KSMengineering.net
KSM JOB #:214417-1d/JM/bm
NUC #215
Nuc Model:MC-1DR-P
Nuc Serial #:MD80404215
9 Juarez Way
Spanish Lakes One
Port St Lucie, Florida
Compacted Foundation Fill
DEPTH PEN
READ
DRY
DENSITY
MAX. DRY
PROCTOR VALUE (P.C.F)
PERCENT
COMPACTION
1 S.E.0" - 12"15D 107.7 110.2 97.7%
2 S.W."14D 106.8 "96.9%
3 Center "15D 107.9 "97.9%
4 N.W."15D 107.7 "97.7%
5 N.E."15D 108.3 "98.3%
Proctor Optimum Moisture:
Proctor Max. Dry Density: P.C.F.
@ Test Locations the Density &
Penetrometer readings indicate the
Degree of Compaction Meets
6/14/2021
Email to: dotty@wynnebc.com
PE # 81439
Soil Description:
JOB LOCATION:
PERMIT #:
CONTRACTOR:Wynne Development
2104-0108
Bryan E. Dahlke, P.E. V.P. of Engineering
Test report shall not be reproduced, except in full, without the written approval of KSM Engineering & Testing
Geotechnical Engineering - Construction Materials Testing - Special Inspections - Civil and Structural Consulting
Respectfully Submitted:
ITEM TESTED:
110.2
TEST LOCATION
OF SAMPLE
Proudly Serving Florida since 1990
SOIL COMPACTION REPORT
ASTM D 1557 and ASTM D 6938
June 11, 2021DATE TESTED:
8.6%
12.0%
Brown/Gray Sand with Traces of Clay
Certified Women Owned Business - WBE
Minimum Requirement
& Shell Fragments
for Staked Foundation
In Place Moisture:
Disclaimer:Contractor is responsible to maintain the tested area
in the condition that KSM completed the indicated passed
compaction test.KSM is not responsible if the tested area has
been altered from the approved inspected condition.
105.0
106.0
107.0
108.0
109.0
110.0
111.0
112.0
7 8 9 10 11 12 13 14 15
W
E
I
G
H
T
P
.
C
.
F
.
D
R
Y
Moisture -% of Dry Weight