Loading...
HomeMy WebLinkAboutPTC HUSSMANN COLD CASE ROLLOUT - Electrical PlumbingAA-6 1Pc1 J 1Pc1Pc 1Pc AA-2,4AA-10,12 AA-8 30/3 NF 3R 30/3 NF 3R 1Pc1PcAA-14,16,18 AA-20,22,24 2 3 2 3 LOCATED ON ROOF. COORDINATE LOCATION WITH PROJECT MANAGER. WPG 4 AA-26 KVA,AMPERES CAB AMPERESPANEL DE-RATING 80% TOTAL CONN. LOAD $$9‘:61$0/2UPSTREAM DEVICE - 225A LOAD TYPE (LABEL)LOAD (KVA)CODEBREAKERWIRE SIZECIRCUITNUMBERCIRCUITNUMBERWIRE SIZEBREAKERCODELOAD (KVA)LOAD TYPE (LABEL) A B C A B C SPACE ONLY 0.0 1 2 10 15 HA 1.2 GRAB-N-GO CASE 1Pc SPACE ONLY 0.0 3 4 1.2 SPACE ONLY 0.0 5 6 12 15 0.2 GRAB-N-GO CASE 1Pc SPACE ONLY 0.0 7 8 12 15 0.2 GRAB-N-GO CASE 1Pc SPACE ONLY 0.0 9 10 10 15 HA 1.2 GRAB-N-GO CASE 1PcSPACE ONLY 0.0 11 12 1.2 SPACE ONLY 0.0 13 14 10 20 HA 1.8 GRAB-N-GO CASE COND. 1PcSPACE ONLY 0.0 15 16 1.8 SPACE ONLY 0.0 17 18 1.8 SPACE ONLY 0.0 19 20 10 20 HA 1.8 GRAB-N-GO CASE COND. 1PcSPACE ONLY 0.0 21 22 1.8 SPACE ONLY 0.0 23 24 1.8 SPACE ONLY 0.0 25 26 12 20 0.2 ROOF RECEPTACLE SPACE ONLY 0.0 27 28 0.0 SPACE ONLY SPACE ONLY 0.0 29 30 0.0 SPACE ONLY SPACE ONLY 0.0 31 32 0.0 SPACE ONLY SPACE ONLY 0.0 33 34 0.0 SPACE ONLY SPACE ONLY 0.0 35 36 0.0 SPACE ONLY SPACE ONLY 0.0 37 38 0.0 SPACE ONLY SPACE ONLY 0.0 39 40 0.0 SPACE ONLY SPACE ONLY 0.0 41 42 0.0 SPACE ONLY 16.2 45.0 PHASE A:5.2 KVA PHASE B:6.0 KVA 45.0 PHASE C:5.0 KVA J J 8 65 7 7 11Pc 1 3/4" C D EX. DRAIN RECRPTICAL EX.W SCALE:3/16" = 1'-0" TRAVEL CENTER FLOOR/ROOF PLAN - POWER1 PE1 DJTTRAVEL CENTER COLD CASE 1Pc ROLLOUTEQUIPMENT TAG - REFER TO ELECTRICAL EQUIPMENT SCHEDULE THIS SHEET FOR ALL ELECTRICAL EQUIPMENT REQUIREMENTS INCLUDING MOUNTING HEIGHT, NEMA PLUG CONFIGURATION AND BREAKER REQUIREMENTS - (TYPICAL FOR ALL EQUIPMENT WITH TAGS). SEE GENERAL ELECTRICAL NOTES #4 AND #5 ON THIS SHEET. X 1.FOR OUTLETS OR CONNECTIONS WITH EQUIPMENT TAGS, COORDINATE MOUNTING HEIGHTS AND LOCATIONS WITH INSTALLATION OF EQUIPMENT. 2.COORDINATE EXACT LOCATION(S) WITH ARCHITECTURAL ROOF PLANS AND DIVISION 15 CONTRACTOR PRIOR TO ANY ROUGH-IN - TYPICAL. 3.VERIFY EQUIPMENT CONNECTION REQUIREMENTS WITH DIVISION 15 CONTRACTOR PRIOR TO ANY ROUGH-IN. 4.ALL J-BOXES, AND OTHER ELECTRICAL DEVICES SHOWN SHALL BE RECESSED MOUNTED INTO A WALL, FLOOR OR CEILING UNLESS SPECIFICALLY NOTED OTHERWISE. 