HomeMy WebLinkAboutNOANOA No. 20-0528.04
Expiration Date: October 26, 2023
Approval Date: November 12, 2020
Page 1
MIAMI-DADE COUNTY
PRODUCT CONTROL SECTION
DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) 11805 SW 26 Street, Room 208
BOARD AND CODE ADMINISTRATION DIVISION T (786) 315-2590 F (786) 315-2599 NOTICE OF ACCEPTANCE (NOA) www.miamidade.gov/economy
CGI Windows and Doors, Inc.
3780 w. 103rd St.
Miami, Fl. . 33018
SCOPE:
This NOA is being issued under the applicable rules and regulations governing the use of construction
materials. The documentation submitted has been reviewed and accepted by Miami-Dade County RER -
Product Control Section to be used in Miami-Dade County and other areas where allowed by the Authority
Having Jurisdiction (AHJ).
This NOA shall not be valid after the expiration date stated below. The Miami-Dade County Product Control
Section (In Miami-Dade County) and/or the AHJ (in areas other than Miami-Dade County) reserve the right
to have this product or material tested for quality assurance purposes. If this product or material fails to
perform in the accepted manner, the manufacturer will incur the expense of such testing and the AHJ may
immediately revoke, modify, or suspend the use of such product or material within their jurisdiction. RER
reserves the right to revoke this acceptance, if it is determined by Miami-Dade County Product Control
Section that this product or material fails to meet the requirements of the applicable building code.
This product is approved as described herein and has been designed to comply with the Florida Building
Code, including the High Velocity Hurricane Zone.
DESCRIPTION: Series “238” Outswing Aluminum Casement Window - L.M.I.
APPROVAL DOCUMENT: Drawing No. CA238NOA1 Rev A (former W98-100 Rev K), titled “Series-
238 Aluminum Casement Window (L.M.I.)”, sheets 1 through 9 of 9 dated 05-22-20, prepared by
manufacturer, signed and sealed by Lynn Miller, P.E., bearing the Miami-Dade County Product Control
Revision stamp with the Notice of Acceptance number and expiration date by the Miami-Dade County
Product Control Section.
MISSILE IMPACT RATING: Large and Small Missile Impact Resistant
LABELING: Each unit shall bear a permanent label with the manufacturer's name or logo, city, state,
model/series, and following statement: "Miami-Dade County Product Control Approved", unless otherwise
noted herein.
RENEWAL of this NOA shall be considered after a renewal application has been filed and there has been
no change in the applicable building code negatively affecting the performance of this product.
TERMINATION of this NOA will occur after the expiration date or if there has been a revision or change
in the materials, use, and/or manufacture of the product or process. Misuse of this NOA as an endorsement
of any product, for sales, advertising or any other purposes shall automatically terminate this NOA. Failure
to comply with any section of this NOA shall be cause for termination and removal of NOA.
ADVERTISEMENT: The NOA number preceded by the words Miami-Dade County, Florida, and
followed by the expiration date may be displayed in advertising literature. If any portion of the NOA is
displayed, then it shall be done in its entirety.
INSPECTION: A copy of this entire NOA shall be provided to the user by the manufacturer or its
distributors and shall be available for inspection at the job site at the request of the Building Official.
his NOA revises NOA No. 17-0918.11 and consists of this page 1 and evidence pages E-1, E-2, E-3, E-4, E-5
and E-6, as well as approval document mentioned above.
The submitted documentation was reviewed by Ishaq I. Chanda, P.E.
Ishaq I. Chanda, P.E.
Product Control Unit Supervisor
NOA No. 20-0528.04
Expiration Date: October 26, 2023
Approval Date: November 12, 2020
E – 1
CGI Windows and Doors, Inc.
NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
1. EVIDENCE SUBMITTED UNDER PREVIOUS NOA’s
A. DRAWINGS
1.Manufacturer's die drawings and sections.
2.Drawing No. W98-100, titled “Series-238 Alum Outswing Casement Wdw. (L.M.I.)”,
sheets 1, 1.1, 2, 3, 4, 5, 5.1, 6 and 7 of 7, dated 12/04/98, with revision J dated
04/10/15, prepared by Al-Farooq Corporation, signed and sealed by Javad Ahmad,
P.E.
B. TESTS
1.Test reports on 1) Uniform Static Air Pressure Test, Loading per FBC TAS 202-94
2) Large Missile Impact Test per FBC, TAS 201-94
3) Cyclic Wind Pressure Loading per FBC, TAS 203-94
along with marked-up drawings and installation diagram of a series 7500 PVC fixed
window, to qualify DuPont “Butacite” PVB interlayer, Duraseal® and Super Spacer®
insulating glass spacer, prepared by Certified Test Laboratories, Test Report No.
CTLA–3056 WA, dated 03/03/15, signed and sealed by Ramesh C. Patel, P.E.
