MODEL 1101"V" (STEPS 1-15)
LONGITUDINAL ONLY:FOLLOW STEPS 1-9
FOR ADDING LATERAL ARM:Follow Steps 10-15
FOR CONCRETE APPLICATIONS:Follow Steps 16-19
ENGINEERS STAMP
ENGINEERS STAMP
-1. SPECIAL CIRCUMSTANCES: If the following conditions occur- STOP! Contact Oliver Technologies at -800-284-7437
a) Pier height exceeds 48" b) Length of home exceeds 76'c) Roof eaves exceed 16" d) Sidewall he ht exceed 96"
e) Location is within 1500 feet of coast
INSTALLATION OF GROUND PAN
2. Remove weeds and debris in an approximate two foot square to expose firm soil for each ground pan
3. Place ground pan (C)directly below chassis I-beam . Press or drive pan firmly into soil until flush with or Delow soil.
SPECIAL NOTE: The longitudinal "W brace system serves as a pier under the home and should be loa ed as any
other pier. It is recommended that after leveling piers, and one-third inch (1/3") before home is lowered c mpletely on
to piers, complete steps 4 through 9 below then remove jacks.
INSTALLATION OF LONGITUDINAL "V" BRACE SYSTEM
NOTE: WHEN INSTALLING THE LONGITUDINAL SYSTEM ONLY, A MINIMUM OF 2 SYSTEMS PER FLOOR SECTIO IS REQUIRED. SOIL TEST
PROBE SHOULD BE USED TO DETERMINE CORRECT TYPE OF ANCHOR PER SOIL CLASSIFICATION. IF PROBE TE*READINGS ARE BETWEEN
175 8 275 A 5 FOOT ANCHOR MUST BE USED.IF PROBE TEST READINGS ARE BETWEEN 276& 350 A 4 FOOT ANICHOR MAY BE USED. USE
GROUND ANCHORS WITH DIAGONAL TIES AND STABILIZER PLATES EVERY 5'4" .VERTICAL TIES ARE ALSO REQ IRED ON HOMES SUPPLIED
WITH VERTICAL TIE CONNECTION POINTS(PER FLORIDA REG).
4. Select the correct square tube brace (E) length for set- up (pier) height at support location. (The 18" tub is always
used as the bottom part of the longitudinal arm). Note: Either tube can be used by itself, cut and drilled t length as long as a
40 to 45 degree angle is maintained.
PIER HEIGHT 1.25"ADJUSTABLE 1.50"ADJUSTABLE
(Approx. 45 degrees Max.) Tube Length Tube Length
7 3/4" to 25" 22" 18"
24 3/4" to 32 1/4" 32" 18"
33" to 41" 44" 18"
40" to 48" 54" 18"
5. Install (2) of the 1.50" square tubes (E 118" tube) )into the"U" bracket(J), insert carriage bolt and le4i a nut loose for final
adjustment.
6. Place I-beam connector (F) loosely on the bottom flange of the I-beam.
7. Slide the selected 1.25" tube (E) into a 1.50"tube (E) and attach to I-beam connectors (F)and fasten loosely with bolt and nut.
8. Repeat steps 6 through 7 to create the W" pattern of the square tubes loosely in place. The angle is nc t to exceed 45
degree and not below 40 degrees.
9.After all bolts are tightened, secure 1.25" and 1.50"tubes using four(4) 1/4"-14 x 3/4"self-tapping screws in pre-drilled holes.
INSTALLATION OF LATERAL TELESCOPING TRANSVERSE ARM SYSTEM
THE MODEL 1101 "V"(LONGITUDINAL&LATERAL PROTECTION)ELIMINATES THE NEED FOR MOST STABILIZE�t PLATES& FRAME TIES.
- NOTE:THE USE OF THIS SYSTEM REQUIRES VERTICAL TIES SPACED AT 5'4".
