HomeMy WebLinkAboutPTC HUSSMANN COLD CASE ROLLOUT - Electrical PlumbingAA-6
1Pc1
J
1Pc1Pc
1Pc
AA-2,4AA-10,12
AA-8
30/3
NF 3R 30/3
NF 3R
1Pc1PcAA-14,16,18 AA-20,22,24
2
3
2
3
LOCATED ON ROOF. COORDINATE
LOCATION WITH PROJECT MANAGER.
WPG
4
AA-26
KVA,AMPERES
CAB
AMPERESPANEL DE-RATING 80%
TOTAL CONN. LOAD
$$9:61$0/2UPSTREAM DEVICE - 225A
LOAD TYPE (LABEL)LOAD (KVA)CODEBREAKERWIRE SIZECIRCUITNUMBERCIRCUITNUMBERWIRE SIZEBREAKERCODELOAD (KVA)LOAD TYPE (LABEL)
A B C A B C
SPACE ONLY 0.0 1 2 10 15 HA
1.2
GRAB-N-GO CASE 1Pc
SPACE ONLY 0.0 3 4 1.2
SPACE ONLY 0.0 5 6 12 15 0.2 GRAB-N-GO CASE 1Pc
SPACE ONLY 0.0 7 8 12 15 0.2 GRAB-N-GO CASE 1Pc
SPACE ONLY 0.0 9 10 10 15 HA 1.2 GRAB-N-GO CASE 1PcSPACE ONLY 0.0 11 12 1.2
SPACE ONLY 0.0 13 14
10 20 HA
1.8
GRAB-N-GO CASE COND. 1PcSPACE ONLY 0.0 15 16 1.8
SPACE ONLY 0.0 17 18 1.8
SPACE ONLY 0.0 19 20
10 20 HA
1.8
GRAB-N-GO CASE COND. 1PcSPACE ONLY 0.0 21 22 1.8
SPACE ONLY 0.0 23 24 1.8
SPACE ONLY 0.0 25 26 12 20 0.2 ROOF RECEPTACLE
SPACE ONLY 0.0 27 28 0.0 SPACE ONLY
SPACE ONLY 0.0 29 30 0.0 SPACE ONLY
SPACE ONLY 0.0 31 32 0.0 SPACE ONLY
SPACE ONLY 0.0 33 34 0.0 SPACE ONLY
SPACE ONLY 0.0 35 36 0.0 SPACE ONLY
SPACE ONLY 0.0 37 38 0.0 SPACE ONLY
SPACE ONLY 0.0 39 40 0.0 SPACE ONLY
SPACE ONLY 0.0 41 42 0.0 SPACE ONLY
16.2 45.0 PHASE A:5.2 KVA
PHASE B:6.0 KVA
45.0 PHASE C:5.0 KVA
J J
8
65
7 7
11Pc
1
3/4"
C
D
EX. DRAIN
RECRPTICAL
EX.W
SCALE:3/16" = 1'-0"
TRAVEL CENTER FLOOR/ROOF PLAN - POWER1
PE1 DJTTRAVEL CENTER COLD CASE 1Pc ROLLOUTEQUIPMENT TAG - REFER TO ELECTRICAL
EQUIPMENT SCHEDULE THIS SHEET FOR ALL
ELECTRICAL EQUIPMENT REQUIREMENTS
INCLUDING MOUNTING HEIGHT, NEMA PLUG
CONFIGURATION AND BREAKER REQUIREMENTS -
(TYPICAL FOR ALL EQUIPMENT WITH TAGS). SEE
GENERAL ELECTRICAL NOTES #4 AND #5 ON THIS
SHEET.
X
1.FOR OUTLETS OR CONNECTIONS WITH EQUIPMENT TAGS, COORDINATE MOUNTING
HEIGHTS AND LOCATIONS WITH INSTALLATION OF EQUIPMENT.
2.COORDINATE EXACT LOCATION(S) WITH ARCHITECTURAL ROOF PLANS AND DIVISION
15 CONTRACTOR PRIOR TO ANY ROUGH-IN - TYPICAL.
3.VERIFY EQUIPMENT CONNECTION REQUIREMENTS WITH DIVISION 15 CONTRACTOR
PRIOR TO ANY ROUGH-IN.
4.ALL J-BOXES, AND OTHER ELECTRICAL DEVICES SHOWN SHALL BE RECESSED
MOUNTED INTO A WALL, FLOOR OR CEILING UNLESS SPECIFICALLY NOTED
OTHERWISE.
