Loading...
HomeMy WebLinkAboutAPPROVED, NELSON-LAWRENCE roof infov ST. LUCIE WORKS ST LUCIE COUNTY ROOFING PERMIT INFORMATION SHEET Florida Building Code 7th Edition (2020) Based on Section 1525 of the Florida Building Cade - Building INSTRUCTION PAGE COMPLETE THE NECESSARY SECTIONS OF THE UNIFORM ROOFING SHEET APPLICATION FORM AND ATTACH THE REQUIRED DOCUMENTS AS NOTED BELOW; Roof system Low Slope Application Prescriptive BUR-RAS 150 Asphaltic Shingles Concrete or Clay Tile Metal Roofs Wood Shingles and Shakes Other Required Sections of the Permit Application Form A, B, C A, B, C A, B, D A, B, D, E A, B, D A, 8, D As Applicable Attachments Required See List Below 1,2,3,4,5,6,7 2,4,5,6,7 1,2,4,5,6,7 1,2,3,4,5,6,7 1,2,3,4,5,E;T 1 A4S,6,7 1,2,3,4,5,6,7 ATTACHMENTS REQUIRED As Applicable): 1. Fire Directory Listing Page 2. From Product Approval; Front Page Specific System Description Specific System Limitations General Limitations Applicable Detail Drawings 3. Design Calculations per Chapter 16, or if applicable, RAS 127 or RAS 128 4. Other Component of Product Approval 5. Municipal Permit Application 6. Owners Notification for Roofing Considerations (Reroofing Only) 7. Any Required Roof Testing/Calculation Documentation Form RooflnfoFeb21 Rev Feb 18, 2021 ST. LUCIE °VORKS Section C (Low Slope Roof) Fill in specific roof assembly components and identify manufacturer (If a component is not used, identify as "NA") System Manufacturer: Product Approval No.: Design Wind Pressures, From RAS 128 Or Calculations: Zone 1': _ Zone 1: _ Zone 2: _Zone 3: _ Max. Design Pressure, from the specific product approval system: Deck: Type: Gauge Thickness: Slope: Anchor/Base Sheet & No. df Ply(s): Anchor/Base Sheet Fastener/Bonding Material: Insulation Base Layer: Base Insultation Size and Thickness: Base Insulation Fastener/Bonding Material: Top Insulation Layer: Top Insulation Size and Thickness: Top Insulation Fastener/Bonding Material: Base Sheets) & No. of Ply(s): Base Sheet Fastener/Bonding Material: Ply Sheet(s)' & No. of Ply(s): Ply Sheet Fastener/Bonding Material: Top Ply: Top Ply Fastener/Bonding Material: Fastener Spacing for Anchor/Base Sheet Attachment: Zone 1':_" oc @ Lap, # Rows_ @ _• oo Zone 1:." oc @ Lap, # Rows _ @ _" oo Zone 2:_" oc @ Lap, # Rows _ @ _ • oo Zone 3:_" oc @ Lap, # Rows_ @ _" oo Number of Fasteners Per Insulation Board: Zone 1':_Zone 1:_Zone 2:_Zone 3 Illustrate Components Noted and Details as Applicable: Woodblocking, Gutter, Edge Termination, Stripping, Flashing, Continuous Cleat, Cant Strip, Base Flashing, Counterflashing, Coping, Etc., Indicate: Mean Roof Height, Parapet Height, Height of Base Flashing, Component Material, Material'Thickness, Fastener Type, Fastener Spacing or -Submit Manufacturers Details that Comply with RAS 111 and Chapter 16., Section D (Steep Slope Roof System) Roof system Manufacturer: BORAL BARCELONA 900 Notice of Acceptance Number: NOA#18-0509.15 Minimum Design Wind Pressures, If Applicable (From RAS 127 or Calculations): Zone 1: -57 Zone 2e: 101 Zone 2n:_Zone 2r.-N 7one 3e: -128 Zone 3r, Deck Type: PLYWOOD Roof Slope: Type Underleyment PEEL 8 STICK POLVGLASS MTS TUMAX FL#5259.1 8 12 Insulation: Fire Barrier: Ridge Ventilation? Fastener Type& Spacing: 6'FIELn R'PERIMETER, 6�RING SHgNKNAILS Adheshe Type: . Type Cap Sheet Mean RooPHeighl: 15' FT Roof Covering TILE Type 8, 8, m Edna: ST. LUCIE JORKS 1 Section E (Tile Calculations) For Moment based tile systems, choose either Method 1 or 2. Compare the values for Mr with the values from Mr. lithe Mfvalues are greater than or equal to the Mfvalues, for each area of the roof, then the tile attachment method is acceptable. Method 1'Moment Based Tile Calculations Per RAS 12T (Zone 1: xA= �O C._ -. f�-r,yl 3� Product Approval M� (Zone 2e: x7,j,,gJ_15U- Mg: I.nIssis Product Approval MrLOO (Zone 2n: __xl = _I_Mg: _=M_ Product Approval Mf (Zone 2r: 4a 1 I $�-fI rj=M� Product Approval Mf kAO (Zone 3e: (Qxk =,�U_MB7J7=%11 Product Approval Mfli2D (Zone 3r.-x)._---1- Mg: -=M,y_ Product Approval Mf Method 2 "Simplified Tile Calculations Per Table Below" Required Moment of Resistance lM.l Frnm T=tile peu.... „__...�.__. ... M, required Moment Resistance - Mean Roof Height Roof Slope 15' 20' 25' 30, 40' 2:12 34.4 36.5 38.2 39.7 42.2 3:12 32.2 34.4 36.0 37.4 39.8 4:12 30.4 32.2 33.8 35.1 37.3 5:12 28.4 30.1 31.6 32.8 34.9 6:12 26.4 28.0 29.4 30.5 32.4 7:12 -Must he uccd in 24.4 25.9 27.1 28.2 30.0 .. ............................. „,u.na,. uaseu u,e systems • For Uplift based tile systems use Method 3. Compare the values for F' with the values for F, If the F'values are greater than or equal to the F,values, for each area of the roof, then the tile attachment method is acceptable. Method 3 "Uplift Based Tile Calculations Per RA512T (Zone 1: _x L= x W:=_) -W; cos r= F,r_ Product Approval F' (Zone 2e: _x L=xW:=j-W cos r=F,i,_ Product Approval F' (Zone 2n: _x LxW:=J-W; cos r=F,z" Product Approval F' (Zone 2r: _x L_ x W:=_) -W: cos r= Fa,_ Product Approval F' (Zone 3e: _x L_=xW:=-W: cos r_ F,.ae_ Product Approval F' (Zone3r:_x L=xW:= _W:_Cos r=Fm,_ Product Approval F' Where to Obtain Information Description Symbol WheretoflM Design Pressure Zones 1, 2e, 2n, 2r, 3e, 3r From applicable table in RAS 127 or by an engineering analysis prepared by PE based on ASCE 7 Mean Roof Height H lob Site Roofslope 0 Job Site Aerodynamic Multiplier Product Approval Rertodng Moment due W Gravity Mr Product Approval Attachment Resistance Mf Product Approval Required Moment Resistance Me Calculated Minimum Attachment Resistance F' Product Approval Required Uplift Resistance F, Calculated Average Tile Weight W Product Approval Tile Dimensions L=length W=width Protluc[Appfoval All calculations must be submitted to the builtling oRidal at the time of permit application.