Loading...
HomeMy WebLinkAboutTermite Treatment Planning Development Services Building &Code Regulation Division 2300 Virging&Ave © o (Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION 502L TREATMENT PERMIT #: SLC JOB ADD ESS: P '9ACL BUILDER/CONTRACTOR: PEST CONTROL CONTRACTOR: EVIL -A-BUG TERMITE&PEST CONTROL INC. PEST CONTROL LICENSE #: JB175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: 1�� Chemicals used: BASELINE Percentage of solution: .06% Total gallons used: , 1 --- _ Date-of-Treatment:--(,;)- -/- _- _,_ __ ___Time_of-Treatment:___-J Footingslab 1st Treatment Treatment Re-Treat Re-Treat Driveway Pools 1st Treatment 1st Treatment Re-Treat Re-Treat Other -Perimater for Final Inspection 1st Treatment Re-Treat M 5�MRACI.&z=), ('6 r? Signature of Exte Ina or 6/to/ Note.• There must be a completed form for each requlred treatment or re-treatment and thls form must_ be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fall and a re-Inspection fee charged. FBC104.2.6 Certlficate of protective Treatment for preventlon of termites A weather reslstant jobsite posting board shall be provided to receive duollcate Treatment Certificates as each required protective treatmentis completed, providing a copy for the person the permit is Issued to and another copy for the building permit files The Treatment Certificate shall provide the product used, Identity of the applicator, time and date of the treatment,site location, area treated,chemical used,percent concentration and number ofgallons used, to establish a vedflable record of protective treatment: If the soll chemical barrier method for termite prevention is used,final exterior treatment shall be completed prior to final building approval. St Lucia County requires for the ft'ona9 inspection for C% a Permanent Sticker to be placed on the electrical panel box cover, Eieting WO the treatments and dates of awgications. Revised 7/24/2014 i Planning &Development Services Building &Code Regulation Division • 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #: O-- OZ 6 JOB ADDRESS: d(, do L44& BUILDER/CONTRACTOR: �� , ;nt.l� 1-l�t 06YT&r� PEST CONTROL CONTRACTOR: EVICT-A-BUG 4RMITE&PEST CONTROL INC. PEST CONTROL LICENSE #: JB175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: S9 sIF " lr Chemicals used: DOMINION 2L Percentage of solution: .05% Total gallons used: /0 Date of Treatment: d Aq), 7 Time of Treatment: •3' S Footing Slab 1st Treatment 1st Treatment Re-Treat Re-Treat Driv ay Pools 1st Treatment 1st Treatment Re7Treat Re-Treat Other Perimeter for Fin I Inspection; 1st Treatment Re-Treat lo �_ Y 1 '.` 679nature of E ermin Date'. Note: There must be a completed form for each required treatment or re-treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re-inspection fee charged. FBC104.2.6 Certificate of Protective.Treatment for prevention of termites A weather resistantjobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment,site location, area treated, chemical used,percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014 I Planning &Development Services Sudlding&Code ReeguRation Division 2300 Virginia Ave Fort Pierce,FL 34982 772-462-2172 Pax 772-462-6443 CONSTRUCTIOM, SOIL Tl MATE MEET PERMIT #: /905 7 !/,P-Ifcc JOB ADDRESS: el BUILDER/CONTRACTOR; g\ ' '00 '1 c PESO'CONTROL CONTRACTOR: !CT A-cur.TERM{rE&PEST CONTROL INC. PEST CONTROL LICENSE #:ml7w7s We,the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National nest Control Association. Square feet if area treated: C Oy Chemicals used: DOMtN1ON.2L Percentage of solution: •05% Total gallons used: 10 G Date of Treatment: Time of Treatment: Cif Footing Slab 1�`Treatment I-"Treatment Re-Treat Re-Treat Driveway Pools i't Treatment T. e f2eTreat xe Other' Peri eter f Final Inspectl 1"Treatment , Re-Treat Sig re of Exte r Dag --- Note., There must be a completed form for each required alrnentor eatment.and this form must lie on the_iob site to be picked up by the Inspector at time of each in on ar the scheduled Inspecolon m7l fail and a ra4nspectlon fee charged. FEC204.2.6 Cettrfrcate of Pfatective Treatment for prevention of termites: A weat her resistant jobsite.posting board shall be provided to iww)le duplicate TreatmentCerdficates as each required proteWi e treatment Is completed, prot4a7ng a.copy for the person the p-mit Is issued to and anal sr copy for the bullayng permitfiles Me Treatiftel?t QwMate shall provide the product used,ldanttty oftfle appll ator,.limp and date of the treatment,ske location;area treated,chemical used,percent cnncent WNW and number ofgallons used,to establish a ved&Ne record of protedive treatment ff the soil chemical bamlermethod for tern z&prevention is used,final exte,^ibr treatmentshall be completed prior to final building approval. St Lucie Caurftyy requires for the final insPecthcn for CO,a trmaneent Sticker to be weed on the e0ecw1call panel box cover, Usti ng an tine&eab:ents and abates of applications. Revised 7/2a/2014 t