Loading...
HomeMy WebLinkAboutENCODES & MJProject Summary Entire House Job: Date: 6.2020 Lindstrom Air Conditioning BY: LINDSTROM 3581 W MCNAB RD, POMPANO BEACH, FL 33069 Phone: 954-421-4117 Fax: 954.420-0064 Web: www.linctstromair.com For: HOMECRETE Notes: BYERS RES v ucau ICr Winter Design Conditions Outside db Inside db Design TD 42 0 70 °F 28 OF Heating Summary Structure Ducts 20331 Btuh Btuh Central vent (58 cfm) 3311 3311 Btuh Outside air 1793 Humidification 0 Btuh Piping 0 Btuh Equipment load 25434 Btuh Infiltration Tort Pierce, FL, US Method Construction quality Fireplaces Simplified Average 0 Area (W Volume �f Air changes/hour Equiv. AVF (cfm) He 8b2 1$521 .21 0 38 Coolin gt3) 18521 0.20 62 Heating Equipment Summary Make CARRIER Trade Model CH14NA036 AHRI ref Efficiency Heating input 8.2 HSPF Heating output Temperature rise 33800 Btuh @ 47°F Actual air flow Air flow factor 1200 OF cfm Static pressure 0.051 0 c cfm/Btuh Space thermostat H2O Capacity balance point = 0 OF CARRIER BackuInput =p7 kW, Output =24512 Btuh, 100 AFUE Summer Design Conditions Outside db Inside db Design TD Daily range Relative Humidity Moisture difference 90 OF 75 OF 15 OF M 50 % 61 gr/lb Sensible Cooling Equipment Load Sizing St ructure Ducts 16317 Btuh Central vent (5$ cfm) 5454 Btuh961 Outside air Btuh Blower 0 Btuh Use manufacturer's data Rate/swing multiplier 0 95n Equipment sensible load 21596 Btuh Latent Cooling Equipment Load Sizing Structure 3779 Btuh Ducts 1589 Btuh Central vent (58 cfm) 2434 Btuh Outside air Equipment latent load 7802 Btuh Equipment Total Load /ISen+Lat) 29398 Btuh Req. total capacity at 0.76 SHR 2.4 ton Cooling Equipment Summary Make CARRIER Trade Cond CH14NA036 Coil FB4CNP036 AHRI ref Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 14 SEER 25000 Btuh 8000 Btuh 33000 Btuh 1200 cfm 0.055 cfm/Btuh 0 in H2O 0,74 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsoftd Right---.OJECTS ENERGYIA- MANUAL J1SH'OMM EC R ETE -BYERS. rup 2 Calc =MJ2021-Jun-19 12:33:17 8 Front Door faCes: N Page 1 Right-J® Worksheet w Job: Entire House Date: 6-2020 Lindstrom Air Conditioning By: LINDSTROM 3581 W MCNAB RD. POMPANO BEACH. FL 33069 Phone: 954-421-4117 Fax: 954-420-0064 Web: www.lindstromair.com 1 Room name 2 Exposed wall Entire House BEDROOM 2 3 Room height 182.5 ft 26.0 ft 4 Room dimensions 5 Room area 10.0 ft 10.0 ft heat/cool 1852.0 ft 214.4 x 172.8 ft 12.0 ft Ty Construction U value Or IITM (ft') number (BtuhJW'F) (Btuhlft' Area perimeter (ft) Load (Btuh) Area (ft'4ft or perimetHeat Cool Gross N/P1S Heat Cord Gross 4(B1 ool 6 13A Boca0.111 1 D-h2om n 3.11 1.48 440 0.870 346 1075 511 0 1D-h2om n 0.00 0.00 0 0.870n 24.36 22.27 30 1 0 0 0 0 0 0 1 D-h2omd 11 13A-6ccs 0.870 n 24.36 22.27 64 0 1 731 1559 668 1426 p 0 0 0 1 D-h2om 0.111 a 3.11 1.48 304 0.870 e 24.36 52.63 9 280 870 413 96 9G0 0 �0 0 142 1 D-h2om 13A-6ocs 0.870 e 24.36 53.71 15 1 1 219 365 474 806 0 p 0 1 D-h2om 0.111 s 3.11 1.48 256 0.870 s 24.36 22.27 211 656 311 112 977 3011 143 1 D-h2om 1Da12ob 15 0.870 s 24.36 22.27 30 30 60 365 731 334 668 15 15 3605 334 13A-6oca 0.650 s 0.00 0.00 0 0.111 w 3.11 29 0 0 0 0 0 0 0 0 1D-h2om 1.48 296 0.870 w 24.36 53.31 12 254 375 0 p 0 0 0 10-h2om Fi 128-pbw 0.870 w 24.36 53.71 30 0.097 1 3 292 292 731 640 1611 p 0 0 0 0 t--p 11 DO C - 2.72 0.61 172 0.390 a 10.92 10.34 22 150 22 407 92 0 p 0 0 0 0 16B-30ad F 22A4pm 0.032 a 0.90 1.60 1852 1852 240 1659 227 2963 p 173 1.180 a 33.04 0.00 1852 183 6030 0 173 173 26 155 276 859 0 6 c) AED excursion Envelope loss/gain 0 -79 12 a) Infiltration 16722 11519 1979 816 b) Room ventilation 3609 1018 579 163 13 Intemal gains: Occupants @ 230 0 0 0 0 6 Appliances/other 24000 1 230 Subtotal (lines 6 to 13) 0 Less external load 20331 16317 2558 1210 Less transfer 0 0 0 Redistribution 0 0 0 0 0 14 Subtotal 0 0 0 0 15 Duct loads 16% 33% 20331 3311 16317 5454 16% 33% 2558 1210 Total room load 417 404 Air regtired (cfm) 23642 21772 2975 1614 1200 1200 151 89 Calculations a roved b ACCA to meet all r uirements of Manual J 8th Ed. r•- wrightsot't� Right-Suite® Universal 2019 19.0.. 