5.COORDINATE EXACT LOCATION AND CONNECTION WITH NAMEPLATE OF ALL OWNER SUPPLIED EQUIPMENT PRIOR TO ROUGH-IN. KEYED NOTES (ELECTRICAL) 1 PROVIDE JUNCTION BOX MOUNTED IN AN ACCESSIBLE LOCATION ABOVE THE LAY-IN CEILING. COORDINATE CONTINUATION OF CONDUCTORS DOWN THROUGH FACTORY PROVIDED CHASES TO COLD CASE. CONNECT TO REMOTE CONDENSING UNIT. CONNECT TO INDOOR COMPRESSOR UNIT PER MANUFACTURER'S INSTRUCTIONS. PROVIDE GFCI SERVICE RECEPTACLE WITH WEATHERPROOF WHILE-IN-USE COVER WITHIN 25' OF NEW MECHANICAL EQUIPMENT IF ONE IS NOT ALREADY PRESENT. PROVIDE UNI-STRUT TYPE MOUNTING. MAKE ALL ROOF PENETRATIONS WEATHERTIGHT. PROVIDE BELDEN 8761 CABLE IN 3/4" CONDUIT ROUTED TO ENERGY MANAGEMENT PANEL LOCATED IN THE CTS ROOM FOR RS485 BACNET CONNECTION. PROVIDE CAT5e CABLE IN 3/4" CONDUIT ROUTED TO ENERGY MANAGEMENT PANEL IN CTS ROOM FOR CONNECTION TO CONTROLLER . PROVIDE RJ45 CONNECTORS ON BOTH ENDS. PROVIDE JUNCTION BOX MOUNTED IN AN ACCESSIBLE LOCATION ABOVE THE LAY-IN CEILING. COORDINATE CONTINUATION OF CONDUCTORS DOWN THROUGH FACTORY PROVIDED CHASES TO COLD CASE. COORDINATE OVERHEAD ROUTING WITH EXISTING STRUCTURAL AND SYSTEM ELEMENTS. CONNECT BRANCH CIRCUITS TO EXISTING SPARE CIRCUIT BREAKERS (INCLUDING BREAKERS MADE SPARE BY DEMOLITION), OR PROVIDE AND CONNECT TO NEW CIRCUIT BREAKERS IN EXISTING SPACES. IF THERE ARE NOT ENOUGH EXISTING SPARE CIRCUIT BREAKERS AND/OR BREAKER SPACES, THEN PROVIDE NEW PANELBOARD(S) AND FEEDER(S). COORDINATE PANELBOARD LOCATION(S) WITH OWNER. VERIFY THAT PANELBOARDS, FEEDERS AND FEEDER BREAKERS ARE NOT OVER-LOADED BY CONNECTION OF NEW LOADS. ANY NEW PANELBOARDS OR CIRCUIT BREAKERS SHALL MATCH THE AIC RATINGS OF THE EXISTING ELECTRICAL DISTRIBUTION SYSTEM. EXISTING ELECTRICAL DISTRIBUTION SYSTEM TO REMAIN IN SERVICE. IF NEW PANELBOARD IS REQUIRED, PROVIDE NEW 225A, 3-POLE BREAKER TO FEED NEW PANELBOARD. ,)1(:3$1(/%2$5',65(48,5('3529,'(1(:<9‘$0/23$1(/ LABEL AS REQUIRED. CONDUCTOR SIZING BASED ON USE OF COPPER CONDUCTORS HAVING AN INSULATION 5$7,1*2)ƒ&DATE:INT.:DRAWN BY:PROJECT:COPYRIGHT, 2019 (UNPUBLISHED) PILOT FLYING J C DATE:REV:REVISION DESCRIPTION:DESIGN DEPARTMENT5508 LONAS ROADKNOXVILLE, TENNESSEE 37909(865) 588-7488PILOT FLYING JCONFIDENTIAL THIS DRAWING IS CONFIDENTIAL. NO USE OR DISCLOSURE OF THIS DRAWING IS PERMITTED, EXCEPT AS EXPRESSLY AUTHORIZED BY PILOT FLYING J SHEET:PILOT TRAVEL CENTERANYWHERE, USA08/23/19---XXX-XXX19384PAGE#DESIGN BY:8/23/19 FOR REFERENCE ONLY GENERAL ELECTRICAL NOTES EQUIP. TAG DESCRIPTION MOUNTING HEIGHT AND/OR SPECIAL INSTRUCTIONS VOLTAGE KVA/KW BREAKER SIZE/TYPE CONN. TYPE (NEMA CONFIG.)WIRE SCHEDULE NOTES TRAVEL CENTER