Loading...
HomeMy WebLinkAboutTermite CertPlanning &Development Services Building &Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT. PERMIT #: (L��� �'7 � 5 BUILDER/CONTRACTOR: PEST CONTROL CONTRACTOR The Bug Assassin's LLC PEST CONTROL LICENSE # : JB274536 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated : 21� C Percentage of solution: t `, Date of Treatment: b� �—"��"�` Footing lst Treatment Re -Treat Driveway 1St Treatment Re -Treat Other 15t Treatment Re -Treat Chemicals used: �� r Total gallons used: 1;� Time of Treatment: �> �� � � ��5 ��� ����� Slab �1St Treatment Re -Treat Pools 15t Treatment Re -Treat Perimeter for Final Inspection �'�vl �1 Signature ofUExterminator Date Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection wil/ fail and a re -inspection fee charged, FBC 104.2.E Certificate of Protective Treatment for prevention of termites. A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit fi/es, The Treatmenf Certificate shall pro vide the product used, identity of the app/icator, time and date of the treatment, site location, area treated, chemica/ used, percent concentration and number ofgallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014 J