HomeMy WebLinkAbout7Notes: 1) Wall Rebar 5/8" "#5" 60 KSI unless specified 2) Concrete 4,000 PSI "pump mix" 3/4 Aggregate 3) i-x.xx} elevation below finished floor. doping :garage "loot AZ Garage / Lanai & Equipment pads 12" CMU 2 courses 2'-6" A I Lower level living 12" CMU bottom 8" CMU ledger top Pour CMU cells same time as slab 0.00'-} Garage ---------{-- _2&00" } 4'-6" A8 ]nerior Column Main Lower Floor 12" CMU (square) 5-45 Horizontal Footing Dowels - Lap splice to CMU Column Vert. rebars - See Foundation plan for footing sizes & reinforcing Garage Man Door & Equipment Pad Exterior Column & Lentel 545 Horizontal Footing Dowels - Lap splice to CMU Column Vert. regars - See Foundation Plan for footing sizes & reinforcing 3 Course 16" CMU (square) w/ Concrete Lintel on top 0 0 Inerior Column Main Lower Floor to Garage 12" CMU (square) 545 Horizontal Footing Dowels - Lap splice to CMU Column Vert. rebars - See Foundation plan for footing sizes & reinforcing -48.00" Lower level living South Wall 12" CMU 5 courses Pour cells to the top of the 5th course Coat back site with water proofing Back fill and compact. 8" CMU Ledger top course Pour cell same time as slab #5 Vert. rebar @ 24" O.C. in filled cells - 24" long dowels into footing & slab on grade Provide Temporary CMU Wall Bracing when Backfilling until Top Slab is poured 00 .■■ -4.00" I Lanai / Deck South Wall 8" CMU 4 courses #5 Vert Rebar @ 16" O.C. in filled cells - 24" dowels into footing & slab on grade Provide Temporary CMU Wall Bracing when Backfilling until Top Slab is poured 2- #5 Right-angle standard dowels - 24" X 24" extended into slab on grade and into CMU column -2-#5 Vert. Rebar in 16" CM U column dowel into footing 4'_6" Al0@ Exterior Column on Stem / Retaining Wall 16" CMU (square) 8 courses Pour cells to the top of the 8th course Coat back site with water proofing Back fill and compact. Provide Temporary CMU Wall Bracing when Backfilling until Top Slab is poured 2'-6" ]Ali o 8" CMU with #5 Vert. rebar @ 16" O.C. in filled cells - 24" dowels into slab on grade: 8" dowel into footing. Rebar connected to top concrete deck Coat back site with water proofing Back fill and compact. Provide Temporary CMU Wall Bracing when Backfilling until Top Slab is poured Sloping Garage Floor 6/ 12 A6 1 st floor to garage footer Garage South Wall 12" CMU 7 courses Pour cells to the top of the 4th course Coat back site with water proofing Back fill and compact. 8" CMU Square 8th course "garage slab rest" 12" CMU 9th top course Pour 8th & 9th same time as slab #5 Vert. rebar @ 24" O.C. in filled cells - 24" dowels into footing & slab on grade Provide Temporary CMU Wall Bracing when Backfilling until Top Slab is poured A15 o Lower level living l AC Pad South Wall 12" CMU 5 courses Pour cells to the top of the 5th course Coat back site with water proofing Back fill and compact. 8" CMU Ledger top course Pour cell same time as slab #5 Vert. rebar @ 24" O.C. in filled cells - 24" long dowels into footing & slab on grade Provide Temporary CMU Wall Bracing when Backfilling until Top Slab is poured N6" Thick with 45's at 12" O.C. A7 each way Elevator pit detail 8" CMU ledger top 8" CMU bottom Pour CMU cells same time as slab Footing 12" Wide X 10" Thick 4 sides 3- #5's Cont. ilt,� �'�,� This item has been electronically F.���� ••�" 000 s��� signed and sealed by Robert F. �"t•''r`,�+CF.N,+�,••, deck, Ph.D.,PE using a Digital Signature and date. Printed copies of this document are not considered signed and sealed • Ftl�� •,s"�: and the signature must be '•...,,.•.•' �+� verified on any electronic copies. 5'0NAL ��,�'►� Digitally signed by Robert F Oleck Date: 2021.05.21 1000 17:36 -041 001 aO•� e� Pl N O O O N N N C o W11111 r_ OQ Cl) M C� U 0 m U c a� �OC 0 M Page: 7 Scale: V 1 /2" { 1:24)