Loading...
HomeMy WebLinkAboutAPPROVED 159 pepper lane st lucie worksST. LUCIE WORKS Section D (Steep Slope Roof System) Roof System Manufacturer: OL"frL Notice of Acceptance Number: fl— Tas5 1-0 �Laa5-q- V3( Minimum Design Wind Pressuurrres, If Applica le (From RAS�al 127 or Calcullations): , .Zone 1:�Zone 2e: 5� Zone 2n Zone 2r: Zone 3A Zone 3r: 'qC/, Roo lope: 12 Ridge VeT tion? Mean Roof Height: Deck Type: CA Type Underlayment Insulation: Fire Barrier: Fastener Type & Spacing: Adhesive Type: Type Cap Sheet: 0 �l3 I Q x Roof Covering: Type & Size Drip 3�J Edge: ST. LUCIE WORKS Section A (General Information) Master Permit No. Process No. Contractors NameZS��W(�A f)c�fD'c�i License #�- Job Address ROOF CATEGORY ❑ Low Slope ❑ Mechanically Fastened Tile M-M�ortar/Adhesive Set Tiles ❑ Asphaltic Shingles ❑ Metal Panel/Shingles ❑Wood Shingles/Shakes ❑ Prescriptive BUR-RAS 150 ROOF ROOF TYPE. ❑ New roof ❑ Repair ❑ Maintenance 11/6roofing ❑ Recovering .ROOF SYSTEM INFORMATION?q�- `� Low Slope Roof Area (SF) Steep Sloped Roof Area (SF) h i� Total (SF) [� Section B (Roof Plan) Sketch Roof Plan: Illustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains. Include dimensions of sections and levels, clearly identify dimensions of elevated pressure zones and location of parapets. 26 39 s f 9 .... �lI ..... � 2Q . ND _.....: 26 co V N CU "".�"� 31 39 ST. LUCI E WORKS Section E (Tile Calculations) For Moment based tile systems, choose either Method 1 or 2. Compare the values for Mr with the values from Mr. If the Mf values are greater than or equal to the Mrvalues, for each area of the roof, then the the attachment method is acceptable. Method 1'Moment Based Tile Calculations Per RAS 12T (Zone 1: `��r, x )L Mg = MID Product Approval M of (Zone 2e: 5: x .�j 1 - Mg A = Mj' Product Approval Mf (Zone 2n: 'a 8 x Xg� �- Mg:`�+ Mom, *W Product Approval Mf (Zone 2r: x ?® 0t2�� - Mg: �= M,& 2�J� Product Approval Mf ``GG (Zone 3e: ��(' x �`S= -- Mg:= Mr�2 product Approval Mr - (Zone 3r: I x ��'/_ � - Mg, Mr27 Product Approval Mf Method 2 "Simplified Tile Calculations Per Table Below" Required Moment of Resistance (Mr) From Table Below Product Approval Mf Mr required Moment Resistance* Mean Roof Height Roof Slope 15, 20' 25' 30' 40' 2:12 34.4 36.5 38.2 39.7 42.2 3:12 32.2 34.4 36.0 37.4 39.8 4:12 30.4 32.2 33.8 35.1 37.3 5:12 28.4 30.1 31.6 32.8 34.9 6:12 26.4 28.0 29.4 30.5 32.4 7:12 24.4 25.9 27.1 28.2 30.0 *Must be used in conjunction with a list of moment based tile systems • For Uplift based tile systems use Method 3. Compare the values for F' with the values for Fr If the F' values are greater than or equal to the Fr values, for each area of the roof, then the tile attachment method is acceptable. Method 3 "Uplift Based Tile Calculations Per RAS 12T (Zone 1: x L =x W:= ) -W: cos r_ (Zone 2e: x L =x W:= ) -W: cos r. (Zone 2n: x L =x W:= ) -W: cos r, (Zone 2r: x L =x W:= ) -W: cos r. (Zone 3e: x L =x W:= ) -W: cos r, (Zone 3r: x L =x W:= ) -W: cos r, =Fri Product Approval F' Fr2e Product Approval F' Fr2n Product Approval F' Fr2r Product Approval F' =Fr3e Product Approval F' =Fr3r Product Approval F' Where to Obtain Information Description Symbol Where to find Design Pressure Zones 1, 2e, 2n, 2r, 3e, 3r From applicable table in RAS 127 or by an engineering analysis prepared by PE based on ASCE 7 Mean Roof Height H Job Site Roof Slope 6 Job Site Aerodynamic Multiplier a Product Approval Restoring Moment due to Gravity Mg Product Approval Attachment Resistance Mf Product Approval Required Moment Resistance Mg Calculated Minimum Attachment Resistance F' Product Approval Required Uplift Resistance Fr Calculated Average Tile Weight W Product Approval Tile Dimensions L = length W = width Product Approval All calculations must be submitted to the building official at the time of permit application.