2 RSUM98 OJECTS iNERGY\A- MANUAL JIHOMECRETE 2021-Jun-19 12:33:17 - BYERS.ru Calc = MJ8 Front Door faces: N Page 1 Right-J® Worksheet Erifire House Job: Date: 6-2020 Lindstrom Air Conditioning BY: LINDSTROM 3581 W MCNAB RD, POMPANO BEACH, FL 33069 Phone: 954-421-4117 Fax: 954420.0064 Web: www.findstromair.com 1 Room name ft 26.0 10.0 ft 12.0 168.0 ft= BED 2 ft heat/cool x 14.0 ft 2 Exposed wall 3 Room height 4 Room dimensions 5 Room area Ty Construction U-value Or HTM number (Btuh/ft? °F)' (Btuhift� BATH 2 6.0 ft 10.0 ft heaticool 6.0 x 10.0 60.0 ft, Area ftz or perimeter (ft) (8tuh) or r perimea feter (ft) Load (g ) Heat Cool 6 13A-6ocs 0.171 n 3.11 1.48 1 D-h2om 0.870 n 0.00 0.00 i D-h2om 0.870 n 24.36 22.27 11 1j phS 0.870 n 24.36 22.27 0,111 a 3.11 1.48 ID-h2om 0.870 a 24.36 52.63 1 D-h2om 0.870 e 24.36 53.71 1�1 13A-600s 0.111 s 3.11 1.48 1D-h2om 0.870 s 24.36 22.27 ID-h2om 0.870 s 24.36 22.27 1 D-h2ob 0.650 s 0.00 0. DO 13A-6ocs 0.111 w 3.11 1.48 1 D-h2om 0,870 w 24.36 53.31 i D-h2om 0.870 w 24.36 53.71 12B-Olow 0.097 - 2.72 0.61 11DO 0.390 a 10.92 10.34 C 188-30ad 0,032 a 0.90 1.60 F 22A4pm 1,180 a 33.04 0.00 Gross 48 9 0 0 p 0 0 p 0 p 0 0 s0 60 N/P/S 0 0 0 0 39 1 0 0 0 0 0 0 0 60 6 Heat 0 0 121 219 0 0 0 0 0 0 0 0 0 54 198 Cool Gross N/P/S Heat Cool 0 0 0 58 474 0 0 0 0 0 0 0 0 112 0 0 p 0 15 p 0 0 0 0 0 0 0 0 0 0 168 168 112 0 0 80 1 0 0 0 0 0 0 D 1 26 348 0 0 0 D 0 250 0 S 0 0 0 0 0 0 0 0 0 D 151 859 165 0 0 120 0 800 0 0 0 0 D 0 0 0 0 26 0 0 6 c) AED excursion -21 -59 Envel opeloss/gain 592 606 1975 1301 12 a) Infiltration 579 0 163 0 b) Room ventilation 134 0 38 0 13 Internal gains: Occupants Q 230 Applianceslother p 0 1 230 03) Subtotal (lines 6 to 1 726 644 2554 1694 Less external load 0 0 0 644 215 16% 33% 0 0 0 2554 416 0 0 0 1694 566 14 131 Less transfer Redistribution S ubtotal Duct loads 16% 33% 0 0 0 726 118 Total room load 2970 151 2260 125 Air required (cfm) 844 43 859 47 CalCUlations approved by ACCA 'i'{r wrtght�oft•° ,,e& Right-Su@ee Universal 2019 19.0.12 RSU08398 ...OJECTS ENERGYIA- MANUAL JIHOMECRETE - BYERS.rup Calc to meet all requirements = MJ8 Front Door faces: N of Manual J 8th Ed. 2021-Jun-19 12:33:17 Page 2 Right-JO Worksheet w Job: Entire House Date: 6-2020 Lindstrom Air Conditioning BY: LINDSTROM 3581 W MCNAB RD, POMPANO BEACH, FL 33069 Phone: 954-421-4117 Fax: 954-420-0064 Web: www.lindstromair.com 1 Room name 2 Exposed wall 3 Room height DINING ROOM 17.0 ft AT GREAT ROOM 4 Room amensions 5 10.0 ft heaticool 10. o ft 1 ft Room area 18.0 x 18.0 ft 17.0 x heat/cool 17.0 ft Ty Construction 32d.0 H' U-value Or 289.0 ft, number (BtuhlFt�-°F) (BHT�MftZ Area (ft') Load Area (ft) Load Perimeter (ft) (Btuh) or perimeter (ft) (Btuh) 6 13A 6ocs Heat Cool Gross N/PIS Heat Cool Gross N/P/S Heat Cool 1D-h2om 1D-h2om 0.111 n 3.11 1.48 0 0 0.870 n 0.00 0.00 0 0 0 136 72 220 106 ID-h2omd 0.870 n 24.36 22.27 0 0.870 n 24.36 p 0 0 0 0 0 0 11 13A�ocS 1D-h2om 22.27 0 0 0.111 a 3.11 1.48 0 0 0 0 64 0 1559 1420 1D-h2om 0.870 a 24.36 52.63 0 0 0.870 p 0 0 0 0 0 13A-6ocs a 24.36 53.71 0 0.111 S 3.11 0 0 0 0 0 0 1D-h2om ID-h2om 1.48 144 114 354 0.870 s 24.36 22.27 0 0 168 0 0 0 0 0 p ID-h2ob 0.870 s 24.36 22.27 0 30 30 731 0.650 S D DD 0 660 0 0 0 0 0 0 IW 13A-6ocs 0.00 0.111 w 3.11 1.48 0 14 D 0 0 0 0' 0 I---� 1D-h2om t-- G 12Mbw 0.870 w 24.36 53.31 0 0 0 0 0 0 0 0 0 D 126-0bw 0.870 w 24.36 53.71 0 0 0 0.097 - 0 p 0 D D 0 11 DO C 166-30ad 2.72 0.61 0 D D 0.390 a 10.92 10.34 p D 0 0 0 0 0 0 0 F 22A-tpm 0.032 a 0.90 1.60 324 324 290 1.180 a 33.04 0,00 324 