HomeMy WebLinkAboutReport on the Construction of Antenna Foundation Concrete PadsUnited Teleports 19000 NE 5th Ave North Miami Beach, FL 33179 Tel. +1 (305) 671-3333 Report on the Construction of Antenna Foundation Concrete Pads at 10161 Range Line Road — Port Saint Lucie, 34987 — Florida In the period from July 2016 to November 2018, our company, UNITED TELEPORTS INC. , a lessee at the address above, has constructed 10 ( ten ) concrete foundation pads for different sizes of satellite telecommunications, transmit and receive antennas required for our company operations in the distribution/broadcasting of TV channels for Cable Operators and other platforms in the USA and abroad . All the antennas are in operations, transmitting a large number of TV channels to Cable Operators and Direct to Home services in the US. The list and sizes of antennas is presented in the table below. Antenna Construction & Installation at LINiTED TELEPORTS Facilites in Port Saint Lucie - Florida Antenna Pad Location Antenna Model and Size Period Antenna Pad Size (ft ) 1 A Enclosed Court Yard Andrew ASC 6.5 m C Band Jul - Aug 2016 15.5 x 15.5 x 2 2 B Enclosed Court Yard Andrew ASC 7.3 m C Band Jul - Aug 2016 17.5 x 17.5 x 2 3 D Enclosed Court Yard Prodelin 3.8 m C Band Jul - Aug 2016 8 x 8 x 2 4 D Enclosed Court Yard Prodelin 3.8 m C Band Jul - Aug 2016 8 x 8 x 2 5 D Enclosed Court Yard Prodelin 3.8 m C Band Jul - Aug 2016 8 x 8 x 2 6 G Front Yard - East Scientific Atlanta 7m Ku Band July Aug 2017 22 x 22 x 2 7 F Front Yard - North Prodelin 3.8 m C Band Dec-17 8 x 8 x2 8 H Front Yard Andrew ASC 7.3 m C Band Aug - Nov 2018 20 x 20 x 2 9 1 Front Yard Andrew ASC 7.3 m C Band Aug - Nov 2018 20 x 20 x 2 10 J Front Yard Andrew ASC 7.3 m C Band Aug - Nov 2018 20 x 20 x 2 Notes Antenna Foundation Pads labelled as per Engineering Drawings by Jason Hanchuck PE Besides the 10 larger transmit and receive satellite telecom antennas referred to above, UNITED TELEPORTS also installed 10 (ten) smaller, reception only antennas ( 3.7 m diameter ) at the back yard of the site, by means of in -ground , pipe type foundation. 19000 NE 5th Ave North Miami Beach, FL 33179 Tel. +1 (305) 671-3333 In order to meet the wind load requirements for the region of Port Saint Lucie West, for regulatory compliance as well as preservation of the investment in the highly priced satellite dishes, the antenna foundation pads were implemented with dimensions, rebars and anchor bolts exceeding the original specifications / recommendations of the antenna manufacturers, as illustrated in the table below. Summary of Antenna Foundation Pads Built at United Teleports in Port Saint Lucie 2016 to 2018 Rebar Rebar Pad Size - Pad Size Count by Vendor Concrete Pad Antenna Manufacturer Implemented ( Factory Length Rebar Ordered Rebar Vendor Specs ( ft) (ft) L+1)*4 Specs Andrew 6.5m in 15.5 x 15.5 x # 7 Grade 60 Rebars : Lot A : A the court yard 15.5 x 15.5 x 2 2 64 # 7 17.00 L-17ft Qty-60 CMT Titan Andrew 7.3m in 15.5 x 15.5 x 17.5 x 17.5 x # 7 Grade 60 Rebars : Lot B B the court yard 2.5 2 74 # 7 19.00 :L-19 ft Qty - 68 CMT Titan Prodelin 3.8 m in Rebar # 7 Grade D the court yard ( 3 8 x 8 x 2.5 8 x 8 x 2.5 36 # 6 7.00 60 84 CMT Titan antennas) pieces of 7 ft each Scientific Atlanta - 72 ( seventy two ) U-Bars with G Viasat 7 m in front 22 x 22 x 2 22 x 22 x 2 92 #7 21.00 rebar #7 Dimensions : 1' x 21' CMT Titan yard x V 4.6mKUBand 11.5x11.5x 60 (sixty) U-Bar 1'x11'xV C inside the 12 x 12 x 2 52 #5 11.00 CMT Titan 15 Rebar # 5 courtyard F 3.8 m antenna 8 x 8 x 2.5 8 x 8 x 2.5 36 #6 11.00 44 pieces Rebar # 5 lift CMT Titan Front Yard each / 28 pcs #6 each 7ft H,I,J 3 x 7.3 m Front 15.5 x 15.5 x 20 x 20 x 2 84 #6 21.00 Rebar # 6 240 pieces of 21 CMT Titan Yard 2.5 feet each 75 CWT Rebars were laid out in 2 top layers crossed and 2 bottom layers crossed, spaced 1 ft, and with 1 ft bend at each end ( U rebar 1ft+ L+ 1ft ) Titan Florida LLC 445 Fairway Dr Deerfield Beach, FL 33441 wfgtarmac@titanamerica.com CMT - Construction Materials Inc. Phone 334 272 8200 772-461-1243 MMAIER@constmat.com The whole process of construction of the antenna foundation pads, from concrete forming, rebars assembly, anchor bolts assembly and concrete pouring was directly supervised by COMLINK Inc., a company with over 30 years, worldwide experience in the overall installation and construction of large satellite antenna: led by Mr. Lloyd Brownhill. Besides supervision of the construction of the concrete pads, COMLINK was it charge of the installation of the antenna anchor bolts in accordance to the lay-( -` required as well as of the whole build-up of the antennas. kUnited Teleports 19000 NE 5rh Ave North Miami Beach, FL 33179 Tel. +1 (305) 671-3333 This report was prepared to support the application 'for an "after -the -fact" permit for the antenna foundations pads referred herein and contains the following supporting documentation: 1) Report by COMLINK Inc. confirming that the company supervised. the construction of the concrete pads including procedures and materials used, as equal or exceeding the antenna manufacturers' specifications; 2) Specifications of original manufacturers of the antennas for the foundation pads and anchors; 3) Quotes, Invoices and delivery slips for the steel rebar utilized in the foundation pads, as evidence of types and quantities of rebar ordered for the different pads; 4) Quotes, Invoices and delivery slips for the 3000 psi concrete utilized in the foundation pads, as evidence of types (3000 psi) and quantities of concrete ordered for the different pads; 5) Quotes, Invoices and delivery slips for the threaded rods, nuts and washers utilized in the anchor bolt kits for the different antenna pads; 6) Quotes, Invoices and delivery slips for the steel tubes ordered for the in - ground foundation of smaller, reception only antennas; 7) Pictures of the construction of the antenna pad foundations at different stages of construction: mold framing, rebars, anchor bolt assembly and concrete pouring, showing that materials and processes used in the construction of the antenna foundations were consistent to the antenna foundation plans and other documentation (invoices). To the best of our knowledge and in accordance to the invoices and receipts included in this report , the antenna foundation pads listed herein, were built with dimensions and materials ( rebars ) equal or exceeding the requirements and recommendations of the original antenna manufacturers . If any clarification or further i 514 0001, or bye ' rgdd z:. Renato G. Dias C.O.O. — UNITED TELEPORTS available at +1 305 CD u L 660.36' S 890 58' 08" E EXIST. ROOF EXIST. ROOF EXIST. ROOF EXIST. ROOF Fz] • C" - A„U EXIST. CONCRETE PAVEMENT 0 OPEN TO BELOW „B" EXIST. ROOF EXIST. ROOF 660.03' N 890 58' 51" W OVERALL PLAN & SCOPE OF WORK - SCALE: 1:600 025' 50' 75' 100' M JASON HANCHUK, P.E. DRAWN: JCH JASON HANCHUK, P.E. 1 10161 RANGE LINE RD., PORT ST. LUCIE, FL 34987 APR. 7, 2020 1770 PIERSIDE CIR. FLORIDA P.E. NO.: 56787 SATELLITE DISH FOUNDATIONS JOB #: 20-169 REV. #: DATE: BY: WELLINGTON, FL 33414 DESIGN: JCH DATE: CONSTRUCTION DRAWINGS SHEET 1 OF 4 BASEPIAIB& AN -BBCl50Y MANLIFACll1RFA REBAR®13' 011. FF r... . 