HomeMy WebLinkAboutCreekside Lot 75-Window & Door Bucks.pdf®UNIVERSAL,
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date:
Project: 33 (o O, % V A a a le 7 , c\ n () O
Address: 33 t'7 _rf` I nt t+'N► C,r I,tst '1S
Check one:
la-"'kegular Inspection:
Permit No. AD t � — O 1 GM '�L
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
I
Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type: LJ;" ck0 W * i)aor QuC XC--
Arealnspected/Code:
Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
Ei D15 Disapproved ❑ Not Ready
Conditions/Comments: NO-r t'2r dfQvV (D"1 , q
1.
2.
3.
4.
5.
6.
7. in
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com