Loading...
HomeMy WebLinkAboutCreekside Lot 36-Weather Barrier.pdf®UNIVERSAL ENGINEERING SCIENCES Inspection Date: Z, —Z/— -z—I Project: e /2e2-!f sr, -le Address: -3 350 ?2t Al, j:� Ct-,Z -8(0 Check one: Z Regular Inspection: INSPECTION RESULTS Permit No. /l - © / 7�, ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Pdil�g• Ceiling Rough -In Water Piping &Test CHW Piping &Test Framing Panel/Feeder Gas Piping & Test Cond. Piping &Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: G _577 LcJ 2F+ re rz f3H a,cr Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved QNot f y K'ef"'ne_d Conditions/Comments 1. 2. 3. 4. 5. 6. 7. Inspector's Name: &ft� 46e_9,,,y_ Lic.#: 7-AJ 46 8 Cr OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com