5.COORDINATE EXACT LOCATION AND CONNECTION WITH NAMEPLATE OF ALL OWNER
SUPPLIED EQUIPMENT PRIOR TO ROUGH-IN.
KEYED NOTES (ELECTRICAL)
1 PROVIDE JUNCTION BOX MOUNTED IN AN ACCESSIBLE LOCATION ABOVE THE LAY-IN
CEILING. COORDINATE CONTINUATION OF CONDUCTORS DOWN THROUGH FACTORY
PROVIDED CHASES TO COLD CASE.
CONNECT TO REMOTE CONDENSING UNIT.
CONNECT TO INDOOR COMPRESSOR UNIT PER MANUFACTURER'S INSTRUCTIONS.
PROVIDE GFCI SERVICE RECEPTACLE WITH WEATHERPROOF WHILE-IN-USE COVER
WITHIN 25' OF NEW MECHANICAL EQUIPMENT IF ONE IS NOT ALREADY PRESENT.
PROVIDE UNI-STRUT TYPE MOUNTING. MAKE ALL ROOF PENETRATIONS WEATHERTIGHT.
PROVIDE BELDEN 8761 CABLE IN 3/4" CONDUIT ROUTED TO ENERGY MANAGEMENT
PANEL LOCATED IN THE CTS ROOM FOR RS485 BACNET CONNECTION.
PROVIDE CAT5e CABLE IN 3/4" CONDUIT ROUTED TO ENERGY MANAGEMENT PANEL IN
CTS ROOM FOR CONNECTION TO CONTROLLER . PROVIDE RJ45 CONNECTORS ON BOTH
ENDS.
PROVIDE JUNCTION BOX MOUNTED IN AN ACCESSIBLE LOCATION ABOVE THE LAY-IN
CEILING. COORDINATE CONTINUATION OF CONDUCTORS DOWN THROUGH FACTORY
PROVIDED CHASES TO COLD CASE.
COORDINATE OVERHEAD ROUTING WITH EXISTING STRUCTURAL AND SYSTEM
ELEMENTS.
CONNECT BRANCH CIRCUITS TO EXISTING SPARE CIRCUIT BREAKERS (INCLUDING
BREAKERS MADE SPARE BY DEMOLITION), OR PROVIDE AND CONNECT TO NEW CIRCUIT
BREAKERS IN EXISTING SPACES.
IF THERE ARE NOT ENOUGH EXISTING SPARE CIRCUIT BREAKERS AND/OR BREAKER
SPACES, THEN PROVIDE NEW PANELBOARD(S) AND FEEDER(S). COORDINATE
PANELBOARD LOCATION(S) WITH OWNER.
VERIFY THAT PANELBOARDS, FEEDERS AND FEEDER BREAKERS ARE NOT OVER-LOADED
BY CONNECTION OF NEW LOADS.
ANY NEW PANELBOARDS OR CIRCUIT BREAKERS SHALL MATCH THE AIC RATINGS OF
THE EXISTING ELECTRICAL DISTRIBUTION SYSTEM.
EXISTING ELECTRICAL DISTRIBUTION SYSTEM TO REMAIN IN SERVICE.
IF NEW PANELBOARD IS REQUIRED, PROVIDE NEW 225A, 3-POLE BREAKER TO FEED NEW
PANELBOARD.
,)1(:3$1(/%2$5',65(48,5('3529,'(1(:<9$0/23$1(/
LABEL AS REQUIRED.
CONDUCTOR SIZING BASED ON USE OF COPPER CONDUCTORS HAVING AN INSULATION
5$7,1*2)&DATE:INT.:DRAWN BY:PROJECT:COPYRIGHT, 2019 (UNPUBLISHED)
PILOT FLYING J
C DATE:REV:REVISION DESCRIPTION:DESIGN DEPARTMENT5508 LONAS ROADKNOXVILLE, TENNESSEE 37909(865) 588-7488PILOT FLYING JCONFIDENTIAL
THIS DRAWING IS CONFIDENTIAL.