1" 9 "X" - SEE TABLE FOR DIMENSION (TYP. of "Y") y U< r TYPICAL FOUNDATION SECTION 1" 0 x 24" A-325 THREADED ROD W/3"x3"x3" WASHER AND NUT (TYP. OF 8) 1" 0 x 24" A-325 THREADED ROD W/ 3 Bx3"xl f WASHER AND NUT (TYP. OF 18) 1 _ 15'-6" ANCHOR BOLT PLAN: "A" 6.5 m Andrew ASC 8'-9" 0'- "TYP. a ai A-325THREADED ROD W/ 3"x3"x3" WASHER AND NUT (TYP. OF 4 BOLTS, TYP. OF 3 PLATES) 4'-1y2" TYP. � F MARK # FOOTING SQUARE DIMENSION - "X" FOOTING DEPTH DIMENSION - "Y" FOOTING REINFORCING "A" 15'-6" 24" #7 "B" 17'-6" 24" #7 "C" 12'-0" 24' #7 "D" 8'-0" 24" #7 "E" 12'-0" 24" #7 "F" T-0" 24" #7 "G" 22'-0" 24" 1 #7 "H" 20'-0" 24" #7 "I" 20'-0" 24" #7 T. 20'-0" 24" #7 ANCHOR BOLT PLAN "B", "H", "I", & "J" - 7.3 In Andrew ASC 6'-0" V2" 0'-gy1 1. v o o O � tV 0 7/8" 0 x 17" A-193 B7 THREADED ROD W/ FLAT WASHER (TYP. OF 8) 12'-0" ANCHOR BOLT PLAN "C" 4.6 m Andrew ASC JASON HANCHUK, P.E. DRAWN: JCH JASON HANCHUK, P.E. 10161 RANGE LINE RD., PORT ST. LUCIE, FL 34987 APR. 7, 2020 1770 PIERSIDE CIR. DESIGN: JCH FLORIDA P.E. NO.: 56787 SATELLITE DISH FOUNDATIONS JOB #: 20-169 REV. #: DATE: BY: WELLINGTON, FL 33414 SCALE: 1/4"=1'-0" DATE: CONSTRUCTION DRAWINGS SHEET 2 OF 4 1"0x30" A-325 J-BOLT (TYP. OF 8) 2 V � 8'4' ANCHOR BOLT PLAN "D" & "F" 3.8 m Prodelin o o b 0 0 0 0 1-1/8" 0 x 7" A-325 J-BOLT (TYP. OF 8) ° O I^ 12'-0" M ANCHOR BOLT PLAN: "E" 5.0 m Comtech T-11" 6'-I 3�4" 3'- 1y2" 3'-11y2" '-1" o, o o o o 0 o 0 0 ° N N Zz O 0 0 ° O 1-1/8" 0 x 23" A-193-B7 4 THREADED ROD W/ 3"x3"x3" WASHER AND NUT (TYP. OF 21) 2' ANCHOR BOLT PLAN: "G" 7.0 m Scientific Atlanta JASON HANCHUK, P.E. DRAWN: JCH I JASON HANCHUK, P.E. 1 10161 RANGE LINE RD., PORT ST. LUCIE, FL 34987 APR. 7, 2020 1770 PIERSIDE CIR. DESIGN: JCH I FLORIDA P.E. NO.: 56787 SATELLITE DISH FOUNDATIONS JOB #: 20-169 REV. #: DATE: BY: WELLINGTON, FL 33414 SCALE: 1/4"=1'-0" 1 DATE: I CONSTRUCTION DRAWINGS SHEET 3 OF 4 MARK # LOCATION ANTENNA MODEL SATELLITE FOOTING SQUARE DIMENSION - "X" FOOTING DEPTH DIMENSION - "Y" APPROXIMATE DISH DIAMETER COMMENTS "A" Court Yard 6.5 at Andrew ASC E113 W 19-6" 24" 22'-6" Court Yard 7.3 rn Andrew ASC G19 I7-6" 24" 24'-0" Court Yard 4.6 m Andrew ASC E117 IT-0" 24" 14'-7" "D" Court Yard 3.8 rn Prodelin Several 8'-0" 24" 14'-0" West Yard 5.0 m Comtech None 12'-0" 24" 16'-8" "F" North Yard 3.8 m Prodelin SES-15 8'-0" 24" 14'-0" "G" Front Yard/East 7.0 m Scientific Atlanta Antra ID 2T-0" 24" 23'-0" "H" Front Yard / East 7.3 an Andrew ASC IS34 20'-0" 24" 24W' "r' Front Yard/East 7.3 an Andrew ASC Isll 20'-0" 24" 24W' "3" Front Yard / East 7.3 to Andrew ASC G23 20'1" 24" 24'-0" 1. All design and construction in accordance with the 6th Edition (2017) Florida Building Code. 2.ASCE 7-10, Risk Category III, Ultimate Design Wind Speed: 165 mph (3 second gust), Exposure C. 3. Contractor shall verify all the location of all the underground utilities prior to starting construction. Contractor shall call 811 Sunshine for locates. 4. Contractor shall remove all vegetation, unsatisfactory soils and other deleterious material underneath the proposed foundation. 5. Contractor shall compact the existing subgrade to 98% ASTM D 1557 Modified Proctor Maximum Density. 6. Concrete shall have a minimum 28 day compressive strength of 3,000 psi, and water/cement ratio shall not exceed 0.50. 7. Minimum concrete cover shall be: Slab: 3/4", Beams and columns: 1-1/2", Tie columns:'/4", Exposed unprotected concrete: 1-1/2", Formed concrete below grade: 2", Unformed concrete below grade: 3". 8. Concrete work, including form work and testing shall be in accordance with ACI Standards, latest edition. 9.Reinforcing bars shall be placed in accordance with CRSI Manual of Standard Practice, latest edition. 10. Reinforcing bars shall be ASTM A615 Steel and shall be free of rust and other debris. 11. Dowels shall be "L" hooked at bottom and shall be lapped 48 bar diameters with the wall or column reinforcing above. 12. Contractor shall verify all dimensions prior to construction. Contractor shall report all irregularities or discrepancies to the Engineer prior to proceeding with the work. 13. Foundations are designed for a minimum sail bearing value of 2,000 psf. JASON HANCHUK, P.E. DRAWN: JCH JASON HANCHUK, P.E. 1 10161 RANGE LINE RD., PORT ST. LUCIE, FL 34987 APR. 7, 2020 1770 PIERSIDE CIR. FLORIDA P.E. NO.: 56787 SATELLITE DISH FOUNDATIONS JOB #: 20-169 REV. #: DATE: BY: WELLINGTON, FL 33414 DESIGN: JCH DATE: CONSTRUCTION DRAWINGS SHEET 4 OF 4