HomeMy WebLinkAboutCreekside Lot 46-Progress-Ziptape.pdf®UNIVERSAL`
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date: 6 —/S — z ( Permit No.
Project CND-._5 /'d-e
Address: -� 306 %/L/,u i 2:2 C rF
4/6
Check one:
V1 Regular Inspection:
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
-In
Slab
Floor Rough -In
Rough -In
g & Test
Masonry
Wall Rough -In
Stack Piping & Test
Test
Wall/fig
Ceiling Rough -In
Water Piping & Test
=Piping
& Test
Framing
Panel/Feeder
Gas Piping & Test
& Test
Structural
Service/Ground
Storm Piping & Test
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type:
Area Inspected/Code: / `71`�
Inspection Results: AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments
1.
2.
3.
4.
5.
6.
7.
Inspector's Name::ia Lic.#:
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com