Project No. 20-249A Report No. 2
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Bldg. Dept.
Mr. Robert Stark – Structure-Con
Mr. Khris McConnell – Structure Con
Page 1 of 2
THRESHOLD INSPECTION REPORT
OCEAN HARBOR NORTH CONDOMINIUMS – BLDG. A CONCRETE REPAIRS
5151 N. HWY. A1A, FT. PIERCE, FL 34949
SLC BUILDING PERMIT NUMBER: 2103-0590
PROJECT NAME: Ocean Harbor N. Condos – Bldg. A DATE: June 1, 2021
CLIENT: Elliott Merrill Community Management LOCATION: Ft. Pierce, FL
CONTRACTOR: Structure-Con PROJECT MGR: Mr. Khris McConnell
INSPECTED BY: Todd Rhoten WEATHER: Sunny
WORK INSPECTED: Units 215/315, 315/415, 415/515, 515/615 & 811
OBSERVATIONS:
Units 215/315, 315/415 & 415/515
• All repaired areas have been poured with the approved repair mortar.
• Preparation for new waterproofing at repaired areas has begun.
• Stucco at ceiling applied at all full depth repairs.
Unit 515/615
• Tile removed at the spalled area.
• Loose concrete has been chipped at the east facing sliding glass door.
• Corrosion in the reinforcing bars does not extend into the unit.
• Spalling area is partial depth and does not require full depth repair.
Unit 811
• Roof slab edge has been repaired in the 2-foot sections as recommended.
• The extent of corrosion was limited to the north facing edge only.
• Stucco has been replaced at the repaired areas.
RECOMMENDATIONS:
Unit 515/615
• All bars shall be power tool cleaned and painted with a corrosion inhibitor.
• Form and pour repair areas with a high strength repair mortar and provide proper clearance for all
reinforcing bars.
All work to date is in compliance with recommendations as indicated in the permitted documents.
______________________________ _________________________________
Michael Lue, P.E. Todd Rhoten, Inspector
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 20-249A Report No. 2
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Bldg. Dept.
Mr. Robert Stark – Structure-Con
Mr. Khris McConnell – Structure Con
Page 2 of 2
Pic 1
Unit 315
Stucco repair at ceiling of full depth repair.
Pic 2
Unit 415
Surface repair ground flush with surrounding areas and
is ready for new waterproofing.
Pic 3
Unit 811
Ceiling spall repairs in progress.