518 289 289 259 462 17 562 0 289 16 529 p 6 c) AED excursion 90 -176 Envebpe loss/gain 1265 2570 1176 12 a) Infiltration 1937 113 379 107 b) Room ventilation 401 13 Internal gains: 0 Occupants 230 0 0 0 0 2 460 0 Appliannces/� er Subtotal (lines 6 to 13) 0 300 1378 2949 2686 Less external load 2338 0 0 Less transfer 0 Redistribution 0 0 0 0 0 14 Subtotal 0 0 0 0 Duct loads 2338 33% 381 13782949 q61 2686 otal room load ft:Air 16% 33%480 898 1839 3429 3583 required (cfm) 2719 138 101 174 197 Calculations aPproved by ACCA to meet all re uirements of Manual J 8th Ed. �1' • � wrlgfstsoft° 2021-Jun-19 12 e z ...OJECTS ENERGZ- idANUALtJWOMECRETE RSU08M�J8 - BYERS.ruup Calc Front Door faces: N Page 3 3 Right-J(H) Worksheet Job: µ Entire House Date: 6-2020 Lindstrom Air Conditioning By; LINDSfROM 3581 W MCNAB RD, POMPANO BEACH, FL 33069 Phone: 954-421-4117 Fax: 954-420-0064 Web: www.lindstromair.com 1 Room name 2 Exposed wall 3 Room height PANTRY 19.0 ft KITCHEN 4 Room dimensions 5 Room area 10.0 ft 11.0 heat/cool 4.0 10.0 ft 0 ft heattcool 440 ft2 x ft 210,0 x 150 0 ft 15.0 ft TY Construction U-value Or number (Btuh/ft?°F) (BtulVft� orr periea reter (ft) (Botch) or r load perimeter (ft) (Btuh) 5 11AA!! 13A-6ocs Heat Cool Gross N/PIS Heat Cod Gross NIP/S Heat Cool I r`r-`'-tG; 1D-h2om 0.111 n 3.11 1.48 80 0.870 n 0.00 0.00 80 249 118 0 1D-h2om 1D h2amd 0 0.870 n 24.36 22.27 0 1 0 0 0 p 0 0 0 0 11 13A-6ocs 0.870 n 24.35 22.27 0 0.111 0 p 0 0 0 0 10-h2om "--GG a 3.11 1.48 64 0.870 e 24.36 52.63 0 190 94 p 0 0 o 1D-h2cm 13A-600s Vh 0.870 a 24.36 53.71 0 0 0 0 0 0 0 1D-h2om 0.111 s 3.11 1.48 0.870 s 24.36 22.27 0 0 0 0 0 0 0 0 0 0 10-h2om 1 D-h2ob 0.870 s 24.36 22.27 0 0 0 p 0 0 p 0 W 13A-6ocs 0.650 S 0.00 0.00 0 0,111 0 0 0 0 0 0 0 --G 1D-h2om '--G w 3.11 1,48 p 0.870 w 24.36 63.31 0 p 0 0 0 O O O 0 0 1 D-h2om 12B-obw 0.870 w 24.36 53.71 0 0 0 0 0 D 0 p 11 D0 0,097 - 2.72 0.51 0 0.390 a 10.92 10.34 p 0 0 0 0 0 0 0 0 0 C C 16B-30ad F 22A-tpm 0,032 a 0.90 1.60 44 1.180 0 44 0 39 0 70 0 150 0 150 0 0 a 33.04 0.00 44 19 628 0 150 0 134 0 240 0 6 c) AED excursion Envelope24 loss/gain -125 12 a) Infiltration 1115 259 134 115 b) Room ventilation 401 113 0 0 13 Intemalgains: Occupants 230 0 0 0 0 0 AppliannGWot er 0 0 0 Subtotal (lines 6 to 13) 0 1800 Less external load 1516 372 134 1915 Less transfer 0 0 0 Redistribution 0 0 0 0 0 14 Subtotal 0 0 0 0 15 Duct loads 16% 33% 1516 247 372 124 16% 331/0 134 1915 Total room load 22 640 Air required (cfm) 1763 496 156 2555 � 27 8 141 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. �` wrYghtsoftw AIZ ...OJECTS ENERGM- MANULJIHO ECRETE ?.07.1-Jun-19 12:e - BYERS.rup Calc =MJB Front Doorfaces: N Page 4 4 :met Right-J® Worksheet Job: no..� Enure House Date: 6-2020 Lindstrom Air Conditioning By: LINDSTROM 3581 W MCNAB RD, POMPANO BEACH, FL 33059 Phone: 954-421-4117 Fax 9sa420-nnAA 1Nah• 1 2 Room name Exposed wall LAUNDRY MASTER TOILET 3 4 Room height Room dimensions 7.0 ft 10.0 ft heaUcool 4.0 ft 10.0 ft heat/cool 5 Room area 10.0 x 7.0 ft 4.0 x 6.5 ft 70.0 ftz 26.0 Ft' Ty Construction U-value Or HTM Area (ft-2) Load Area (ft') Load number (Btuhlft? °F) (Btuwft7) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cod Gross N/P/S Heat Cool Gross I N(P/S Heat Cod 6 13A-6ocs 0.111 n 3.11 1.48 0 0 0 0 0 0 1 D-h2om 0.870 n 0.00 0.00 0 0 0 0 0 0 0 0 0 0 1 D-h2om 0.670 n 24.36 22.27 0 0 0 0 0 0 0 0 1 D-h2omd 0.870 n 24.36 22.27 0 0 0 0 0 0 0 0 1 1 13A boos 0,111 e 311 1.48 0 0 0 0 0 0 0 1 D-h2om 0.870 e 24.36 52.63 0 0 0 0 0 0 0 0 0 1 D-h2om 0.870 a 24.36 53.71 0 0 0 0 0 0 0 0 Vh 13A-6ocs 0.111 s 3.11 1.48 0 0 0 0 0 0 0 1 D-h2om 0.870 s 24,36 22.27 0 0 0 0 0 0 0 0 0 1D-h2om 0.870 s 24.36 22.27 0 0 0 0 0 0 0 0 V a! 1 D-h2ob 13A-6ocS 0.650 0.111 s w 0.00 3.11 0.00 1.48 0 0 0 0 0 0 0 0 LL_ 1 D-h2om 0.870 w 24.36 53.31 