Loading...
HomeMy WebLinkAboutCreekside Lot 40-Driveway.pdfUNIVERSAL® ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: l -y_- 1rr) Project: _ Address: N 11 Check one: Regular Inspection: GGGGGG❑��`��`Re i ns pect io n Permit No Wr Date of Initial Inspection: - 36) - Q I Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING CAL Footing Underground Underground h-In Slab Floor Rough -In Rough -In ing & Test Masonry Wall Rough -In Stack Piping & Test & Test WInsulation Wall/Ceiling Ceiling Rough -In Water Piping & Test g & Test Framing Panel/Feeder Gas Piping &Test g &TestStructural Service/Ground Storm Piping & Test Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: / y Area Inspected/Code: 90t 1 Dr I Uri 4�➢ A U l� i h D O r � Inspection Results: Npproved ❑ AE-Approved with Exceptions ElDA-Disallowed isapproved ❑ Not Ready 1. 2. 4. 5. 6. 7. Inspector's Name: Lic.#: 6 k `I � �J I j OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com