Loading...
HomeMy WebLinkAboutCreekside Lot 77-Wire Lath.pdf®UNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: 7-1 Permit No. Project: Q /Z� ,CAS/d�z Address: 3 3 Z 5 ,77 Check one: 2( Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): Zvi/ - n/7z BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: (K2 i-t T�, Inspection Results: OAP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments 1. 2. 3. 4. 5. 6. 7. Inspector's Name: IA-w �Lic.#: 6 e 1(6 Y OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com