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 D-h2om 0.870 w 24.36 53.71 0 0 0 0 0 0 0 0 0 0 12B-Obw 11DO 0.097 - 2.72 0.61 56 34 92 21 32 32 87 20 C 1613-30ad 0.390 0.032 a a 10.92 0.90 10.34 1.60 22 70 22 240 227 0 0 0 0 F 22A-tpm 1.180 a 33.04 0.00 70 70 7 63 231 112 0 26 26 26 4 23 132 42 0 6 c) AED excursion -41 -4 Envelope loss/gain 627 320 242 57 12 a) Infiltration 0 0 0 0 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants 230 D 0 0 0 Applianceslother 3001 0 Subtotal (lines 6 to 13) 627 620 242 57 Less external load 0 0 Less transfer 0 0 0 0 0 0 Redistribution 0 0 0 0 14 15 Subtotal Duct loads 627 620 242 57 16% 33% 102 207 16% 33% 39 19 Total room load 729 827 Air required (cfm) 37 46 ����747 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed +�r wrlght�oTt" 2021-Jun-1912:33:17 Right EN-SuiteO Universal 201919.0.12 RSU0839B Page 5 ...OJECTS ERGYIA• MANUAL JIHOMECRETE - BYERS.rup Calc = MJ8 Front Door faces: N p Right-J® Worksheet 1 Job: "� Entire House Date: 6.2020 Lindstrom Air Conditioning BY: LINDSTROM 3581 W MCNAB RD, POMPANO BEACH. FL 33069 Phone954-421-4117 Fax: 954-420-0064 Web: www. lindstrom air, corn 1 Room name 2 Exposed wall 3 Room height MASTER BATH 23.5 ft WIC MASTER INT 4 Room dimensions 5 Room area 10.0 ft 12.0 heat/cool 10.0 ft 0 ft heat/cool x 144.0 ftz 12, 0 ft 6.0 x 8.0 ft Ty Construction U-value Or r 48.0 ft' number (Btuh/fV °F) (Btuh/ft2) or periea meter (ft) (Bttuuh) oor� (ft-) Load perimeter (ft) (Btuh) 6 13A rocs Gross N/P/S Heat Cool Gross N/P/S Heat Coot 1D-h2om 0.111 n 8 0 0.870 n0 T 0 0 0 1 D-h2om 1D-h2omtl 0.870 n p 0 0 0 0 0 0 0 0 p 13A-6ocs 0.870 n 0 0 0 0 00,111 1D-h2om 1 D-h2om a p 0,870 a .52.63 0 0 0 0 C 0 0 0 p 0 0 0 13A-6orn Vh 0.870 a 24.36 53.71 0.111 0 0 0 0 o p 1D-h2om 1D-h2om s 3.11 1.48 0 O.B70 s 24.36 22.27 p 0 p 0 0 0 0 00 p p 10-h2ob 0.870 s 24.36 22.27 p 0.650 p 0 0 0 0 0 0 0 p W 13A-boos s 0,00 0.00 0 0.111 w 3.11 1.48 0 0 0 0 0 0 0 0 0 1D-h2om 1 D-h2om 104 0.870 w 24.36 53.31 12 92 1 286 292 136 640 p p p p D L-D12B-0bw 0.870 w 24.36 53.71 p 0,097 0 0 0 0 0 0 0 0 11 DO C - 2.72 0,61 84 0.390 a 10.92 10.34 0 228 51 0 0 0 0 0 0 0 16B-30ad F 22A-tpm 0.032 a 0.90 1.60 144 0 144 129 230 0 0 0 1.180 a 33.04 0.00 144 24 776 0 48 48 48 43 77 0 0 0 6 c) AED excursion Envelope bsslgain 230 -5 12 a) Infiltration 1712 1287 43 72 b) Room ventilation 290 82 D 13 Internal gains: Occupants 230 0 0 0 0 0 Appliances/other 0 0 0 0 Subtotal (lines 6 to 13) 0 0 Less external load 2002 1369 43 72 Less transfer 0 0 Redistribution 0 0 0 0 14 Subtotal 0 0 0 0 15 Duct loads 16% 33% 2002 326 1369 0 43 0 72 Total room load 458 16% 33% 7 24 Air required (cfm) 2327 1626 5o 86 118 101 3 5 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. •r- wrtgF�tsof't^ 2 t& ...OJECTS ENERGYIA- MANUAL IJSHOMECRETE 2021-Jun-19 12:e - BYERS ruup Calc =RSU0MJ Front Door faces: N Pagage 6 6 Right-J® Worksheet Job: Entire House Date: 6-2020 Lindstrom Air Conditioning BY: LINDSTROM 3581 W MCNAB RO, POMPANO BEACH, FL 33069 Phone: 954-421-4117 Fax: 954-420-0054 Web; www.lindstromaircom 1 Room name MASTER SUITE 2 Exposed wall WIC MASTER EXT 3 Room height 8.0 ft 30.0 ft 4 Room dimensions 10.0 ft heaUcool 10.0 ft heat/cool 5 Room area 48.0 ft' 8.0 x 6.0 ft 15.0 x 20.5 ft Ty Construction U-value Or HTM Area 308.2 ft2 number (Btuh/ft? °F) (Btuhlft� (ft) or perimeter (ft) Load (Btuh) Area or per! mfet r (ft) (Btu) Gross N!P/S Heat Cool Gross N/P/S Heat Cool Heat Cool 6�13A-6ocs 1D-h2om 0.111 n 3.11 1.48 0 0 0 0 1 D-h2om 0.870 n 0.00 0.00 0 0 p 112 0 0 82 255 121 1 D-h2omd 0.870 n 24.36 22.27 0.870 n 24.36 22.27 0 0 0 0 30 0 0 0 7310 0 668 11 13A-6ocs 0.111 a 3.11 1.48 0 p 0 0 0 0 0 1D-h2om 1 D-h2om 0.870 a 24.36 52.63 p 0 0 0 0 0 0 0 0 0 13A boos 0.870 a 24.36 53.71 0.111 p 0 0 0 0 0 0 0 0 0 0 1 D-h2om s 3.11 1.48 0.870 s 