $0 32 Remove & dispose of Raclin LF $0 33 Remove, store, & reinstall Sliding Glass Doors LF 1 $0 34 Remove, store, & reinstall Glass Window Systems LF $0 35 Remove store & reinstall Shutters 329 LF $55.00 $18 095 36 Remove, store, & reinstall Railing 329 LF $55.00 $18 095 37 Post Tension Replacement EA $0 38 Post Tension Lock Off Repair 10 EA $880.00 $8 800 39 Install Hook Bars at Post Base EA $0 40 Install New Screws For Rail Connectors SF 0 41 Electrical Conduit EA $0 42 #4 Dowel Bars EA $0 43 Support Plates for Post Tension Lock Off EA $0 44 Rust Spot Repair EA 0 45 TOTAL LUMP SUM CONTRACT PRICE $146.170 46 Estimated Start Date: December 2020 47 Estimated completion Date: February 2021