Loading...
HomeMy WebLinkAboutHeath DeptSTATE OF FLORIDA DEPARTMENT OF HEALTH ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM CONSTRUCTION INSPECTION AND FINAL APPROVAL APPLICANT: Denise Rigdon AGENT: Ernesto Gamez (SEPTIC ENVIRONMENTAL SERVICES) APPLICATION # : AP1681569 PERMIT #:56-SF-2313344 DOCUMENT #:F11646575 DATE PAID :11 /26/2019 FEE PAID :545.00 RECEIPT #:56-PID-5052182 PROPERTY ADDRESS: 10151 S Indian River (Guest House) Fort Pierce, FL 34982 LOT: BLOCK: SUBDIVISION: ID#: 3529-231-0008-000-9 CHECKED [X] ITEMS ARE NOT IN COMPLIANCE WITH STATUTE OR RULE AND MUST BE CORRECTED. TANK INSTALLATION SETBACKS [ ] [01] TANK SIZE [1] 1090.00 [2] [ ] [27] SURFACE WATER 100 FT [ ] [02] TANK MATERIAL Polypropylene [ ] [28] DITCHES FT [ ] [03] OUTLET DEVICE [ ] [29] PRIVATE WELLS 137 FT [ ] [04] MULTI —CHAMBERED [ Y N ] [ ] (30] PUBLIC WELLS FT [ ] [05] OUTLET FILTER Polylok PL-68 ( ] [311 IRRIGATION WELLS FT [ ] [061 LEGEND 1. 70-143-11DC4 2. [ ] [321 POTABLE WATER 40 FT [ ] [07] WATERTIGHT [ ] [331 BUILDING FOUNDATIONS 7 FT [ ] [08] LEVEL [ ] [34] PROPERTY LINES 8 FT [ ] [09] DEPTH TO LID [ ] [35] OTHER FT DRAINFIELD INSTALLATION FILLED / MOUND SYSTEM [ ] [10] AREA [1] 584 [2] SQFT [ ] [36] DRAINFIELD COVER [ ] [11] DISTRIBUTION BOX HEADER X [ ] [37] SHOULDERS [ ] [12] NUMBER OF DRAINLINES 1. 4.00 2. [ ] [38] SLOPES [ ] [13] DRAINLINE SEPARATION [ ] [391 STABILIZATION [ ] [14] DRAINLINE SLOPE [ ] [15] DEPTH OF COVER ADDITIONAL INFORMATION [ ] [16] ELEVATION [ ABOVE / BELOW ]BM 35.00 [ ] [40] UNOBSTRUCTED AREA [ ] [17] SYSTEM LOCATION [ ] [41] STORMWATER RUNOFF [ ] [18] DOSING PUMPS [ ] [42] ALARMS [ ] [19] AGGREGATE SIZE [ ] [431 MAINTENANCE AGREEMENT [ ] [201 AGGREGATE EXCESSIVE FINES [ ] [441 BUILDING AREA [ ] [21] AGGREGATE DEPTH [ ] (45] LOCATION CONFORMS WITH SITE PLAN [ ] [46] FINAL SITE GRADING FILL / EXCAVATION MATERIAL [ ] [47] CONTRACTOR Ernesto Gamez (SEPTIC EN [ ] [221 FILL AMOUNT [ ] [48] OTHER INFILTRATOR Quick4 EQ36 (single c [ ] [23] FILL TEXTURE [ ] [24] EXCAVATION DEPTH ABANDONMENT [ ] [25] AREA REPLACED [ ] [49] TANK PUMPED [ ] [26] REPLACEMENT MATERIAL [ ] [501 TANK CRUSHED & FILLED Comments: Comments are on page 2. / St. Lucie CHD DATE: 06/09/2021 CONSTRUCTION [ APPROVED DISAPPROVED ] ' vironmenta��Sp 'alis 1 Nic le Mont n (Florida Department of He FINAL SYSTEM [ APPROVED / DISAPPROVED St. Lucie CHD DATE: 06/09/2021 Environmental Sp Icialist I Nic le Mon (Florida Department of He (Explanation of Violations on following page) DH 4016, 08/09 (Obsoletes all previous editions which may not be use Incorporated: 64E-6.003, FAC Page 2 of 3 EH Database v 1.0.1 AP1681569 EID2313344 STATE OF FLORIDA DEPARTMENT OF HEALTH ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM CONSTRUCTION INSPECTION AND FINAL APPROVAL Violation Number Comment Comments APPLICATION # : AP 1 681 569 PERMIT #:56-SF-2313344 DOCUMENT #: F11646575 DATE PAID" 1 /26/2019 FEE PAID :545.00 RECEIPT #:56-PID-5052182 The system is sized for 2 bedrooms with a maximum occupancy of 4 persons (2 per bedroom), for a total estimated flow of 300 gpd. New ST, filter, and 5x9 long BED DF installed. No violations, system ok to cover. Contractor notified by phone. No final nspection required. Final system approved. Emailed final approval to contractor. DH 4016, 08/09 (Obsoletes all previous editions which may not be used) Incorporated: 64E-6.003, FAC Page 2 of 3 EH Database v 1.0.1 AP1681569 EID2313344