Loading...
HomeMy WebLinkAboutCompactionHeadquarters 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando 723 Progress Way Sanford, FL. 32771 Mailing PO Box 78-1377 Sebastian, FL. 32978 Phone: 772-589-0712 C.A.# 5693 KSMengineering.net KSM JOB #:214417-1d/JM/bm NUC #215 Nuc Model:MC-1DR-P Nuc Serial #:MD80404215 9 Juarez Way Spanish Lakes One Port St Lucie, Florida Compacted Foundation Fill DEPTH PEN READ DRY DENSITY MAX. DRY PROCTOR VALUE (P.C.F) PERCENT COMPACTION 1 S.E.0" - 12"15D 107.7 110.2 97.7% 2 S.W."14D 106.8 "96.9% 3 Center "15D 107.9 "97.9% 4 N.W."15D 107.7 "97.7% 5 N.E."15D 108.3 "98.3% Proctor Optimum Moisture: Proctor Max. Dry Density: P.C.F. @ Test Locations the Density & Penetrometer readings indicate the Degree of Compaction Meets 6/14/2021 Email to: dotty@wynnebc.com PE # 81439 Soil Description: JOB LOCATION: PERMIT #: CONTRACTOR:Wynne Development 2104-0108 Bryan E. Dahlke, P.E. V.P. of Engineering Test report shall not be reproduced, except in full, without the written approval of KSM Engineering & Testing Geotechnical Engineering - Construction Materials Testing - Special Inspections - Civil and Structural Consulting Respectfully Submitted: ITEM TESTED: 110.2 TEST LOCATION OF SAMPLE Proudly Serving Florida since 1990 SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 6938 June 11, 2021DATE TESTED: 8.6% 12.0% Brown/Gray Sand with Traces of Clay Certified Women Owned Business - WBE Minimum Requirement & Shell Fragments for Staked Foundation In Place Moisture: Disclaimer:Contractor is responsible to maintain the tested area in the condition that KSM completed the indicated passed compaction test.KSM is not responsible if the tested area has been altered from the approved inspected condition. 105.0 106.0 107.0 108.0 109.0 110.0 111.0 112.0 7 8 9 10 11 12 13 14 15 W E I G H T P . C . F . D R Y Moisture -% of Dry Weight