HomeMy WebLinkAboutAPPROVED SINGLEY roof info`L L:!
LL �r
ST. LUCIE WORKS
ST LUCIE COUNTY ROOFING PERMIT INFORMATION SHEET
Florida Building Code 7th Edition (2020)
Based an Section 1525 of the Florida Building Code - Building
INSTRUCTION PAGE
COMPLETE THE NECESSARY SECTIONS OF THE UNIFORM ROOFING SHEET
APPLICATION FORM AND ATTACH THE REQUIRED DOCUMENTS AS NOTED
BELOW:
Roof System
Low Slope Application
Prescriptive BUR-RAS 150
Asphaltic Shingles
Concrete or Clay Tile
Metal Roofs
Wood Shingles and
Shakes
'Other
Required Sections of
the Permit Application
Form
A, B, C
A,8,C
A, B, ❑
A, 6, D, E
A,B,❑
A, B, D
As Applicable
Attachments Required
See List Below
1,2,3.4,6.6,7
2,4,5,6,7
19,4,5,6,7
1,2,3,4,5,6,7
1,2,3,4,5,6,7
194,5,6,7
1,2,3,4.5,6,7
ATTACHMENTS REQUIRED As Applicable):
1. Fire Directory Listing Page
2. From Product Approval:
Front Page
Specific System Description
Specific System Limitatlons
General Limitations
Applicable Detail Drawings
3. Design Calculations per Chapter 16, or if applicable, RAS 127 or RAS 12-8
4. other Component of Product Approval
5. Municipal Permit Application
6. Owners Notification for Roofing Considerations (Reroofing Only)
7. Any Required Roof Testing/Ca Iculation Documentation
Form RooflnfoFeb21 Rev Feb 18, 2021
ST. LUCIE'.,VORKS
Section C (Low Slope Roof)
Fill in specific roof assembly components and identify
manufacturer
(If a component is not used, identify as "NA")
System Manufacturer:
Product Approval No.:
Design Wind Pressures, From RAS 128 Or Calculations:
Zone 1': —zone 1: Zone 2: _Zone 3: _
Max. Design Pressure, from the specific product approval
system:
Deck:
Type:
Gauge Thickness:
Slope:
Anchor/Base Sheet & No. df Ply(s):
Anchor/Base Sheet Fastener/Bonding Material:
Insulation Base Layer:
Base Insultation Size and Thickness:
Base Insulation Fastener/Bonding Material:
Top Insulation Layer:
Top Insulation Size and Thickness:
Top Insulation Fastener/Bonding Material:
Base Sheets) & No. of Ply(s):
Base Sheet Fastener/Bonding Material:
Ply Sheet(s)' & No. of Ply(s):
Ply Sheet Fastener/Bonding Material:
Top Ply:
Top Ply Fastener/Bonding Material:
Surfacing:
Fastener Spacing for Anchor/Base Sheet Attachment:
Zone 1':_"
oc IT Lap, If Rows— ®_ on
Zone 1:—."
