Loading...
HomeMy WebLinkAboutCreekside Lot 46-Progress-Ziptape.pdf®UNIVERSAL` ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: 6 —/S — z ( Permit No. Project CND-._5 /'d-e Address: -� 306 %/L/,u i 2:2 C rF 4/6 Check one: V1 Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground -In Slab Floor Rough -In Rough -In g & Test Masonry Wall Rough -In Stack Piping & Test Test Wall/fig Ceiling Rough -In Water Piping & Test =Piping & Test Framing Panel/Feeder Gas Piping & Test & Test Structural Service/Ground Storm Piping & Test Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: / `71`� Inspection Results: AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments 1. 2. 3. 4. 5. 6. 7. Inspector's Name::ia Lic.#: OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com