24.36 22.27 p 0 0 0 0 0 0 0 0 0 1 D-h2om 1D-h2ob 0.870 s 24.36 22.27 p 0 0 0 0 0 0 0 0 0 p IW 13A-6ocs 0.650 s 0.00 0.00 0.111 w 3.11 0 0 1 D-h2om 1.48 0.870 w 24.36 53.31 64 0 64 199 94 128 98 305 145 1D-h2om 12B-obw 0,870 w 24.36 53.71 p 0 0 0 0 0 0 0 30 0 0 0 11DO 0.097 - 2.72 0.81 0 .390 a 10.92 10.34 0 0 0 0 0 1 0 731 0 1611 0 C F 166-30ad 22A-tpm 0.032 a 0,90 1.60 0 48 0 48 0 43 0 77 0 0 33D p 0 1.180 a 33.04 0.00 48 6 264 0 308 991 493 0 6 c) AED excursion -14 Envelope loss/gain P12 407 506 158 3288 3445 a) Infiltration b) Room ventilation 1788 50 668 188 0 0 13 Internal gains: Occupants tQ 230 0 Appliances/other 0 2 460 0 0 Subtotal (lines 6 to 13) 684 208 3957 4093 Less external load Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 0 0 0 0 15 Duct loads 16% 33% 684 111 208 70 16% 33% 3957 4093 Total room load 644 1368 Air required (cfm) 796 277 S201[�� 4D 15 Calculations a roved bv ACCA to meet all requirements of Manual J 8th Ed. "�- wrigF�tsoft^ qC�p Right-SuiteD Universal 2019 19,0.12 RSU08398 ...OJECTS ENERGYIA- MANUAL JIHOMECRETE 2021-Jun-19 12:33:17 - BYERS.rup Calc = MJ8 Front Door faces: N Page 7 FORM R405-2020 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Business and Professional Regulation - Residential Performance Method Project Name: HOMECRETE - BYERS Street: Builder Name: HOMECRETE 8682 LONESOME PINE TRAIL Permit Office: City, State, Zip: FORT PIERCE, FL, Owner: Permit Number: BYERS RES. Design Location: FL, Fort Pierce Jurisdiction: County: St. Lucie (Florida Climate Zone 2 } 1. New construction or existing New (From Plans) 10. Wall Type$1424.0 sqft.) Insulation Area 2. Single family or multiple family Detached a. Concrete Block - Int Insul, Exterior R=6.5 1264.00 ft2 3. Number of units, if multiple family 1 b. Frame - Wood, Adjacent R=11.0 160.00 ft2 4. Number of Bedrooms 3 c. N/A d. N/A R= ft2 5. Is this a worst case? No 11. Ceiling Types (2002.0 sqft.) R= ft2 Insulation Area 6. Conditioned floor area above grade (ft2) 1852 a. Under Attic (Vented) R=30.0 1852.00 ft2 Conditioned floor area below grade (ft2) 0 b. Knee Wall (Vented) ) R=30.0 150.00 ft2 7. Windows(205.0 sqft.) Description Area c. N/A 12. Ducts R= ft2 R ft2 a. U-Factor: Dbl, U=0.29 141.00 ft2 a. Sup: Attic, Ret: DINING ROOM, AH: DINING RO 6 250 SHGC: SHGC=0.29 b. U-Factor: Dbl, U=0.32 64.00 ft2 SHGC: SHGC=0.26 13. Coolingsystems Efficiency c. U-Factor: N/A ft2 rkBt3.0 a. Central Unit 3.0 SEER:14.00 SHGC: Area Weighted Average Overhang Depth: 6.363 ft. 14. Heating systems kBtu/hr Efficiency Area Weighted Average SHGC: 0.281 a. Electric Heat Pump 33.8 HSPF:8.20 8. Skylights Area c. U-Factor:(AVG) NIA ft2 SHGC(AVG): N/A 15. Hot water systems 9. Floor Types (1852.0 sqft.) Insulation Area a. Electric Cap: 50 gallons a. Slab -On -Grade Edge Insulation R=0.0 1852.00 ft2 b. Conservation features EF: 0.950 b. NIA R_ ft2 None c. N/A R= ft2 16. Credits Pstat Glass/Floor Area: 0.111 Total Proposed Modified Total Baseline Loads: 55.48 PASS Loads: 56.77 I hereby certify that the plans and spe ifications covered by this calculation are in compliance with he Florida Ener Review of the plans and 114E ST 4� R?� Code. gy specifications covered by this 4 calculation indicates compliance PREPARED BY: with the Florida Energy Code. Before fie, DATE: construction is completed c _ this building will be inspected for I hereby certify that ding, as designed, is in compliance compliance with Section 553.908 Florida Statutes. with the Florida E rgy Code.'C,©��'o OWNER/AGENT: DATE: - BUILDING OFFICIAL: DATE: - Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as certified factory -sealed in accordance with R403.3.2.1. - Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an envelope leakage test report with envelope leakage no greater than 7.00 ACH50 (R402,4.1.2). 