Loading...
HomeMy WebLinkAboutCreekside Lot 39-Driveway.pdfUNIVERSAL® /i�/_�3g a ENGINEERING SCIENCES �w^'� tp", 3 INSPECTION RESULTS Inspection Date: �' `'IJ "a 1 Project: QT-6P-I \S 1 d` Address: 3 3 Th L N )? V 1� Lt Check one: Permit No. dO)I f ¢! ejw Regular Inspection: I �\ ElReinspection Date of Initial Inspection: lD 3y r Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Cod,,,���e::90 ! — rl ),0 s /l P (, -4 Z k5 Inspection Results: Approved ❑ AE-Approved with Exceptions DP -Disapproved ❑ Not Ready 1. 2. 3. 4. 5. 6. 7. Inspector's Name: 'lrQn�� 1A4AJM Lic.#: OFFICES THROUGHOUT FLORIDA ❑ DA-Disallowed 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com