Loading...
HomeMy WebLinkAboutCreekside Lot 46-Weather Barrier.pdf®UNIVERSAL ENGINEERING SCIENCES Inspection Date: G `ro — Project: dgaC :51 �e Address: 0- %at of <2(AL Check one: Regular Inspection: ❑ Reinspection INSPECTION RESULTS Permit No. Date of Initial Inspection: Inspection Type Requested (check): ao//- o/S/ BUILDING/STRUCTURAL ELECTRICAL PLUMBING=HWPiping AL Footing Underground Underground -In Slab Floor Rough -In Rough -In ng & Test Masonry Wall Rough -In Stack Piping & Test& Test Wall/Ceiling Ceiling Rough -In Water Piping & Tesg & Test Framing Panel/Feeder Gas Piping & Testg &Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: Gva--4%71-e— 2 6 A & Z - Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved Z Not Mm* /ak2ai,4 Conditions/Comments 1. 2. 3. 4. 5. 6. 7. Inspector's Name: Lic.#: ' Al OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com