FOUR FOOT(4')GROUND ANCHOR MAY BE USED EXCEPT WHERE THE HOME MANUFACTURER SPEC FIES DIFFERENT.
10. Install remaining vertical tie-down straps and 4' ground anchors per home manufacturer's instructions. 0TE: Centerline
anchors to be sized according to soil torque condition. Any manufacturer's specifications for sidewall at chor loads in excess of
4.000 lbs. require a 5'anchor per Florida Code.
11. NOTE: Each system is required to have a frame tie and stabilizer attached at each lateral arm stabilizin location. This frame tie &
stabilizer plate needs to be located within 18" from of center ground pan.
12. Select the correct square tube brace (H) length for set-up lateral transverse at support location. The le gths come in either 60"
or 72" lengths. (With the 1.50"tube as the bottom tube, and the 1.25" tube as the inserted tube.)
13. Install the 1.50 transverse brace (H)to the ground pan connector (D)with bolt and nut.
14. Slide 1.25"transverse brace into the 1.50" brace and attach to adjacent I-beam connector( I )with hot and nut.
15. Secure 1.50" transverse arm to 1.25" transverse arm using four 4 1/4"- 14 x 3/4" self-tappina screws in re-drilled holes.
AL
OLIVER TECHNOLOGIES, INC. Telephone:931-796-4555
1-800-284-7437 Fax:931-796-8811
www.olivertechnologies.com
i
I
longitudinally or 18 inches transverse to allow proper distance between the concrete bolt and the edge of t concrete(see below).
c) Footers must have minimum surface ar 441 sq. in. (i.e. 21"square), and must be a mi4ateast
of 8"dee .
d) If a full slab is used, the depth must be minimum at system bracket location, all other stions must be per local jurisdiction.
Special inspection of the system bracket installation is not required.. Footers must allow for 4"from he concrete bolt to the edge
of the concrete.
NOTE: The bottom of all footings, pads, slabs and runners must be per local jurisdiction.
LONGITUDINAL: (Model 1101 LC "V")
17. When using Part# 1101-W-CPCA(wetset) simply install the bracket in runner/footer OR When installing in c iredconcrete use Part
101-D-CPCA(dryset). The 1101 (dryset)CA bracket is attached to the concrete using (2) 5/8"x3"concrete w dge bolts (Simpson part#
S162300H 5/8" X 3"or Powers equivalent). Place the CA bracket in desired location. Mark bolt hole locatior s, then using a 5/8"diameter
masonry bit,drill a hole to a minimum depth of 3". Make sure all dust and concrete is blown out of the holes Place wedge bolts into drilled
holes,then place 1101 (dry set)CA bracket onto wedge bolts and start wedge bolt nuts. Take a hammer ar J lightly drive the wedge bolts
down by hitting the nut(making sure not to hit the top of threads on bolt).The sleeve f concrete w It r eeds to be at Qr below the tQD
of concrete. Complete by tightening nuts.
LATERAL: (Model 1101 TC "V")
18. For wet set(part# 1101-W-TACA)installation simply install the anchor bolt into runner/footer. For dry set insl allation (part# 1101-D-TACA)
mark bolt hole locations, then using a 5/8"diam. masonry bit, drill a hole to a minimum depth of 3". Makes re all dust and concrete is
blown out of the hole. Place wedge bolts (Simpson part#S162300H 5/8"X 3"or Powers equivalent)into(D)toncrete dry transverse
connector and into drilled hole. If needed, take a hammer and lightly drive the wedge bolts down by hitting th nut(making sure not to hit
the top of threads on bolt), then remove the nut. The sleeve of concrete wedge bolt needs to be at orb e top of concrete.
