HomeMy WebLinkAboutAPPROVED, TRUSS LAYOUT0
n
c+�
F
cv
CA
C2
M
1' 10
1/2"
C4
0
-
C5
0
-
C6
0
-
C7
M
N
p
C8
0
_
C9
0
-
C10
�
G1
CJ3
00
Fn
CJ1
51' 10"
2' 8" 71411 251411
M ti ti tiLO co
w w w w w w w77�7
o n n o An n n
CJ1 o CJ1
T ><
CJ3 a o CJ3
0
F,
CJ5
a > CJ5
0
LB39
O
g
0
7
0
6
0
EB,5
0
4
0
LBJ3
0
B2
1'
10
1/2"
131
0
-
Al
<,
-
A10
0
0
A9
A8
0
A7
0
A6
0
-
A5
0
-
A4
5' 311
,y
M
A
v7-
U U
Y
CA
-
O
Y
n�
EJ61
_
orn
EJ62
U
EJ63
7'
6" N
i
=
M
H
S26-2
1
HTU26
8'-1" CLNG
0
u M ItIt co
U U WW U U
101811
HTU26
w
CA
8'-1" CLNG
18' 0"
191411
2 STAGE WA
8'-1" & 10'-9"
®CIA:►i0
MEMO
51, 10"
z
J
v
III
d
CJ
4' 0" rn
6' 8"
16' 6"
N
41411 121211
co co co co co
0 LO LO L co
u1 W u1 u1 u1 U U U
CA
0 0
r' CJ 3 -1
U) >< in
CJ5
o -
N
in
0
0
1' 10 1/2" N
w
8'-1" CLNG
12' 3 1/2"
8'-1" CLNG
4' 8 1/2"
16' 6"
0 �
0
0
0
0
0
0
O
0
0
D1 -
D O
D2
2' 1 1/2'
D3 c�
O
D3
0
D3 -
D
O
D3
D
0
D5
0
D5
0
D5 -
0
D5 -
Cy
D6 Fql
CJ3
o in
D CJ1�
0
n
n if 411
U U
11011
Hatch Legend
DWWvNV94VWW�I1 4
Christophe
D Beers
Digitally signed by Christopher D
r Beers
DN: c=US, o=Unaffiliated,
ou=A0141 OD00000172B9270F630000
B2DA, cn=Christopher D Beers
Date: 2021.02.05 13:27:50-05'00'
HANGER LEGEND
* - ALL 2x HANGERS SHOWN ARE HTU26 UNLESS NOTED
OTHERWISE
* - ALL 4x2 FLOOR HANGERS SHOWN ARE HHUS46
UNLESS NOTED OTHERWISE
MAIN WIND FORCE RESISTING SYSTEM/C-C HYBRID
IMPORTANT
WIND ASCE7-16
ENCLOSED
This Drawing Must Be Approved And
EXPOSURE CATEGORY C
Returned Before Fabrication Will
OCCUPANCY CATEGORY II
Begin. For Your Protection Check All
WIND LOAD 170 MPH
Dimensions And Conditions Prior To
*TRUSSES HAVE BEEN DESIGNED FOR A 10.0 PSF
Approval Of Plan.
BOTTOM CHORD LIVE LOAD NONCONCURRENT WITH
ANY OTHER LIVE LOADS
SIGNATURE BELOW INDICATES ALL
NOTES AND DIMENSIONS HAVE
ROOF LOADING
FLOOR LOADING
BEEN ACCEPTED.
TCLL: 20 PSF
TCLL: PSF
TCDL: 15 PSF
TCDL: PSF
BCDL: 10 PSF
BCDL: PSF
By Date
TOTAL: 37 PSF
TOTAL: PSF
DURATION: 1.25
DURATION:
CAUTION!!!
DO NOT ATTEMPT TO ERECT
TRUSSES WITHOUT REFERRING TO
THE ENGINEERING DRAWINGS AND
BSCI-131 SUMMARY SHEETS.
ALL PERMANENT BRACING MUST BE
IN PLACE PRIOR TO LOADING
TRUSSES. (ie. SHEATHING,
SHINGLES, ETC.)
ALL INTERIOR BEARING WALLS
MUST BE IN PLACE PRIOR TO
INSTALLING TRUSSES.
REFER TO FINAL ENGINEERING
SHEETS FOR THE FOLLOWING.
1) NUMBER OF GIRDER PLIES AND
NAILING SCHEDULE.
2) BEARING BLOCK REQUIREMENTS.
3) SCAB DETAILS (IF REQUIRED)
4) UPLIFT AND GRAVITY REACTIONS.
WARNING
Backcharges Will Not Be Accepted
Regardless of Fault Without Prior
Notification By Customer Within 48
Hours And Investigation By
Builders FirstSource.
NO EXCEPTIONS.
The General Contractor Is Responsible
For All Connections Other Than Truss
to Truss, Gable Shear Wall, And
Connections. Temporary and
Permanent Bracing, And Ceiling And
Roof Diaphragm Connections.
TRUSS CONNECTION
LIST
QTY
PRODUCT
LUS24
09
HTU26
HTU28
HHUS46
1
HHUS26-2
HGUS28-2
HGUS28-3
BUILDER:
G ROZA B L D RS
RES:
NA
MODEL: LA TORTUGA
ADDRESS: SILVER OAK DR
LOT / BLOCK:
--
CITY:
FORT PIERCE
COUNTY
ST LUCIE CO
DRAWN BY:
JL
JOB # :
2516936
DATE:
11/22/20
SCALE:
NTS
REVISIONS:
1.
2.
3.
4.
kilders
FirstSource
701 S. KINGS HIGHWAY
FORT PIECE, FL 34945
Ph. (772) - 461 5475