Loading...
HomeMy WebLinkAboutBlower Door Testt A Date: b �'T_' t Contractor: Job Address: S Construction: (\_4 New Construction — Complete ( ) Existing — After Addition Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 Phone:772-462-2165 Fax:772-462-6443 BLOWER DOOR TEST FORM House Infiltration Test Certification Prescriptive and Performance Method Permit #: 2 I I D House Infiltration Test Results SLC Climate Zone 2 �f k CFM (50) _ , ��' S 3 Test Date: � I r Volume = ACH (50) = CFM (50) x 60 / Volume = S 2 Mechanical Ventilation required less than 3 ACH Passing results must be & ACH (50) or less ( v0pass ( ) Fail FBC, Energy The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. FBC, Residential Where the air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florido Building Code, Energy Conservation the dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3_ Testing Company Pro -Duct SerVIC2S Company Name: Address: 1915 Rio Vista Drive, Ft. Pierce, FL. 34W I hereby certify that the above House Infiltration results demonstrate compliance with FBC Energy Conservation requirements in accordance with Section R402.4.1.2 Climate Zone 2. Signature: Printed Name: Martin Klein License/Certification #: 5061633 Planning & Developmoni Services Building & Code Regulation Division 2300 Vlrginin Ave, Rm 201 Fort Pierce, FL 34882 772A62-2165 Fox 772A82.6443 FBC ENERGY CONSERVATION CODE Duct Scaling Certification Prescriptive and Performance Method Date: — � 1 �1 Permit M 2 V 1 Lot MContractor: A74,^) 2^%l1 Address: Construction: XPost Construction Test 1 Rough -in Test Test Conditions: J Date: ` 1C1 1 ° ti Floor Area (112): Time: ; i K Primary Location of Supply Ductwork Indoor Temperature (F): —jg Primary Location of Return Ductwork Outdoor Temperature (F): Q -� Toth Leakage Test (Outside) Duct Leakage: ❑ Default ❑ Prop. Leak Free Test Pressure: 'L i (Pa) Baseline Duct Pressure (optional) 0.( (Pa) (Pa) Flow Ring I Fan Installed I (Pal Z Testing Company Company Name: Pro -Duct Services roposed On = 0 . J 1 (cfm) I Results:l�ass ❑ Fail Total Leakage (cfm):�_ Total Leakage per 100 sgft: CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sgft Address: f '' P,-.If, +< it f_-11* `( � I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 51" Edition FBC Energy Cortsery dw retkwmft In eo mirdam'a Section R403.2 2. Signature: j Printed Name: Martin Klein License/Certificate M 5061633