HomeMy WebLinkAboutSLC Building Permit-71
Code Compliance Division
2300 Virginia Avenue
Ft. Pierce, FL 34982
Phone: (772) 462-1553 Fax: (772) 462-1148
hftp://stiucieco.gov/co
Issued: 06/06/2008
Job Location: 2012 NW ROYAL FERN CT
Permit Type: Demolition
Job Description:
BUILDING PERMIT
Conf #: 668 Permit #: SLC- 0806-0074
City: PALM CITY
DEMO POOL SCREEN, REMOVE POOL DECK ABANDONED THE POOL, BACKFILL IN POOL
i
Page 1
S/D Harbour Ridge#6 Track A Lot: Block: Parcel: 4425-605-0020-000/0_
Contractor PAULY J JEFFERY J
2420 SW MAPLE WOOD DR
Property Owner J RICHARD CHABOT
2012 NW ROYAL FERN CT
J PAULY CONSTRUCTION 1 (772) 263-8268
PALM CITY, FL 34990
PALM CITY, FL 34990
(772) 336-1574
Setbacks Left: Right: Front: Rear: Zoning: PUD
Number of Units: 1.00 Floors: 1 Buildings: 1 Square Footage: 0.00
Minimum Floor Elevation: Flood Map: 41OF I Flood Zone: X Elev:
Permit holder acknowledges through acceptance of this permit that separate permits must be obtained as required by the Florida Building Code
including those for all electric, plumbing, mechanical, roofing, and structural works Further, he/she acknowledges responsibility to comply with all
requirements of the 2004 Florida Building Code.
NOTICE: In addition to the requirements in this permit, there may be additional rl strictions applicable to this property that may be found in the
records of this County, and .there may be additional permits required from other governmental entities such as water management districts, state
agencies, or federal agencies. s:553.79(10), F.S.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR
BUILDING IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. s 713.135, F.S.
Christopher Lestrange j �p• - ('�
Building Official Date
For Automated Inspections, Call (772) 462-1261
For Questions, Call (772) 462-2172
St. Lucie County Land Development Code Section 11.05.0� (A) (2) states; Building Permits shall expire and
become null and void if work authorized by such Building Peermit is not commenced, having called for and
received a satisfactory inspection, within six (6) months from the date of issuance of the permit, or if the work is
not completed within 18 months (permit by contractor) or 24 months (permit by owner) from the date of issuance
of the Building Permit.