STATEMENT OF SPECIAL INSPECTIONS SCHEDULE
The Barclay Beach Club Condominium Association, Inc.
2800 N. Highway AIA
Ft. Pierce, FL 34949
Balconies Concrete Restoration
(This schedule should match the Statement of Special Inspections)
Where an option between continuous and periodic inspection is possible, identify the option
required.
Steel Construction — Verification / Inspection
See Table 1705.2.2 — Required Verification and Inspection
Continuous
Periodic
of Steel
1. Material verification of cold -formed steel deck: N/A
a. For structural steel, identification markings to conform
---
---
to AISC N/A
b. For other steel, identification markings to conform to
ASTM standards specified in the approved
---
construction documents.
c. Manufacturer's certified test reports.
---
---
2. Inspection of welding:
a. Cold -formed steel deck:
1) Floor and roof deck welds. N/A
---
---
b. Reinforcing steel:
1) Verification of weldability of reinforcing steel other
than ASTM A 706.
---
---
2) Reinforcing steel resisting flexural and axial forces
in intermediate and special moment frames, and
---
boundary elements of special structural walls of
---
concrete and shear reinforcement. N/A
3) Shear reinforcement.
---
4) Other reinforcing steel -cleaning of corrosion scale
---
X
and supplement as needed
Concrete Construction — Verification / Inspection -
TContinuous
I
Existing Building Structure
Periodic
Page 1 of 4
Statement of Special Inspections Schedule
See Table 1705.3 — Required Verification and Inspection of
Concrete Construction
1. Inspection and marking of Concrete Spalling before
---
X
excavation commences
2. Inspection of Post Tension anchors at concrete spalling
for necessary temporary lock offs.
---
N/A
3. Inspection of Concrete after excavation to confirm
---
proper geometric configuration and the excavation is free
X
of bond inhibiting corrosion -Pre our
4. Verifying use of required design or bag mix.
---
X
5. At the time fresh concrete is sampled to fabricate
specimens for strength tests, perform slump and air
content tests, and determine the temperature of the
---
---
concrete.
6. Inspection of concrete after poured and finished
---
X
7. Inspection for maintenance of specified curing
temperature and techniques.
---
---
8. Inspection of prestressed concrete. N/A
a. Application of prestressing forces.
---
N/A
b. Grouting of bonded prestressing tendons in the
---
seismic-force-resisting system.
---
9. Erection of precast concrete members. --- ---
10. Verification of in -situ concrete strength, prior to stressing
of tendons in posttensioned concrete and prior to removal
of shores and forms from beams and structural slabs.
---
N/A
11. Inspect formwork for shape, location and dimensions of
the concrete member being formed.
---
X
Soils — Verification / Inspection
See Table 1705.6. NIA
Continuous
Periodic
1. Verify materials below shallow foundations are adequate
to achieve the design. bearing capacity. N/A
---
---
2. Verify excavations are extended to proper depth and have
reached proper material. N/A
---
---
3. Perform classification and testing of compacted fill
---
---
materials. N/A
4. Verify use of proper materials, densities and Iift
thicknesses during placement and compaction of
---
---
compacted fill. N/A
5. Prior to placement of compacted fill, observe subgrade
and verify that site has been prepared properly. N/A
---
---
Page 2 of 4
Statement of Special Inspections Schedule
Deep Driven Foundation Elements — Verification /
Inspection See Table 1705.7 N/A
Continuous
Periodic
1. Verify element materials, sizes and lengths comply with
the requirements. N/A
---
---
2. Determine capacities of test elements and conduct
additional load tests as required. N/A
---
---
3. Observe driving operations and maintain complete and
accurate records for each element. N/A
---
---
4. Verify placement locations and plumbness, confirm type
and size of hammer, record number of blows per foot of
penetration, determine required penetrations to achieve
---
---
design capacity, record tip and butt elevations and
document any damage to foundation element. N/A
5. For steel elements, perform additional inspections in
---
---
accordance with Section 1705.2. N/A.
6. For concrete elements and concrete -filled elements,
---
perform additional inspections in accordance with
Section 1705.3.
7. For specialty elements, perform additional inspections as
---
---
determined by the registered design professional in
responsible charge.
Cast -In -Place Deep Foundation Elements — Verification
/ Inspection See Table 1705.8 N/A
Continuous
Periodic
1. Observe drilling operations and maintain complete
and accurate records for each element.
---
--
2. Verify placement locations and plumbness, confirm
element diameters, bell diameters (if applicable),
lengths, embedment into bedrock (if applicable) and
---
adequate end -bearing strata capacity. Record concrete
or grout volumes.
3. For concrete elements, perform additional inspections
in accordance with Section 1705.3.
Other Work — Verification/Inspection
Other Work — Verification/Inspection
Page 3 of 4
d.) Check lumber and plywood for excessive deflection, splitting, splintering, crushing,
twisting or bowing..
e.) Check lumber and plywood for proper species, grade, agency certification, surfacing and
chemical treatment.
f.). Check installation of bridging and bracing.
7. MISCELLANEOUS.
a.) Check for local failures such as cracks, deflections or settlement.
b.) Check surface of structural concrete for rust spots and exposed reinforcing.
c.) Check for holes drilled, cut or chipped into walls, columns or slabs without prior
approval.
d.) Check job site for undermining of foundations or shores due to soil erosion.
Upon completion of the. project, and prior to the issuance of a Certificate of Occupancy, the Special
Inspector shall file a signed. and sealed statement essentially in the following form:
"To the best of my knowledge and belief, the above -described construction of all structural load -bearing
components complies with the permitted documents, submitted to the enforcement- agency."
Respectfully Submitted,
Page 4 of 4