Loading...
HomeMy WebLinkAboutAPPROVED SINGLEY roof info`L L:! LL �r ST. LUCIE WORKS ST LUCIE COUNTY ROOFING PERMIT INFORMATION SHEET Florida Building Code 7th Edition (2020) Based an Section 1525 of the Florida Building Code - Building INSTRUCTION PAGE COMPLETE THE NECESSARY SECTIONS OF THE UNIFORM ROOFING SHEET APPLICATION FORM AND ATTACH THE REQUIRED DOCUMENTS AS NOTED BELOW: Roof System Low Slope Application Prescriptive BUR-RAS 150 Asphaltic Shingles Concrete or Clay Tile Metal Roofs Wood Shingles and Shakes 'Other Required Sections of the Permit Application Form A, B, C A,8,C A, B, ❑ A, 6, D, E A,B,❑ A, B, D As Applicable Attachments Required See List Below 1,2,3.4,6.6,7 2,4,5,6,7 19,4,5,6,7 1,2,3,4,5,6,7 1,2,3,4,5,6,7 194,5,6,7 1,2,3,4.5,6,7 ATTACHMENTS REQUIRED As Applicable): 1. Fire Directory Listing Page 2. From Product Approval: Front Page Specific System Description Specific System Limitatlons General Limitations Applicable Detail Drawings 3. Design Calculations per Chapter 16, or if applicable, RAS 127 or RAS 12-8 4. other Component of Product Approval 5. Municipal Permit Application 6. Owners Notification for Roofing Considerations (Reroofing Only) 7. Any Required Roof Testing/Ca Iculation Documentation Form RooflnfoFeb21 Rev Feb 18, 2021 ST. LUCIE'.,VORKS Section C (Low Slope Roof) Fill in specific roof assembly components and identify manufacturer (If a component is not used, identify as "NA") System Manufacturer: Product Approval No.: Design Wind Pressures, From RAS 128 Or Calculations: Zone 1': —zone 1: Zone 2: _Zone 3: _ Max. Design Pressure, from the specific product approval system: Deck: Type: Gauge Thickness: Slope: Anchor/Base Sheet & No. df Ply(s): Anchor/Base Sheet Fastener/Bonding Material: Insulation Base Layer: Base Insultation Size and Thickness: Base Insulation Fastener/Bonding Material: Top Insulation Layer: Top Insulation Size and Thickness: Top Insulation Fastener/Bonding Material: Base Sheets) & No. of Ply(s): Base Sheet Fastener/Bonding Material: Ply Sheet(s)' & No. of Ply(s): Ply Sheet Fastener/Bonding Material: Top Ply: Top Ply Fastener/Bonding Material: Surfacing: Fastener Spacing for Anchor/Base Sheet Attachment: Zone 1':_" oc IT Lap, If Rows— ®_ on Zone 1:—." oc @ Lap, If Rows _ ®_' oo Zone 2:_" oc @ Lap, # Rows _ @ _ oo Zone 3:_," oc @ Lap, # Rows_ ®_'oo Number of Fasteners Per Insulation Board: Zone 1'—Zone 1—Zone 2:_Zone 3:_ Illustrate Components Noted and Details as Applicable: Woodblocking, Gutter, Edge Termination, Stripping, Flashing, Continuous Cleat, Cant Strip, Base Flashing, CounterRashing, Coping, Etc., Indicate: Mean Roof Height, Parapet Height, Height of Base Flashing, Component Material, Material' Thickness, Fastener Type, Fastener Spacing or Submit Manufacturers Details that Comply with RAS 111 and Chapter 16., ST. LUCIE WORKS Section D (Steep Slope Roof System) Roofsystem Manufacturer: UA TAYLOR ROOFING 5V CRIMP Notice of Acceptance Number: FL#17443.1 Minimum Design Wind Pressures, If Applicable (From RAS 127 or Calculations): Zone 1. -69 Zone 2e: -119Zone 2n: Zone 2r: -1�one 3erl�one 3r: \FTRwf OD' t EEL& STICK-OWENS CORNING TITANIUM-FL#11602.1 Roof Sbpe: 6 12 er: M.,. Ridge VBM�8hOr17ener Type&Spacing: 6"FIELn/4"PERIMETER, en RING SHgNK NAILS Adhesive Type: Type Cap Sheet Mean Roof HeiRoof Covering: METAL Type & Sim Drip Edge: ST. LUCIE - iORKS Section E (Tile Calculations) For Moment based tile systems, choose either Method 1 or 2. Compare the values for M, with the values from Mr. If the Mr values are greater than or equal to the M,values, for each area of the roof, then the tile attachment method is acceptable. Method 1'Moment Based Tile Calculations Per RAS 12T (Zone 1: -X;L = _ )_ MO: Mr_ Product Approval M. (Zone 2e:-_x)._=, I_Mg: __Mr_ Product Approval Mf (Zone 2n: '_x,l_= _)-Mg;_=Ma_ Product ApprovalM (Zone 2r: _XX_= I- Mg: _=Mg_ product Approval Mf (Zone 3e: '_xl_= _)- MT. _=M,a,_ Product Approval Mf (Zone 3r: _X )._= -lik M,g_ Product Approval Mf Method 2 "Simplified Tile Calculations Per Table Below" Required Moment of Resistance (M.) From Table R.I. .-d.- n.....,..._i .. Mf required Moment Resistance- ' Mean Roof Height Roof Slope 15' 20' 25' 30' 40' 2:12 34.4 36.5 38.2 39.7 42.2 3:12 32.2 34.4 36.0 37.4 39.8 4:12 30.4 32.2 33.8 35.1 37.3 5:12 28.4 30.1 31.6 32.8 34.9 612 26.4 28.0 29.4 30.5 32.4 7:12 24.4 25.9 27.1 28.2 30.0 Must be used In conJunctlon with a list of moment based tihe systems For Uplift based the systems use Method 3. Compare the values for F' with the values for F, If the F'values are greater than or equal to the F, values, for each area of the roof, then the tile attachment method is acceptable. Method 3 "Uplift Based Tile Calculations Per RAS 12T (Zone 1: _x L_=x W:=_) -W; cos r Fri Product Approval F' (Zone 2e:_x L_=xW:=_J-W_Cos r=FrU Product Approval F' (Zone 2n:_x L_=rr W� �_W; cos r= F,z„_ Product Approval F' (Zone 2r: x I.x W:=_J _W: cos r_ Fa,_ Product Approval F' (Zone 3e: _x L=xW:=____j-W:_Cos r=Fe._ Product Approval F' (Zone 3r. _x L= x W:=___j -W:_ cos r= F,3,_ Product Approval F'. Where to Obtain Information Description Symbol Whemtofind Design Pressure Zones 1, 2e, 2n, 2r, 3.,3, From applicable cable in RAS 127 or by an engineering analysis prepared by PE based on AKE 7 Mean Roof Height H Job Site Roof Slope 0 Job Site Aerodynamic Multiplier a Product Approval Restoring Moment due to Gravity Mr Produa Approval Attachment Resistance M, Product -Approval Required Moment Resistance Ms Calculated Minimum Attachment Resistance r Product Approval Required Uplift Resistance F, Calculated Average Tile Weight W Product Approval Tile Dimensions L=length W=width Product Approval All calculations must be submitted to the building official at the time of permit application.