NO USE OR DISCLOSURE OF THIS DRAWING
IS PERMITTED, EXCEPT AS EXPRESSLY
AUTHORIZED BY PILOT FLYING J
SHEET:PILOT TRAVEL CENTERANYWHERE, USA08/23/19---XXX-XXX19384PAGE#DESIGN BY:8/23/19
FOR
REFERENCE
ONLY
GENERAL ELECTRICAL NOTES
EQUIP. TAG DESCRIPTION MOUNTING HEIGHT AND/OR SPECIAL INSTRUCTIONS VOLTAGE KVA/KW BREAKER SIZE/TYPE CONN. TYPE (NEMA CONFIG.)WIRE SCHEDULE NOTES
TRAVEL CENTER ELECTRICAL EQUIPMENT CONNECTION SCHEDULE (SEE E5.3 FOR CONTINUATION)
1Pc
-1Pc
GRAB-N-GO CASE COORDINATE WITH CASEWORK COORDINATE IN FIELD -
GRAB-N-GO CASE ROOF-TOP CONDENSER ROOF MOUNTED 5.4 20/3P HACR TYPE HARD WIRED 310 COORDINATE EXACT LOCATION WITH
MECHANICAL CONTRACTOR.2
3
4
SCALE:N.T.S.
EXAMPLE PANELBOARD SCHEDULE4
SCALE:3/16" = 1'-0"
TRAVEL CENTER FLOOR PLAN - COMMUNICATIONS ROUGH-IN2
5
6
7
8
KEYED NOTES (PLUMBING)
1
SCALE:3/16" = 1'-0"
EXAMPLE PLUMBING PLAN - CONDENSATE PIPING5
TRAVEL CENTER PLUMBING EQUIPMENT SCHEDULE
MARK DESCRIPTION MANUFACTURER MODEL NUMBER CONNECTIONS REMARKSWVCW+:+:FW-S FW-NS GAS
1Pc GRAB-N-GO CASE HUSSMANN IM-05-NR 3/4"-------ROUTE PUMPED CONDENSATE TO FLOOR SINK AS INDICATED ON WASTE PLAN.
1.DRAWINGS ARE DIAGRAMMATIC ONLY AND REPRESENT THE GENERAL SCOPE OF THE
WORK. PRIOR TO SUBMITTING BID, VISIT THE JOB SITE TO OBSERVE THE EXISTING
CONDITIONS OF THE PROJECT. REVIEW THE GENERAL NOTES, SPECIFICATIONS AND
PLANS FOR ADDITIONAL REQUIREMENTS THAT MAY NOT BE SPECIFICALLY CALLED OUT IN
THIS PORTION OF THE CONSTRUCTION DOCUMENTS. NOTIFY ARCHITECT OF ANY
CONFLICTS OR DISCREPANCIES PRIOR TO SUBMISSION OF BID.
2.INSTALLATION SHALL COMPLY WITH LEGALLY CONSTITUTED CODES AND THE
REQUIREMENTS OF AHJ AND ALSO MEET ALL REQUIREMENTS OF THE LANDLORD. OBTAIN
A COPY OF THE LANDLORD'S REQUIREMENTS AND REVIEW PRIOR TO SUBMITTING BID.
3.3529,'($&216758&7,215(&25'6(72)³$6%8,/7´'2&80(176727+($5&+,7(&7
REFLECTING ANY VARIANCES OF INSTALLED PIPING LOCATIONS OR EQUIPMENT
CONTRARY TO THE CONSTRUCTION DOCUMENTS. REFER TO SPECIFICATIONS.
4.PROVIDE TO THE ARCHITECT A COPY OF INSPECTION REPORTS AND APPROVAL
CERTIFICATES FROM LOCAL AND STATE INSPECTIONS, REFER TO SPECIFICATIONS.
5.PLANS AND SPECIFICATIONS GOVERN WHERE THEY EXCEED CODE REQUIREMENTS.
6.COMPLY WITH HEALTH DEPARTMENT REGULATIONS. PROVIDE CLEARANCE FOR CLEANING
BEHIND AND UNDER EXPOSED PIPING AS REQUIRED BY HEALTH DEPARTMENT. CONFORM
TO HEALTH DEPARTMENT REQUIREMENTS FOR LOCATIONS OF FLOOR SINKS.
7.DO NOT SCALE FLOOR PLANS FOR EXACT HORIZONTAL LOCATION OF PIPE ROUTING.
GENERIC LAYOUT INDICATED.
8.INSTALL ALL CONCEALED PIPING TIGHT TO THE STRUCTURE AND AS HIGH AS POSSIBLE. IN
AREAS WITH AN OPEN CEILING, ONLY INSTALL PIPING SPECIFIC TO SERVING THAT AREA.
ALL OTHER PIPING IS TO BE INSTALLED OUTSIDE THE OPEN CEILING AREA. INSTALL ALL
EXPOSED PIPING TIGHT TO THE STRUCTURE AND AS HIGH AS POSSIBLE. NO PIPING IS TO
BE INSTALLED BELOW THE BOTTOM OF THE JOISTS. PLACE ALL PIPING EVENLY SPACED
AND PARALLEL OR PERPENDICULAR TO THE STRUCTURE FOR A UNIFORM INSTALLATION.