6/19/2021 12:26 PM EnergyGaugeg USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 6 t-URM R405-2020 INPUT SUMMARY CHECKLIST REPORT PROJECT Title: HOMECRETE - BYERS Bedrooms: 3 Buildin T 9 YPe� User Conditioned Area: 1852 Address Type: Street Address Owner Name: BYERS RES. Total Stories: 1 Lot # # of Units: 1 Block/Subdivision: Builder Name: HOMECRETE Worst Case: No Rotate Angle: 90 PlatBook: Permit Office: Street 8682 LONESOME PIN Jurisdiction: Cross Ventilation: No County: St. Lucie Family Type: Detached Whole House Fan: No City, State, Zip: FORT PIERCE, New/Existing: New (From Plans) FL, Comment: CLIMATE Design Location TMY Site Design Temp Int Design Temp Heating Design Daily Temp 97.5 % 2.5 % Winter Summer Degree Days Moisture Range FL, Fort Pierce FL_VERO_BEACH_MUNI 39 90 70 75 299 62 Low BLOCKS Number Name Area Volume _ 1 Entire House 1852 18520 SPACES Number Name Area Volume Kitchen Occupants Bedrooms InfilID Finished Cooled Heated 1 BED 1 174 1740 No 1 3 1 No Yes Yes 2 BATH 2 60 600 No 0 1 No Yes Yes 3 BED 2 168 1680 No 1 1 No Yes Yes 4 DINING ROOM 301 3010 No 0 1 No 5 GREAT ROOM 225 2250 No 0 1 No Yes Yes Yes Yes 6 NOOK 88 880 No 0 1 No Yes Yes 7 KITCHEN 200 2000 No 0 1 No Yes Yes 8 LAUNDRY 70 700 No 0 1 No Yes Yes 9 MASTER TOILET 26 260 No 0 1 No Yes Yes 10 MASTER BATH 144 1440 No 0 1 No Yes Yes 11 WIC MASTER INT 48 480 No 0 1 No Yes Yes 12 WIC MASTER EXT 48 480 No 0 1 No Yes Yes 13 MASTER SUITE 300 3000 No 2 1 No Yes Yes FLOORS # Floor Type Space Perimeter Perimeter R-Value Area Joist R-Value Tile Wood Carpet 1 Slab -On -Grade Edge Insulatio BED 1 26 ft 0 174 ft' ____ 0 0 1 2 Slab -On -Grade Edge Insulatio BATH 2 6 ft 0 60 fta 1 0 0 3 Slab -On -Grade Edge Insulatio BED 2 26 ft 0 168 ft= ___- 0 0 1 4 Slab -On -Grade Edge Insulatio DINING ROOM 17 ft 0 456 ft2 1 0 0 6/19/2021 12:26 PM EnergyGaugeo USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 2 of 6 =ORM R405-2020 INPUT SUMMARY CHECKLIST REPORT FLOORS # Floor Type Space Perimeter Perimeter R-Value 5 Slab -On -Grade Edge Insulatio GREAT ROOM 14 ft 0 Area 70 ft2 Joist R-Value ---- Tile Wood Carpet 0 0 1 6 Slab -On -Grade Edge Insulatio NOOK 19 ft 0 88 ft2 --- 1 0 0 7 Slab -On -Grade Edge Insulatio KITCHEN 1 ft 0 200 ft2 --- 1 0 0 8 Slab -On -Grade Edge Insulatio LAUNDRY 7 ft 0 70 ft2 ---- 1 0 0 9SIab-On-Grade Edge Insulatio MASTER TOILET 4 ft 0 26 ft2 ---- 1 0 0 10SIab-On-Grade Edge Insulatio MASTER BATH 23.5 ft 0 144 ft2 ---- 1 0 0 11SIab-On-Grade Edge Insulatio WIC MASTER IN 1 ft 0 48 ft2 ---- 0 0 1 12SIab-On-Grade Edge Insulatio WIC MASTER EX 8 ft 0 48 ft2 --- 0 0 1 13SIab-On-Grade Edge Insulatio MASTER SUITE 30 ft 0 300 W ---- 0 0 1 ROOF Roof Gable Roof # Type Materials Area Area Color Rad Barr Solar SA Emitt Absor. Tested Emitt Tested Deck Insul. Pitch (deg) 1 Hip Composition shingles 1952 ft2 0 ft2 Medium N 0.9 No 0.9 No 0 18.4 ATTIC y # 1 Type Full attic Ventilation Vented Vent Ratio (1 in) 150 Area 1852 ft2 RBS N IRCC N CEILING # Ceiling Type Space R Value Ins Type Area Framing Frac Truss 7y 1 Under Attic (Vented) BED 1 30 Blown 174 ft2 0.1 2 Under Attic (Vented) BATH 2 30 Blown 60 ft2 Wood 3 Under Attic (Vented) BED 2 30 Blown 168 ft2 0.1 0.1 Woad 4 Under Attic (Vented) DINING ROOM 30 Blown 456 ft2 0.1 Wood 5 Under Attic (Vented) GREAT ROOM 30 Blown 70 ft2 0.1 Wood 6 Under Attic (Vented) NOOK 30 Blown 88 ft2 Wood 7 Under Attic (Vented) KITCHEN 30 Blown 200 ft2 0.1 Wood 8 Under Attic (Vented) LAUNDRY 30 Blown 0.1 Wood 9 Under Attic (Vented) MASTER TOILET 30 Blown 70 f}2 0.1 Wood 10 Under Attic (Vented) MASTER BATH 30 Blown 26 ft2 144 ft2 0.1 Wood 11 Under Attic (Vented) WIC MASTER IN 30 Blown 48 ft2 0.1 Wood 12 Under Attic (Vented) WIC MASTER EX 30 Blown 48 ft2 0.1 Wood 13 Under Attic (Vented) MASTER SUITE 30 Blown 0.1 Wood 14 Knee Wall (Vented) GREAT ROOM 30 Batt 300 ft2 0.1 Wood 150 ft2 0.1 Wood 6/19/2021 12:26 PM EnergyGauge@ USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 3 of 6 FORM R405-2n2n IAID1 IT CI II ARX w rw r.... ��•��.