Loading...
HomeMy WebLinkAbout213 Signed Proposal856 US Highway 1 Vero Beach, FL 32960 License CCC1329687 213 River Walk Proposal Date 4/20/2021 Estimate # Rep 11580 JIlI rch*ld Island )of *in Ly Project Address: 213 River Walk Shingle re -roof Scope of Work Remove existing roof system, including all flashing, and counterflashing on the house at 213 River Walk and dispose of the same. We are assuming that there is one layer of shingles, and one layer of 30# felt paper to remove. If the roof is different from this, additional charges to remove the additional material will be added. Nail off plywood to existing code. If there is any rotted plywood it will be replaced at ($110.00 per sheet) Any other needed repairs on the SOFFIT, FASCIA and SUB -FASCIA will be made at $65 per hour/ per man plus material cost. Materials removed may be recycled with the proceeds going to Orchid Island Roofing. This rebate is figured into the total cost of the job. All materials will be installed per Florida Building Code Install materials listed below UNDERLAYMENT WIP Grip peel & stick underlayment FLASHING Drip edge (aluminum) Wall flashing (galvalume) Step flashing (galvalume) Valley metal roll (galvalume) SHINGLE ROOF SYSTEM Starter shingles Owens Corning Shingles "Duration" OC Pro -Edge Ridge Cap Lead Boots Galvalume gooseneck vents Lomanco Omni Roll Ridge Vent 8D Ringshank 2 1/2" Coil Nails Coil Nails O/R proposes to furnish labor and materials for the above specs for the sum of G�{lT7Fjp,_ Date of acceptance C_)G- C> _-Q - Signature Payment: 30%deposit, 50%when underlayment is installed, balance when lob is complete. Cat Acceptance of proposal, and the terms on the reverse side are hereby accepted.OlR LLC is authorized to do the work specified. Prices good for 15 days from date of proposal. (772)643-5950 Page ��+�'�, �--r;. .:C 9 orchid island roofing. com 856 US Highway 1 Vero Beach, FL 32960 License CCC1329687 213 River Walk Project Address: 213 River Walk Scope of Work Proposal Date 4/20/2021 Estimate # Rep 11580 J111 rchid Island :)of *i ne Shingle re -roof Modified Bitumen roof cement Dump fees Orchid Island Roofing will purchase all required permits KEEP GUTTERS Orchid Island Roofing warranties that this shingle roof will not leak for 5 years, under normal conditions. Orchid Island Roofing will repair any leak in this time period. Any hurricane force winds void this warranty. Please note, although great care will be taken to protect all plants, and grass from any damage, some minor damage may occur. Grass, in the path around the house will be walked on multiple times daily. While this will cause some stress to the grass, OIR can not be responsible for replacing any sod. Plants around the house will be covered by a tarp during the removal process, and the weight of this may cause some damage to foliage. Because we take great care to avoid this, OIR will not be responsible for damaged plants. OIR proposes to furnish labor and materials for the above specs forthesum of.- $19 997.00 K_ 1. 1..��' e �.ci AIL ! J1'��-3� �3 cc-'`` G�iT7Js� Date of acceptance C-,(, Sig)kre i Payment: 30% deposit, 50% when underlayment is installed; 156165(�% n to is complete. Acceptance of proposal, and the terms on the reverse side are hereby accepted. OR LLC is authorized to do the work specified. �►�ew Prices good for 15 days from date of proposal. (772)643-5950 Page 2 orchid island roofing. com