ELECTRICAL EQUIPMENT CONNECTION SCHEDULE (SEE E5.3 FOR CONTINUATION) 1Pc -1Pc GRAB-N-GO CASE COORDINATE WITH CASEWORK COORDINATE IN FIELD - GRAB-N-GO CASE ROOF-TOP CONDENSER ROOF MOUNTED ‘5.4 20/3P HACR TYPE HARD WIRED 310 COORDINATE EXACT LOCATION WITH MECHANICAL CONTRACTOR.2 3 4 SCALE:N.T.S. EXAMPLE PANELBOARD SCHEDULE4 SCALE:3/16" = 1'-0" TRAVEL CENTER FLOOR PLAN - COMMUNICATIONS ROUGH-IN2 5 6 7 8 KEYED NOTES (PLUMBING) 1 SCALE:3/16" = 1'-0" EXAMPLE PLUMBING PLAN - CONDENSATE PIPING5 TRAVEL CENTER PLUMBING EQUIPMENT SCHEDULE MARK DESCRIPTION MANUFACTURER MODEL NUMBER CONNECTIONS REMARKSWVCWƒ+:ƒ+:FW-S FW-NS GAS 1Pc GRAB-N-GO CASE HUSSMANN IM-05-NR 3/4"-------ROUTE PUMPED CONDENSATE TO FLOOR SINK AS INDICATED ON WASTE PLAN. 1.DRAWINGS ARE DIAGRAMMATIC ONLY AND REPRESENT THE GENERAL SCOPE OF THE WORK. PRIOR TO SUBMITTING BID, VISIT THE JOB SITE TO OBSERVE THE EXISTING CONDITIONS OF THE PROJECT. REVIEW THE GENERAL NOTES, SPECIFICATIONS AND PLANS FOR ADDITIONAL REQUIREMENTS THAT MAY NOT BE SPECIFICALLY CALLED OUT IN THIS PORTION OF THE CONSTRUCTION DOCUMENTS. NOTIFY ARCHITECT OF ANY CONFLICTS OR DISCREPANCIES PRIOR TO SUBMISSION OF BID. 2.INSTALLATION SHALL COMPLY WITH LEGALLY CONSTITUTED CODES AND THE REQUIREMENTS OF AHJ AND ALSO MEET ALL REQUIREMENTS OF THE LANDLORD. OBTAIN A COPY OF THE LANDLORD'S REQUIREMENTS AND REVIEW PRIOR TO SUBMITTING BID. 3.3529,'($&216758&7,215(&25'6(72)³$6%8,/7´'2&80(176727+($5&+,7(&7 REFLECTING ANY VARIANCES OF INSTALLED PIPING LOCATIONS OR EQUIPMENT CONTRARY TO THE CONSTRUCTION DOCUMENTS. REFER TO SPECIFICATIONS. 4.PROVIDE TO THE ARCHITECT A COPY OF INSPECTION REPORTS AND APPROVAL CERTIFICATES FROM LOCAL AND STATE INSPECTIONS, REFER TO SPECIFICATIONS. 5.PLANS AND SPECIFICATIONS GOVERN WHERE THEY EXCEED CODE REQUIREMENTS. 6.COMPLY WITH HEALTH DEPARTMENT REGULATIONS. PROVIDE CLEARANCE FOR CLEANING BEHIND AND UNDER EXPOSED PIPING AS REQUIRED BY HEALTH DEPARTMENT. CONFORM TO HEALTH DEPARTMENT REQUIREMENTS FOR LOCATIONS OF FLOOR SINKS. 7.DO NOT SCALE FLOOR PLANS FOR EXACT HORIZONTAL LOCATION OF PIPE ROUTING. GENERIC LAYOUT INDICATED. 