�.-.�. vnc�►f�L1.7 I RCrum 1 WALLS Adjacent Space Cavity Width Height Sheathing Framing 9 g Solar Below _ 1 N=>E Exterior Concrete Block - Int Insul BED 1 6.5 12 0 8 0 96.0 ft2 0 0 2 E=>S Exterior Concrete Block - Int Insul BED 1 6.5 14 0 8 0 112.0 ft2 0 0 0.5 00 3 N=>E Exterior Concrete Block - Int Insul BATH 2 6.5 6 0 8 0 0.5 0 48.0 ft2 0 0 0.5 0 - 4 N=>E Exterior Concrete Block - Int Insul BED 2 6.5 12 0 8 0 96.0 ft2 0 0 - 5 W=>N Exterior Concrete Block - Int Insul BED 2 6.5 14 0 8 0 112.0 ft2 0 0 0.5 0 _ 6 E=>S Exterior Concrete Block - Int InsDIINING ROO 6.5 17 0 8 0 136.0 ft2 0 0 0.5 0 - 7 W=>N Exterior Concrete Block - Int Ins0REAT ROO 6.5 14 0 8 0 112.0 ft2 0 0 0.5 0 _ 8 N=>E Exterior Concrete Block - Int Insul NOOK 6.5 8 0 8 0 64.0 ft2 0 0 0.5 0 - 9 W=>N Exterior Concrete Block - Int Insul NOOK 6.5 10 0 8 0 80.0 ft2 0 0 0.5 0 _ 10 S=>W Exterior Concrete Block - Int InsUASTER BA 6.5 13 0 8 0 104.0 ft2 0 0 0.5 0 -11 S=>W Exterior Concrete Block - Int InsM/IC MASTE 6.5 8 0 8 0 64.0 ft2 0.5 0 _ 12 S=>W Exterior Concrete Block - Int InsMASTER SUI 6.5 16 0 8 0 128.0 ft2 0 0 0 0 0.5 0 _ 13 W=>N Exterior Concrete Block - Int InsMASTER SUI 6.5 14 0 8 0 112.0 ft2 0 0 0.5 0 _ 14 E=>S Garage Frame - Wood BED 1 11 20 8 160.0 ft2 0.23 0.5 0.75 0 0 DOORS # Ornt Door Type Space Storms U-Value Width Height Area Ft In Ft In 1 E=>S Wood BED 1 None .39 2.8 8 22.4 ft2 2 E=>S Insulated DINING ROO None .46 3 8 24 ft2 WINDOWS Orientation shown is the entered orientation => changed to As Built rotated 90 degrees). / Wall Overhang # Ornt ID Frame Panes NFRC U-Factor SHGC Imp Area Depth Separation Int Shade Screening 1 E=>S 2 Vinyl Double (Tinted) Yes 0.29 0.29 N 15.0 ft2 1 ft 6 in 1 ft0 in None None 2 N=>E 3 Vinyl Double (Tinted) Yes 0.29 0.29 N 9.0 ft2 1 ft 6 in 1 ft 0 in None None 3 N=>E 4 Vinyl Double (Tinted) Yes 0.29 0.29 N 15.0 ft2 1 ft 6 in 1 ft 0 in None None 4 E=>S 6 Vinyl Double (Tinted) Yes 0.29 0.29 N 30.0 ft2 7 ft 0 in 1 ft 0 in None None 5 W=>N 7 Vinyl Double (Tinted) Yes 0.32 0.26 N 64.0 ft2 14 ft 6 in 1 ft 0 in None None 6 S=>W 10 Vinyl Double (Tinted) Yes 0.29 0.29 N 12.0 ft2 1 ft 6 in 1 ft 0 in None None 7 S=>W 12 Vinyl Double (Tinted) Yes 0.29 0.29 N 30.0 ft2 1 ft 6 in 1 ft 0 in None None 8 W=>N 13 Vinyl Double (Tinted) Yes 0.29 0.29 N 30.0 ft2 1 ft 6 in 1 ft 0 in None None GARAGE # Floor Area Ceiling Area Exposed Wall Perimeter Avg. Wall Height Exposed Wall Insulation 1 469 ft2 469 ft2 64 ft 8 ft 1 6/19/2021 12:26 PM EnergyGaugee USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 4 of 6 =ORM R405-2020 INPUT SUMMARY CHECKLIST REPORT INFILTRATION # Scope 1 Wholehouse Method Proposed ACH(50) SLA CFM 50 ELA EgLA ACH .000444 2160.7 118.54 222.55 .1381 ACH 50 7 HEATING SYSTEM # 1 System Type Electric Heat Pump/ Subtype Speed Efficiency Capacity acit Y None Singl HSPF:8.2 33.8 kBtu/hr Block Ducts 1 sys#1 COOLING SYSTEM # 1 System Type Central UniV Subtype Subtype Efficiency Capacity Air Flow None Singl SEER: 14 33 kBtu/hr 990 cfm SHR Block Ducts 0.75 1 Sys#1 —# HOT WATER SYSTEM __System 1 Type SubType Location EF Cap Use SetPnt Electric None Garage 0.95 50 gal 60.9 gal 120 deg Conservation None SOLAR HOT WATER SYSTEM FSEC Cert # None Company Name None Collector System Model # Collector Model # Area Storage Volume FEF ft2 DUCTS / ---- Supply --- V # Location R-Value Area ---- Return ---- Location Area Leakage Type Air CFM 25 CFM25 HVAC # Handler TOT OUT ON RLF Heat Cool 1 Attic 6 250 ft2 DINING ROO 1 ft2 Default Leakage DINING RO (Default) (Default) 1 1 TEMPERATURES Programable Thermostat: Y Ceiling Fans: Cooling Heating Venting (] Jan [(XI] Jan Jan [ Feb [[ Feb Feb [ j Mar EXJ] Mar f Apr [ j May [X] Jun [X] Jul Apr May Jun Jul [X] Aug Aug Sep JXJ Sep Oct Oct Nov Dec X Mar [(X Apr [( l] May E 11 Jun [[ ]1 Jul I[ 11 Aug Sep �X� Oct ki Nov Dec Nov Dec 6/19/2021 12:26 PM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 5 of 6 FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT Thermostat Schedule: HERS 2006 Reference Schedule Type 1 2 3 4 Hours 5 6 7 8 9 10 11 12 Cooling (WD) AM PM 78 80 78 80 78 78 78 78 78 78 78 78 80 80 80 80 Cooling (WEH) AM 78 78 78 78 78 78 78 78 78 78 78 78 78 78 PM 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 Heating (WD) AAM 6666 66 66 666 66 68 68 68 68 68 68 68 68 Heating (WEH) AM 66 66 66 66 66 68 68 68 68 68 68 68 68 66 66 PM 68 68 68 68 68 68 68 68 68 68 68 68 68 66 68 66 MASS Mass Type Area Thickness Furniture Fraction Space Default(8 Ibslsq.ft. 0 ft2 0 ft 0.3 BED 3 Default(8 Ibs/sq.ft, ft2 ft 0.3 Default(8 Ibs/sq.ft. ft2 LAUNDRY Default(8 Ibslsq.ft. ft 0.3 DINING KITCHEN Defautt(8 Ibs/sq.ft, ft2 ft2 ft 0.3 BATH TUB Default(8 Ibs/sq.ft. ft2 ft 0.3 BATH SINK Default(8 Ibs/sq.ft, ft2 ft 0.3 BED 2 Default(8 Ibs/sq.ft, ft2 ft 0.3 GREAT ROOM Default(8 Ibs/sq.ft. ft2 ft 0.3 GRT RM HALF Default(8 Ibs/sq.ft. ft2 ft 0.3 MASTER SUITE Default(8 Ibs/sq.ft, ft2 ft 0.3 MASTER WIC Default(8 lbs/sq.ft. ft2 ft 0.3 MASTER BATH _ft 0.3 MASTER Tlrli FT 6/19/2021 12:26 PM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 6 of 6 FORM R405-2020 ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX* = 98 The lower the EnergyPerformance Index, the more efficient the home. 8682 LONESOME PINE TRAIL, FORT PIERCE, FL, 1. New construction or existing 2. Single family or multiple family 3. Number of units, if multiple family 4. Number of Bedrooms 5. Is this a worst case? 6. Conditioned floor area (ft2) 7. Windows- Description a. U-Factor: Dbl, U=0.29 SHGC: SHGC=0.29 b. U-Factor: Dbl, U=0.32 SHGC: SHGC=0.26 C. U-Factor: N/A SHGC: d. U-Factor: N/A SHGC: Area Weighted Average Overhang Depth Area Weighted Average SHGC: 8. Skylights Description a. U-Factor(AVG).. N/A SHGC(AVG): N/A 9. Floor Types a. Slab -On -Grade Edge Insulation b. N/A c. N/A New (From Plans) 10. Wall Type and Insulation Insulation Area Detached a. Concrete Block - Int Insul, Exterior R=6.5 1264.00 ft2 1 b. Frame - Wood, Adjacent R=11.0 160.00 ft2 c. NIA R= ft2 3 d. N/A R= ft2 No 11. Ceiling Type and insulation level Insulation Area 1852 a. Under Attic (Vented) R=30.0 1852.00 ft2 b. Knee Wall (Vented) R=30.0 150.00 ftZ Area c. N/A R= ft2 141.00 ft2 12. Ducts, location & insulation level R ft2 a. Sup: Attic, Ret: DINING ROOM, AH: DINING RO 6 250 64.00 ft2 13. Cooling systems kBtu/hr Efficiency ft2 a. Central Unit 33.0 SEER:14.00 ft2 14. Heating systems kBtu/hr Efficiency 6.363 ft. a. Electric Heat Pump 33.8 HSPF:8.20 0.281 Area 15. Hot water systems ft2 a. Electric Cap: 50 gallons EF: 0.95 Insulation Area b. Conservation features R=0.0 1852.00 ft2 None R= ft2 Credits (Performance method) th Pstat R= ft2 I certify that this home has complied with the Florida Energy Efficiency Code for Building Construction through the above energy saving features which will be installed (or exceeded) in this home before final inspection. Otherwise, a new EPL Display Card will be completed based on install o e c pliant f s Builder Signature: Date: Address of New Home: gLg?-, La City/FL Zip: *Note: This is not a Building Energy Rating. If your Index is below 70, your home may qualify for energy efficient mortgage (EEM) incentives if you obtain a Florida Energy Rating. For information about the Florida Building Code, Energy Conservation, contact the Florida Building Commission's support staff. **Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT. 6/19/2021 12:26 PM EnergyG2uge(8) USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 1