HomeMy WebLinkAboutFiberglass Step Anchoring Details01/07/2015 09:44 6634676780
0212-'19 09:58 FEOM-
p1birg''kiff's, ftp' Atfohoping
Guldelthes
co"row.-Inuallation
20A W
1) DO "A" holb - Wbpa&A-at
&6IMI-posidon ft096 I&AIRi iftds"
ftit�e pilinba;
1q.G0%.wsAe*. and lift
3) Ms* looation ofbole In L-brieket on the
concrete.
4) Move the 9V awayftm the houn.DrM
Wes in conmfe at do desima 100wom.
Tap in w cmems adm.
5) Replace Op so dW 60 tops Off the COUctets
awlwrs prouude-tkm& the t4m.
seem vft the auto and Wwfim-
Ei
HOME ULFUI
(2) 494154AbohorAssm*%
*mbly hwlWw;
3A.r it I w log =ew
11 7A 6" X I Wr vmher
.ppoorld Instsll000n.
-is-sp at the holoi
.,Fop
4) FUA- W Be "A UND la
*Oujh " offt anch
WAAMG: Failure to a
came *InWU[y.PIAQ6
house, b[ob = ft sad
rests is level. , - -
,"o Crest, big Dit wer A
P392/010 F-634
mail *o
J. P.Mm
p rob so-that&e
as
Im pia& t&cw the
chwzAemffi6sids
Df *9 1MM fir Me
r a vvnAer.
)r tw swp pioperly
stop *big the
OIL Ado IN Step
ow4wo