8.INSTALL ALL CONCEALED PIPING TIGHT TO THE STRUCTURE AND AS HIGH AS POSSIBLE. IN AREAS WITH AN OPEN CEILING, ONLY INSTALL PIPING SPECIFIC TO SERVING THAT AREA. ALL OTHER PIPING IS TO BE INSTALLED OUTSIDE THE OPEN CEILING AREA. INSTALL ALL EXPOSED PIPING TIGHT TO THE STRUCTURE AND AS HIGH AS POSSIBLE. NO PIPING IS TO BE INSTALLED BELOW THE BOTTOM OF THE JOISTS. PLACE ALL PIPING EVENLY SPACED AND PARALLEL OR PERPENDICULAR TO THE STRUCTURE FOR A UNIFORM INSTALLATION. COORDINATE EXACT PLACEMENT WITH OTHER TRADES TO AVOID CONFLICTS. GENERAL PLUMBING NOTES TRAVEL CENTER EQUIPMENT TAG - REFER TO PLUMBING EQUIPMENT SCHEDULE THIS SHEET FOR ALL PLUMBING REQUIREMENTS. X SCALE:N.T.S. SAMPLE RISER DIAGRAM3 225 A. M.L.O. 9‘ PANEL "AA" 42 SPACE EXISTING 208Y/120V. MAIN DISTRIBUTION PANEL 230.4 225A CONDUIT AND CONDUCTOR SCHEDULE FEEDER DESCRIPTION 230.4 (4)#4/0, (1)#4 G., IN 2-1/2" C. CONDUIT AND CONDUCTOR SCHEDULE NOTES: I - ISOLATED GROUND V - SIZED FOR VOLTAGE DROP S - SEPARATELY DERIVED SYSTEM U - UTILITY FEEDER 9 10 11 12 13 14 15 16 9 10 11 12 11 14 15 16 13 12 JUNCTION BOX. ELECTRICAL POWER SUPPLY EQUIPMENT CONNECTION - EQUIPMENT TAG OR DESCRIPTION INDICATED. COORDINATE LOCATION AND CONNECTION DETAILS WITH EQUIPMENT INSTALLER. NON-FUSIBLE DISCONNECT SWITCH, AMP RATING/POLES INDICATED. FOR OUTDOOR LOCATIONS, PROVIDE NEMA 3R ENCLOSURE. GROUND FAULT DUPLEX RECEPTACLE, NEMA 5-20. 30/3 NF 3R ELECTRICAL SYMBOL LEGEND ABBREVIATIONS WPG WEATHERPROOF WITH GROUND FAULT INTERRUPT-PROVIDE WITH IN-USE COVER PLUMBING SYMBOL LEGEND W - X SANITARY WASTE CONDENSATE ELBOW DOWN FLOOR DRAIN FLOOR SINK EQUIPMENT TAG (PILOT) KEYED NOTE- X CD MATERIAL SCHEDULE SYSTEM MATERIAL SANITARY WASTE & VENT (ABOVE GRADE)HUBLESS CAST IRON PIPE AND FITTINGS (PVC DWV AND FITTINGS ALLOWED IF AHJ PERMITS) TESTING PROCEDURES 1 TEST INSTALLED WASTE AND VENT PIPING FOR A PERIOD OF 24 HOURS. FILL THE SYSTEM WITH WATER TO A LEVEL OF 10'-0" ABOVE THE HIGHEST SANITARY FIXTURE AND OBSERVE FOR ANY LEAKS. ‘0.1 15/1P 212 ‘2.4 15/2P HACR TYPE 210 CONTRACTOR NOTE: CONTRACTOR TO ASSUME THAT ALL CIRCUITS SHOWN WILL HAVE AN APPROPRIATE LOCATION IN AN EXISTING ELECTRICAL DISTRIBUTION PANEL FOR PRICING PURPOSES. PROVIDE BID ALTERNATE FOR ADDITION OF NEW DISTRIBUTION PANELS. CODE WIRE AND CONDUIT 212 (2)#12, 1#12GND. 3/4"C. CONDUIT AND CONDUCTOR SCHEDULE 310 (3)#10, 1#10GND. 3/4"C. 210 (2)#10, 1#10GND. 3/4"C. CONTRACTOR NOTE: CONTRACTOR SHALL VERIFY ALL PANEL SCHEDULES ARE CORRECT, LEGIBLE AND COMPLETELY FILLED OUT. IF BREAKER LABELS ARE FOUND TO BE INCORRECT, MISSING OR ILLEGIBLE, CONTRACTOR SHALL RE-LABEL AS NECESSARY. ROUTE PUMPED CONDENSATE FROM DRINK CASE UP TO ABOVE CEILING OR HIGH IN STRUCTURE VIA CHASE, OVER AND THEN DOWN TO EXISTING FLOOR DRAIN, FLOOR SINK, OR MOP SINK. PROVIDE AIR GAP PER CODE.