HomeMy WebLinkAbout20-249A Ocean Harbor N - BLDG A - Reports & Final Cert Ltr - DSigned 06.16.21.docx
M L Engineering Inc.
2030 –37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
June 15, 2021
St. Lucie County Building Department
Planning & Development Services
2300 Virginia Avenue
Ft. Pierce, Florida 34982
RE: Ocean Harbor North Condominiums – Bldg A Concrete Repairs
Units 215, 315, 415, 515, 615 & 811
5151 North Highway A1A
Ft. Pierce, FL 34949
Engineer’s Project No.: 20-249A
St. Lucie County Bldg. Permit No. 2103-0590
To Whom It May Concern:
This letter shall serve as certification that to the best of our knowledge, the structural repairs have been
constructed in substantial conformance with the design documents and specifications and as duly noted in
our field reports.
Threshold Inspections for the above referenced project were performed from May 5, 2021 through June
15, 2021. Copies of all field reports were distributed to the Client, Engineer of Record, Contractor and to
the St. Lucie County Building Department.
If you have any questions, please call our office.
Respectfully,
Michael Lue, P.E.
Consulting Engineer
Threshold Inspector
Cc: Gene Ross – Elliott Merrill Community Management (Client)
Bob Stark – Structure-Con (Contractor)
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 20-249A Report No. 1
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Bldg. Dept.
Mr. Robert Stark – Structure-Con
Mr. Khris McConnell – Structure Con
Page 1 of 2
THRESHOLD INSPECTION REPORT
OCEAN HARBOR NORTH CONDOMINIUMS – BLDG. A CONCRETE REPAIRS
5151 N. HWY. A1A, FT. PIERCE, FL 34949
SLC BUILDING PERMIT NUMBER: 2103-0590
PROJECT NAME: Ocean Harbor N. Condos – Bldg. A DATE: May 6, 2021
CLIENT: Elliott Merrill Community Management LOCATION: Ft. Pierce, FL
CONTRACTOR: Structure-Con PROJECT MGR: Mr. Khris McConnell
INSPECTED BY: Todd Rhoten WEATHER: Sunny
WORK INSPECTED: Units 215/315, 315/415, 415/515, 811
OBSERVATIONS:
Units 215/315, 315/415 & 415/515
• Shoring is in place as specified on the permit drawings.
• The contractor has chipped and removed all loose concrete adjacent to the sliding glass doors.
• The deteriorated areas require a full-depth repair.
• Corrosion was found on the slab reinforcing bars as well as the top beam reinforcing under the sliding glass
door track.
• The doors were not removed, but access to the interior of the unit was necessary to place the form boards.
RECOMMENDATIONS:
Units 215/315, 315/415 & 415/515
• Place additional reinforcing bars lapped with the existing.
• All bars shall be power tool cleaned and painted with a corrosion inhibitor.
• Form and pour repair areas with a high strength repair mortar and provide proper clearance for all
reinforcing bars.
OBSERVATIONS:
Unit 811
• There is a visible ceiling spall and cracks at the north end of the balcony edge supporting the perimeter
parapet wall.
• The contractor removed the loose stucco and exposed visible corrosion in the bottom reinforcing bars.
• We inspected the roof and parapet wall above and found (3) areas where water is ponding under the roofing
membrane, which appears to be contributing to the concrete deterioration.
RECOMMENDATIONS:
Unit 811
• Shore the balcony edge at 4-feet maximum.
• Have a licensed roofing contractor repair the roof membrane along the parapet wall.
• Repair the ceiling in 2-foot sections between post shores and relocate shores where the slab is being repaired.
All work to date is in compliance with recommendations as indicated in the permitted documents.
______________________________ _________________________________
Michael Lue, P.E. Todd Rhoten, Inspector
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 20-249A Report No. 1
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Bldg. Dept.
Mr. Robert Stark – Structure-Con
Mr. Khris McConnell – Structure Con
Page 2 of 2
Pic 1
Unit 315
Full depth repair adjacent to sliding glass door.
Pic 2
Unit 515
Full depth repair adjacent to sliding glass door.
Pic 3
Unit 811
Ceiling spall under parapet wall.
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 20-249A Report No. 2
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Bldg. Dept.
