HomeMy WebLinkAboutattachment 1Date..• � � i 6 � L"A." IL
Contractor:
lob Address.
Construction:
Planning & Development Services
Building & Cade Regulatloon Division
2300 Virginia Ave-, Rm 201
Fort Pierce, FL 34982
Phone: 772-462-2165
Fax: 772-462-6443
BLOWER DOOR TEST FORM
House Infiltration Test Certification
Prescriptive and Performance Method
Cal
Permit M.
9 Z i7 S t'I P..de✓ Cco.a� �d � L T /�o.ta ^�-L ? �7 �'
New Construction —Complete ( )Existing — After Addition
House Infiltration Test Results
CFM (50) `i �
Volume
�1
ACH (50) = CFM (50) x 60 / Volume = � `�
Passing results must be & ACH (50) or less
PLC Climate Zone 2
Test Date:
2,0,1
Mechanical Ventilation required less than
(V) Pass ( ) Fail
3 ACH
F13C, energy
The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per
hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a
blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either 1-ndividual5 as defined in
Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an
approved third party. A written report of the results of the test shall be signed by the party conducting the test and
provided to the code official. Testing shall be per -formed at any time after creation of all penetrations of the building
thermal envelope.
f:BC, Residential
Where the air infiltration rate of a dwelling unit is fens than 3 air changes per hour when tested with a blower door at a
pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Buildl*ng Cade, Energy Conservotl'on
the dwelling unit shall be provided with whale -house mechanical ventilation an accordance with section M1507.3.
Testing Company
Company Name..
Pro -Duct Services
Address-. 1915 Rio Vista Drive, Ft. Pierce, FL 34949
hereby certify that the above House Infiltration results demonstrate compliance with FBC Energy Conservation
requirements in accordance with Section R402.4.1.2 Climate done 2.
Im
Signature:
Printed Name: Martin Klein
License/Certi�icativn #.E
5061633
4
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772-462-2165 Fax 772-462-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Cerbificatlan
rrescrlptive and Performance Method
oats:: � � � b � L �' �[ Pemnit
6 7 dot #:
Contractor: � `� .a Address.
ram' •:����e�r��f -�.j ���� � �' 1
C-onstructon: Post Construction Test o Rough -in Test
Test Conditions:
Dam' � �'� t Floor Area (ft2)-
Time: Primary Location of Supply Ductwork t �.
indoor Temperature (F): Primary Location of Return Ductwork
Outdoor Temperature (F):
IM-4aka-g-o Test (Outside�
Duct Leakage: o Default �. Leak Free o Proposed On _ � • '' 3
Test Pressure: "z-- - - (Pa)
Baseline Duct Pressure (optional) —(Pa)
duct Press. (Pa) Flow Ring Fan Press Flow (ch) Resufts:Iss o Fail
Installed (Pa
0 Taal Leakage (cfm)4.
Total Leakage per 100 sqft: rWL - 3° � � .� � • �' �-
CFM25 x 100 divided by the CFA Duct Leakage CFM/1 00 sqft.
Testns Comony
Company Name: Pry -Dust Services
Address:
I hereby cetfy that the above Duct Sealing Leakage results demonstrate compliance wfth 5�1 Edifion FBC Energy Conservabon requirements in accordance with
Section R403.2.21.
Signature:
Printed Name: Marfin Klein License/Cerfificate #: 50616331,
�37
}
lb
41
I
10
_.BUILDING PERFORMANCE INSTITUTE, INC
107 Hermes Road. Suite 210
Malta, NY 12020
(877) 274-1274
w��v.bpi.org
ode-.
Martin Klein
11
BPI ID '. 5061633
(-ShE RE ER CE SIDE FOR DESIGNATIONS ANO EXPIRATION DATES)
CERTIFIED PROFESS*NAL MI N TION
EXPIRATION DATE
InffitraUon & Dui! Leakagc 412612024
BUILDING PERFORMANCE INSTITUTE, INC