Loading...
HomeMy WebLinkAboutProject Information (2) E +4J i� ' , , , , , t , Ftovresce,,,f a �_•`f---.__ ._'- ( ....--' Ste- - -i__ T -'.1---_•�-`i �0 I '__, { - ; -�* V 4 S - _.__V -s t{ ., ;- T' _ _ _ -•Cyr S �--- r- ` - it ci it RECENEDfl _ -- ' �epartMonr-T _.. ' f 1FT { St,tuck County ix 0 + _t 4 4,C,c fl�.� -=e--* 'e e r' - ' ' ! A te''-F SSOO GA ' � � _-L-_ � � . / ` - � � ` � - it ja ji iL It t-4 It | ` ~ � --i--f--i-f -j--�- -�-�'-�-�-1--�-�--�--�-|--�--i--f-��--�-� �-|--�-l-- - [ ( --! T -T ��-T-� ` C ct SS 1 A r t 'j DATE 04-01 21 FP- Electric Service Standards PREPAREDBY SuILE i _ SECTION:PAGE CO, Delivery Assurance- IV.SERVICE and METER CONNECTIONS IV:19 of 24 � Design Support FIGURE IV-1 I b FPL Buried Service Lateral—Meter Socket&Down Pipe Requirements (references to notes shown in Figure IV-11a) PREFERRED METHOD ALTERNATE METHOD (Using 90 degree bends) (Using 2-45 degree bends) Customer supplied and Customer supplied and installed meter socket Installed meter socket Customer 2-or4' Customer2 or4' Rigid Galvanized. Rigid Galvanized. RECEIVE© Intermediate,or Intermediate,or Schedule 80 PVC Sdredttte 80 PVC 6'Max. (Notes 4&5) 6.rear. (Notes 4&5) MAT'2 .S 2021 5'Min. 5 LIM Pe St.ittiiing1e 0aftmOt County Strap conduit to wall `l Strap conduit to wall Grade Grade 24'Min.36"Max. 24'Mim 36'Max. (24-Preferred) (24'Preferred) See Table A �— (90 deg bends) (Notes 2 8 8) FPL Service Cable in Schedule 40 Conduit to padmounted See Table A 45 transformer,handhole,or riser(See Notes 1&3) (N deg bends) (No6m 2&8) EXTENDING CONDUIT 24"BEYOND OBSTRUCTIONS Customer supplied and Typical meter can hisfafled meter socket Neutral supplied and installed by the Customer FPL u O If Load Conductors enter from —————————————— Service 0 0 op the side.Entrance must be Customer Conductors—� 0 u opposite side of FPL Rigid Galvanized, (by FPL) I �� conductors.See Fig.1V-9. Ce er pos may not be Intermediate.or ntitions Schedule 80 PVC =I used for downpipe. 6 Max (Notes 4&5) �► 5 Min. Line Customer's Service Load Entrance Condudors (by Customer) Strap owl"to wall IMPORTANT—Please distinguish between Overhead and Underground(URD) meter sockets when purchasing.(See FPL Approved List in Section Vil). I Grade i r 24' Note:If FPL Service Conductors(tine side)are parallel#410 tnplex.(hen the customer shall provide and install connectors designed for multiple conductors in 24'NIL W&1wL the meter socket. (24•Preferred) Table A—Galvanized or Schedule 80 PVC Note 2&8 WIm Sire Downpipe 90 Degree Bends 1 45 Degree Bends �p Cu or AI Bends Radius Bends I Radius 1/0or410 2 1 2"-90 24" 2"-45 18" FPL"Service Cable In Schedule 40 Conduit to padmounted 2—410 2—Z" 2"—90 24" 4 2"—4s 24" transformer,haredhoie,or riser(See Notes 1&3) 2-410 4" 1 4—90 1 36" 1 U2)0"-45 24" 0 2021,Florida Power&Light Company Page 19 of 24 //� DATE f(� tom.. Electric Service Standards 04-01-21 PREPARMaY SUBJECT SECTION:PAGE Delivery Assurance— IV.SERVICE and METER CONNECTIONS IV:16 of 24 Design Support FIGURE IV-9 Lug Type Meter Socket Installations Belleville Washer Flat Washer Belleville Was Washer Washer\ WIRE WIRE Meter LUG Mew Block LUG Block Anti-Rotation Ridge must be on lugs used in K 7& K,7T type cans. ACCEPTABLE NOT ACCEPTABLE PROPER INSTALLATION OF WASHERS&LUGS ON LUG-TYPE METER CANS Be sure the flat washer is placed between the Belleville Washer and the wire lug. This installation will ensure the maximum surface contact area of the lug and the meter block. Be sure the wire is placed properly in the lug so it will not interfere with the tightening of the Belleville Washer. The lug used in the 400 amp(K-7,no new installations—maintenance only)and 600 amp(K-7T)Marls must have an anti-rotation ridge as shown. This ridge is not required in smaller cans. *`*ACCEPTABLE CONFIGURATIONS' 'NOT ACCEPTABLE' Mains may only METER extend from ONE METER METER CAN side of meter can, CAN CAN on OPPOSITE � O O side of meter can MAIN _ from Downpipe __{ LINE MARJ MAIN TROUGH SWITCH LINE , LINE GUTTER I SWITCH SWITCH MAIN MAIN LINE LINE SWITCH SWITCH MAIN W DONPIPE FOR LINE FPL SERVICE SWITCH I{ DOWNPIPE FOR FPL SERVICE In underground installations,when customer's conductors are parallel,customers conductors MUST be kept entirely to one side of the meter can,leaving the opposite side of the meter can unobstructed for FPL's conductor.When toad conductors enter through the bottom rear of the meter can they must be kept entirely to one side so not to interfere with the FPL conductor. 0 2021.Florida Power&Light Company Page 16 of 24 DATE 0"1 21 FPL Electric Service Standards PREPARED BY SUBJECT SECTION:PAGE i DetiveryAssurance— IV.SERVICE and METER CONNECTIONS IV,17of24 Design Support FIGURE IV-10 Intersystem Bonding Termination NEC Article 250.94 has been revised in the 2008 Code,thereby affecting all new installations and existing installations where alterations are made.The Code has identified a new device called the Intersystem Bonding Termination or IBT.The IBT Is defined as"a device that provides a means for connecting communications system(s),grounding conductor(s)and bonding conductor(s)at the service equipment or metering equipment enctosuW or at the disconnecting means for butfdings or structures supplied by a feeder or branch circuit." PREFERRED INSTALLATION O Oo OO 0 0 0 0 n Phone CA7V o on ® n o 0 0 n o Bon o n � n o l I (—————— Note:>f the ground wire is enclosed in conduit, t— —————� I there must be an exposed section of ground wire Grounds within 6 inches of the bottom of the meter enclosure to install the IBT.The grand wire runs unbroken through,and is attached to,the IBT. Grade ALTERNATE INSTALLATION O OO OO � 0 0 0 0 Phone CAN o 0 ® E o m Eli 0 C1 , 0 p p [ ID 1 Bond o o--1 0 p o ( ( Note:If the ground wire is enclosed in conduit, Gmmds the bond from the panel is looped through the lE1T ground terminal in the meter enclosure and connected to the 113T. Grade 0 2021,Florida Power&Ught company Page 17 of 24