HomeMy WebLinkAbout213 Signed Proposal856 US Highway 1
Vero Beach, FL 32960
License CCC1329687
213 River Walk
Proposal
Date
4/20/2021
Estimate # Rep
11580 JIlI
rch*ld Island
)of *in Ly
Project Address: 213 River Walk Shingle re -roof
Scope of Work
Remove existing roof system, including all flashing, and counterflashing on the house at 213 River Walk and dispose
of the same. We are assuming that there is one layer of shingles, and one layer of 30# felt paper to remove. If the
roof is different from this, additional charges to remove the additional material will be added.
Nail off plywood to existing code.
If there is any rotted plywood it will be replaced at ($110.00 per sheet) Any other needed repairs on the SOFFIT,
FASCIA and SUB -FASCIA will be made at $65 per hour/ per man plus material cost.
Materials removed may be recycled with the proceeds going to Orchid Island Roofing. This rebate is figured into the
total cost of the job.
All materials will be installed per Florida Building Code
Install materials listed below
UNDERLAYMENT
WIP Grip peel & stick underlayment
FLASHING
Drip edge (aluminum)
Wall flashing (galvalume)
Step flashing (galvalume)
Valley metal roll (galvalume)
SHINGLE ROOF SYSTEM
Starter shingles
Owens Corning Shingles "Duration"
OC Pro -Edge Ridge Cap
Lead Boots
Galvalume gooseneck vents
Lomanco Omni Roll Ridge Vent
8D Ringshank 2 1/2" Coil Nails
Coil Nails
O/R proposes to furnish labor and materials for the above specs for the sum of
G�{lT7Fjp,_
Date of acceptance C_)G- C> _-Q - Signature
Payment: 30%deposit, 50%when underlayment is installed, balance when lob is complete. Cat
Acceptance of proposal, and the terms on the reverse side are hereby accepted.OlR LLC is authorized to do the work specified.
Prices good for 15 days from date of proposal.
(772)643-5950 Page ��+�'�, �--r;. .:C
9 orchid island roofing. com
856 US Highway 1
Vero Beach, FL 32960
License CCC1329687
213 River Walk
Project Address: 213 River Walk
Scope of Work
Proposal
Date
4/20/2021
Estimate # Rep
11580 J111
rchid Island
:)of *i ne
Shingle re -roof
Modified Bitumen roof cement
Dump fees
Orchid Island Roofing will purchase all required permits
KEEP GUTTERS
Orchid Island Roofing warranties that this shingle roof will not leak for 5 years, under normal conditions. Orchid
Island Roofing will repair any leak in this time period. Any hurricane force winds void this warranty.
Please note, although great care will be taken to protect all plants, and grass from any damage, some minor
damage may occur. Grass, in the path around the house will be walked on multiple times daily. While this will cause
some stress to the grass, OIR can not be responsible for replacing any sod. Plants around the house will be covered
by a tarp during the removal process, and the weight of this may cause some damage to foliage. Because we take
great care to avoid this, OIR will not be responsible for damaged plants.
OIR proposes to furnish labor and materials for the above specs forthesum of.- $19 997.00
K_ 1. 1..��' e �.ci AIL ! J1'��-3� �3 cc-'`` G�iT7Js�
Date of acceptance C-,(, Sig)kre i
Payment: 30% deposit, 50% when underlayment is installed; 156165(�% n to is complete.
Acceptance of proposal, and the terms on the reverse side are hereby accepted. OR LLC is authorized to do the work specified. �►�ew
Prices good for 15 days from date of proposal.
(772)643-5950 Page 2 orchid island roofing. com