19. When using part# 1101 CVW (wetset)or 1101 CVD (dryset), install per steps 17 & 18.
Notes:
1. LENGTH OF HOUSE IS THE ACTUAL BOX SIZE
2. • =STABILIZER PLATE AND FRAME 11E LOCATION (needs b
be bralied vAhn 18 nd-les c(center of g and pan or corxxute)
3. LOCATION OF LONGITUDINAL BRACING ONLY
4. TRANSVERSE&LONGITUDINAL LOCATIONS
REQUIRED NUMBER AND LOCATION OF MODEL 1101 "V" OR 11 1 Q "V"
BRACES FOR UP TO 4/12 ROOF PITCH
ALL WIDTHS; AND LENGTHS UP TO 52'
• • • • • •
ALL WIDTHS; AND LENGTHS OVER 52' TO 80'
• • • • • j •
i
HOMES WITH 5/12 ROOF PITCH REQUIRE: PER FLORIDA REGULATIONS
6 systems for home lengths up to 52' and 8 systems for homes over 52' and up, 0'. One stabilizer
plate and frame tie required at each lateral bracing system.
1
l
I
I
t
PAN appw0d 4'gouW ....... page 3
endlors may to used in all revision 6107
1,F 99 s except whas --
home menuladlrers specs
Nawne for dbwaN strepe
OR In 990M of 4,000 ft, I- Transverse arm I-beam
These kwatione require a 5' connector - -
andar.Per Flaride Code. H- Transverse arm
Top(1.25") j
bottom(1.5'> C-GROUND PAN
D=GROUND PAN CONNECTOR
D-Ground F_:-V-b, I-beam
U BRACKETS - SVERSE
Pan connectors E=TELESCOPING BRACE
transverse , �Y/ TUBE ASSEMB W/ 1.5 BOT-
connectors J-ground Pan TOM TUBE AND 1.25 TUBE
V Bracket INSERT
F="V" BRACE I-BE kM CONNEC-
TORS ASSEMB
E-'1r Breve Tu H =TELESCOPING RANSVERSE
Top(1.25') ARM ASSEMBL
Bottom (1.5')
I =TRANSVERSE AlM I-BEAM
Ground Pan CONNECTOR
J=V PAN BRACKET
Model # 1101 "V"
i-bearn amp
Longitude dry Ne�owee Hole
eaar i Flange (1)Per Assembly
concrete bracket
part# 1101 D-CPCA
' r Grade 5-12'x 1'
Carnage Bolt&Nut 1,
Wet bracket part#
1101 W-CPCA not Grades 12'x 21rr Model 1101 CVD
shown Carriage Boll&Nut
I-BEAM CONNECTOR BRACKET Model 11Ir
CVW
not show
'Florida approved 4'ground --- C=CONCRETE FTER/RUNNER
:anchors may be used in all D=CONCRETE UCKET TRANSVERSE
:locations except where home
:manufacturers specifications CONNECTOR nects with grade 5-1/2"x 2
;for sidewall straps are in 4 1/2""carriage &nUt
:excess of 4.000 lbs.These I- Transverse arm I-beam (F r I r l r r r f_' )
Hocations require a 5'anchor. connector - - E=TELESCOPIN V BRACE
:Per Florida Code. <H'Transverse arm TUBE ASSEM Y W/1.5 BOT-
Top(1.25-) TOM TUBE AN 1.25 TUBE
bottom(1.5.)
INSERT
F="V" BRACE I CONNECTOR ASSEMBLY
D Concrete F_:-V-p,a0e i yam„ , (connects with rade 5-1/2"x 4"carriage bolt
U bracket connectors &nut)
transverse H=TELE$COPINC TRANSVERSE ARM
connectors
J-Concrete ASSEMBLY
v Bracket I=TRANSVERSE) RM I-BEAM CONNECTOR
(connects with gr,de 5-1/2"x 2 1/2"'carriage bolt
&nut)
E-'V'Brace J=CONCRETE"V" BRACKET(connects with
T arn(op )1)5-) grade 5- 1/2"x "carriage bolt&nut)
-Concrete
Footer/Runner
Model # 1101 C "V" i
I
OLIVER TECHNOLOGIES, INC. Telephone:931-796-4555
1-800-284-7437 Fax:931-796-8811