Loading...
HomeMy WebLinkAboutPower Release 06-09-'21 12:11 FROM- 7728787656 T-152 P0002/0009 F-794 ='Rm� Pla:nni rg 8'<Developmfell�f Services = � Building & Code Regulation Division 2300 Virginia Ave 8 Fort fierce, VL 34982 772-462-Z1,65 Fax 772-462-6443 Request for 30-Day"l emisorary Power Release Project Address:: THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY(30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN PREPARATION FOR A:FINAL INSPECTION, IN CONSIDERATION OF APPROVAL OF THE REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS: 1. ?his temporary power release is requested for the above stated purpose only,and dwe wffJ be no occupancy of any type,other than that permitted by construction during this time period. 2. As wry by our signatures,we hereby agree to abide by all terms and conditions of this agreement, including Building Division Policy,which is incorporated herein by reference. 3. All conditions and requirements listed.in the attached document entitled"Requirements for 30 Day Power for Testing"have beenfulfilled and the premise is ready for compliance inspection. 4. All requests for an extension beyond 30 days must be.made in writing to the Building Official stating the reason for the request. Power may be removed from the site.and/or a Stop Work Order issued if the Final Inspection has not been approved within 30 days. A fee of$IOg.00 will be required to lift the Stop Work Order. WE HERESY RELEASE AND AGREE TO HOLD HARMLESS,ST, LUCIE COUNTY,AND THEIR EMPLOYEES FROM ALL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT OF THIS TRANSACTION,INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE DISMNNEC3T,ON OF ELECTRICAL POWER IN THE EVENT OF VIC A71ON OF THIS AGREEMENT, OWNER SIGNATURE DATE GFN C fdTI2a4C70R DAIS ELECTRICAL CONTRACTOR SIGNATURE DA"fE