Mr. Robert Stark – Structure-Con
Mr. Khris McConnell – Structure Con
Page 1 of 2
THRESHOLD INSPECTION REPORT
OCEAN HARBOR NORTH CONDOMINIUMS – BLDG. A CONCRETE REPAIRS
5151 N. HWY. A1A, FT. PIERCE, FL 34949
SLC BUILDING PERMIT NUMBER: 2103-0590
PROJECT NAME: Ocean Harbor N. Condos – Bldg. A DATE: June 1, 2021
CLIENT: Elliott Merrill Community Management LOCATION: Ft. Pierce, FL
CONTRACTOR: Structure-Con PROJECT MGR: Mr. Khris McConnell
INSPECTED BY: Todd Rhoten WEATHER: Sunny
WORK INSPECTED: Units 215/315, 315/415, 415/515, 515/615 & 811
OBSERVATIONS:
Units 215/315, 315/415 & 415/515
• All repaired areas have been poured with the approved repair mortar.
• Preparation for new waterproofing at repaired areas has begun.
• Stucco at ceiling applied at all full depth repairs.
Unit 515/615
• Tile removed at the spalled area.
• Loose concrete has been chipped at the east facing sliding glass door.
• Corrosion in the reinforcing bars does not extend into the unit.
• Spalling area is partial depth and does not require full depth repair.
Unit 811
• Roof slab edge has been repaired in the 2-foot sections as recommended.
• The extent of corrosion was limited to the north facing edge only.
• Stucco has been replaced at the repaired areas.
RECOMMENDATIONS:
Unit 515/615
• All bars shall be power tool cleaned and painted with a corrosion inhibitor.
• Form and pour repair areas with a high strength repair mortar and provide proper clearance for all
reinforcing bars.
All work to date is in compliance with recommendations as indicated in the permitted documents.
______________________________ _________________________________
Michael Lue, P.E. Todd Rhoten, Inspector
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 20-249A Report No. 2
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Bldg. Dept.
Mr. Robert Stark – Structure-Con
Mr. Khris McConnell – Structure Con
Page 2 of 2
Pic 1
Unit 315
Stucco repair at ceiling of full depth repair.
Pic 2
Unit 415
Surface repair ground flush with surrounding areas and
is ready for new waterproofing.
Pic 3
Unit 811
Ceiling spall repairs in progress.
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 20-249A Report No. 3
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Bldg. Dept.
Mr. Robert Stark – Structure-Con
Mr. Khris McConnell – Structure Con
Page 1 of 2
THRESHOLD INSPECTION REPORT
OCEAN HARBOR NORTH CONDOMINIUMS – BLDG. A CONCRETE REPAIRS
5151 N. HWY. A1A, FT. PIERCE, FL 34949
SLC BUILDING PERMIT NUMBER: 2103-0590
PROJECT NAME: Ocean Harbor N. Condos – Bldg. A DATE: June 15, 2021
CLIENT: Elliott Merrill Community Management LOCATION: Ft. Pierce, FL
CONTRACTOR: Structure-Con PROJECT MGR: Mr. Khris McConnell
INSPECTED BY: Todd Rhoten WEATHER: Sunny
WORK INSPECTED:
Units 215/315, 315/415, 415/515, 515/615 & 811 – Final Inspection
OBSERVATIONS:
• The repaired areas have new waterproofing and are ready for paint by the painting contractor.
• Stucco applied at ceiling of full depth repairs.
• (Units 515 & 615) - the owners are responsible for replacing the tile of the balcony deck.
• Hurricane shutters have been re-installed and are operable.
Unit 811
• Stucco has been replaced at the repaired areas and is ready for paint.
All work to date is in compliance with recommendations as indicated in the permitted documents.
A final certification letter will follow this report.
______________________________ _________________________________
Michael Lue, P.E. Todd Rhoten, Inspector
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 20-249A Report No. 3
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Bldg. Dept.
Mr. Robert Stark – Structure-Con
Mr. Khris McConnell – Structure Con
Page 2 of 2
Pic 1
Unit 415
New waterproofing at repair area.
Pic 2
Unit 515
Ceiling stucco repair from full depth repair.
Pic 3
Unit 615
New waterproofing at repair area.
Tile to be replaced by owner.