oc @ Lap, If Rows _ ®_' oo
Zone 2:_"
oc @ Lap, # Rows _ @ _ oo
Zone 3:_,"
oc @ Lap, # Rows_ ®_'oo
Number of Fasteners Per Insulation Board:
Zone 1'—Zone 1—Zone 2:_Zone 3:_
Illustrate Components Noted and Details as Applicable:
Woodblocking, Gutter, Edge Termination, Stripping,
Flashing, Continuous Cleat, Cant Strip, Base Flashing,
CounterRashing, Coping, Etc.,
Indicate: Mean Roof Height, Parapet Height, Height of Base
Flashing, Component Material, Material' Thickness, Fastener
Type, Fastener Spacing or Submit Manufacturers Details that
Comply with RAS 111 and Chapter 16.,
ST. LUCIE WORKS
Section D (Steep Slope Roof System)
Roofsystem Manufacturer: UA TAYLOR ROOFING 5V CRIMP
Notice of Acceptance Number: FL#17443.1
Minimum Design Wind Pressures, If Applicable (From RAS 127 or Calculations):
Zone 1. -69 Zone 2e: -119Zone 2n: Zone 2r: -1�one 3erl�one 3r:
\FTRwf
OD'
t EEL& STICK-OWENS CORNING TITANIUM-FL#11602.1
Roof Sbpe:
6 12
er: M.,. Ridge VBM�8hOr17ener Type&Spacing: 6"FIELn/4"PERIMETER, en RING SHgNK NAILS
Adhesive Type:
Type Cap Sheet
Mean Roof HeiRoof Covering: METAL
Type & Sim Drip
Edge:
ST. LUCIE - iORKS
Section E (Tile Calculations)
For Moment based tile systems,
choose either Method 1 or 2. Compare the values for M, with the values from Mr. If the Mr values
are greater than or equal to the M,values, for each area of the roof, then the tile attachment method is acceptable.
Method 1'Moment Based Tile Calculations Per RAS 12T
(Zone 1: -X;L
= _ )_ MO: Mr_ Product Approval M.
(Zone 2e:-_x)._=,
I_Mg: __Mr_ Product Approval Mf
(Zone 2n: '_x,l_=
_)-Mg;_=Ma_ Product ApprovalM
(Zone 2r: _XX_=
I- Mg: _=Mg_ product Approval Mf
(Zone 3e: '_xl_=
_)- MT. _=M,a,_ Product Approval Mf
(Zone 3r: _X
)._= -lik M,g_ Product Approval Mf
Method 2 "Simplified Tile Calculations Per Table Below"
Required Moment of Resistance (M.) From Table R.I. .-d.- n.....,..._i ..
Mf required Moment Resistance- '
Mean Roof Height Roof Slope
15'
20'
25'
30'
40'
2:12
34.4
36.5
38.2
39.7
42.2
3:12
32.2
34.4
36.0
37.4
39.8
4:12
30.4
32.2
33.8
35.1
37.3
5:12
28.4
30.1
31.6
32.8
34.9
612
26.4
28.0
29.4
30.5
32.4
7:12
24.4
25.9
27.1
28.2
30.0
Must be used In conJunctlon with a list of moment based tihe systems
For Uplift based the systems use Method 3. Compare the values for F' with the values for F, If the F'values are greater than or
equal to the F, values, for each area of the roof, then the tile attachment method is acceptable.
Method 3 "Uplift Based Tile Calculations Per RAS 12T
(Zone 1: _x L_=x W:=_) -W; cos r Fri Product Approval F'
(Zone 2e:_x L_=xW:=_J-W_Cos r=FrU Product Approval F'
(Zone 2n:_x L_=rr W� �_W; cos r= F,z„_ Product Approval F'
(Zone 2r: x I.x W:=_J _W: cos r_ Fa,_ Product Approval F'
(Zone 3e: _x L=xW:=____j-W:_Cos r=Fe._ Product Approval F'
(Zone 3r. _x L= x W:=___j -W:_ cos r= F,3,_ Product Approval F'.
Where to Obtain Information
Description
Symbol
Whemtofind
Design Pressure
Zones 1, 2e, 2n, 2r, 3.,3,
From applicable cable in RAS 127 or by an engineering analysis
prepared by PE based on AKE 7
Mean Roof Height
H
Job Site
Roof Slope
0
Job Site
Aerodynamic Multiplier
a
Product Approval
Restoring Moment due to Gravity
Mr
Produa Approval
Attachment Resistance
M,
Product -Approval
Required Moment Resistance
Ms
Calculated
Minimum Attachment Resistance
r
Product Approval
Required Uplift Resistance
F,
Calculated
Average Tile Weight
W
Product Approval
Tile Dimensions
L=length W=width
Product Approval
All calculations must be submitted to the building official at the time of permit application.