COORDINATE EXACT PLACEMENT WITH OTHER TRADES TO AVOID CONFLICTS.
GENERAL PLUMBING NOTES
TRAVEL CENTER EQUIPMENT TAG - REFER
TO PLUMBING EQUIPMENT SCHEDULE THIS
SHEET FOR ALL PLUMBING
REQUIREMENTS.
X
SCALE:N.T.S.
SAMPLE RISER DIAGRAM3
225 A. M.L.O.
9
PANEL "AA"
42 SPACE
EXISTING 208Y/120V.
MAIN DISTRIBUTION
PANEL
230.4
225A
CONDUIT AND CONDUCTOR SCHEDULE
FEEDER DESCRIPTION
230.4 (4)#4/0, (1)#4 G., IN 2-1/2" C.
CONDUIT AND CONDUCTOR SCHEDULE NOTES:
I - ISOLATED GROUND
V - SIZED FOR VOLTAGE DROP
S - SEPARATELY DERIVED SYSTEM
U - UTILITY FEEDER
9
10
11
12
13
14
15
16
9 10 11 12
11
14
15
16
13
12
JUNCTION BOX.
ELECTRICAL POWER SUPPLY EQUIPMENT CONNECTION - EQUIPMENT TAG OR
DESCRIPTION INDICATED. COORDINATE LOCATION AND CONNECTION DETAILS WITH
EQUIPMENT INSTALLER.
NON-FUSIBLE DISCONNECT SWITCH, AMP RATING/POLES INDICATED. FOR OUTDOOR
LOCATIONS, PROVIDE NEMA 3R ENCLOSURE.
GROUND FAULT DUPLEX RECEPTACLE, NEMA 5-20.
30/3
NF 3R
ELECTRICAL SYMBOL LEGEND
ABBREVIATIONS
WPG WEATHERPROOF WITH GROUND FAULT INTERRUPT-PROVIDE WITH IN-USE COVER
PLUMBING SYMBOL LEGEND
W
-
X
SANITARY WASTE
CONDENSATE
ELBOW DOWN
FLOOR DRAIN
FLOOR SINK
EQUIPMENT TAG (PILOT)
KEYED NOTE-
X
CD
MATERIAL SCHEDULE
SYSTEM MATERIAL
SANITARY WASTE & VENT (ABOVE GRADE)HUBLESS CAST IRON PIPE AND FITTINGS
(PVC DWV AND FITTINGS ALLOWED IF AHJ PERMITS)
TESTING PROCEDURES
1
TEST INSTALLED WASTE AND VENT PIPING FOR A PERIOD OF 24 HOURS. FILL THE SYSTEM WITH
WATER TO A LEVEL OF 10'-0" ABOVE THE HIGHEST SANITARY FIXTURE AND OBSERVE FOR ANY
LEAKS.
0.1 15/1P 212
2.4 15/2P HACR TYPE 210
CONTRACTOR NOTE:
CONTRACTOR TO ASSUME THAT ALL
CIRCUITS SHOWN WILL HAVE AN
APPROPRIATE LOCATION IN AN EXISTING
ELECTRICAL DISTRIBUTION PANEL FOR
PRICING PURPOSES. PROVIDE BID
ALTERNATE FOR ADDITION OF NEW
DISTRIBUTION PANELS.
CODE WIRE AND CONDUIT
212 (2)#12, 1#12GND. 3/4"C.
CONDUIT AND CONDUCTOR SCHEDULE
310 (3)#10, 1#10GND. 3/4"C.
210 (2)#10, 1#10GND. 3/4"C.
CONTRACTOR NOTE:
CONTRACTOR SHALL VERIFY ALL PANEL
SCHEDULES ARE CORRECT, LEGIBLE
AND COMPLETELY FILLED OUT. IF
BREAKER LABELS ARE FOUND TO BE
INCORRECT, MISSING OR ILLEGIBLE,
CONTRACTOR SHALL RE-LABEL AS
NECESSARY.
ROUTE PUMPED CONDENSATE FROM DRINK CASE UP TO ABOVE CEILING OR HIGH IN
STRUCTURE VIA CHASE, OVER AND THEN DOWN TO EXISTING FLOOR DRAIN, FLOOR
SINK, OR MOP SINK. PROVIDE AIR GAP PER CODE.