HomeMy WebLinkAboutCreekside Lot 112-Sewer Connect.pdf®UNIVERSAL"
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date: 5 Z$ ' z /
Project: 0- t2je_g Side
Address: flf68 J0,/_.,tt ,q c
1/ Z
Check one:
Regular Inspection:
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
Permit No. ,2 6a 3- D S 3.6
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type:
Area Inspected/Code:
Inspection Results: O AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved Not Ready
Conditions/Comments: X)6 % /5L.1 o 7
1. - 1
2.
3.
4.
5.
6.
7.
Inspector's Name: o Lic.#: /S k L/60 F
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com