2.Test reports on: 1) Uniform Static Air Pressure Test, Loading per FBC TAS 202-94
2) Large Missile Impact Test per FBC, TAS 201-94
3) Cyclic Wind Pressure Loading per FBC, TAS 203-94
along with marked-up drawings and installation diagram of a series 7400 PVC project
out window, to qualify DuPont “Butacite” PVB interlayer, Duraseal® and Super
Spacer® insulating glass spacer, prepared by Certified Test Laboratories, Test Report
No. CTLA–3056 WB, dated 03/03/15, signed and sealed by Ramesh C. Patel, P.E.
3.Test reports on: 1) Uniform Static Air Pressure Test, Loading per FBC TAS 202-94
2) Large Missile Impact Test per FBC, TAS 201-94
3) Cyclic Wind Pressure Loading per FBC, TAS 203-94
along with marked-up drawings and installation diagram of a series 238 aluminum
fixed window, to qualify DuPont “Butacite” PVB interlayer, Duraseal® and Super
Spacer® insulating glass spacer, prepared by Certified Test Laboratories, Test Report
No. CTLA–3056 WC, dated 04/16/15, signed and sealed by Ramesh C. Patel, P.E.
4.Test reports on: 1) Air Infiltration Test, per FBC, TAS 202-94
2) Uniform Static Air Pressure Test, Loading per FBC, TAS 202-94
3) Water Resistance Test, per FBC, TAS 202-94
4) Large Missile Impact Test per FBC, TAS 201-94
5) Cyclic Wind Pressure Loading per FBC, TAS 203-94
6) Forced Entry Test, per FBC 2411.3.2.1, and TAS 202-94
along with marked–up drawings and installation diagram of a series 318 outswing
aluminum casement window, prepared by Certified Testing Laboratories, Test Report
No. CTL-3009WB, dated 03/24/14, signed and sealed by Ramesh C. Patel, P.E.
(Submitted under NOA # 14-0506.01)
Ishaq I. Chanda, P.E.
Product Control Unit Supervisor
NOA No. 20-0528.04
Expiration Date: October 26, 2023
Approval Date: November 12, 2020
E – 2
CGI Windows and Doors, Inc.
NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
B. TESTS (CONTINUED)
5.Test reports on: 1) Air Infiltration Test, per FBC, TAS 202-94
2) Uniform Static Air Pressure Test, Loading per FBC, TAS 202-94
3) Water Resistance Test, per FBC, TAS 202-94
4) Large Missile Impact Test per FBC, TAS 201-94
5) Cyclic Wind Pressure Loading per FBC, TAS 203-94
6) Forced Entry Test, per FBC 2411.3.2.1, and TAS 202-94
along with marked–up drawings and installation diagram of an aluminum casement
window, prepared by American Test Lab of South Florida, Inc., Test Report No.
ATLSF-1109.01-12, dated 11/20/12, signed and sealed by Henry Hattem, P.E.
(Submitted under NOA # 12-1220.14)
6.Test reports on: 1) Air Infiltration Test, per FBC, TAS 202-94
2) Uniform Static Air Pressure Test, Loading per FBC, TAS 202-94
3) Water Resistance Test, per FBC, TAS 202-94
4) Forced Entry Test, per FBC 2411.3.2.1, and TAS 202-94
along with marked–up drawings and installation diagram of an aluminum casement
window, prepared by Hurricane Testing Lab., Inc., Test Reports No. HTL-0080-
0301–07 for specimen A and B, and HTL-0080-0905-07 for specimen B and C, dated
09/21/07 and 10/12/06, both signed and sealed by Vinu J. Abraham, P.E.
(Submitted under NOA # 08-1010.02)
along with marked-up drawings and installation diagram of an aluminum casement
window, prepared by Fenestration Testing Laboratory, Inc., Test Reports No. FTL-
1003 and FTL-1041, dated 10/14/94, both signed and sealed by Yamil Kuri, P.E.
(Submitted under NOA # 96-0417.03)
7.Test reports on: 1) Large Missile Impact Test per FBC, TAS 201-94
2) Cyclic Wind Pressure Loading per FBC, TAS 203-94
along with marked-up drawings and installation diagram of an aluminum outswing
casement window, prepared by Hurricane Engineering & Testing, Inc., Test Reports
No. HETI-08-2143, HETI-08-2144, HETI-08-4287 and HETI-07-4298, dated
06/27/08 and 07/17/08, all signed and sealed by Candido F. Font, P.E
(Submitted under NOA # 08-1010.02)
8.Test reports on: 1) Large Missile Impact Test per FBC, TAS 201-94
2) Cyclic Wind Pressure Loading per FBC, TAS 203-94
along with marked-up drawings and installation diagram of an aluminum casement
window, prepared by Hurricane Test Laboratory, Inc., Test Reports No.
HTL-0080-0303-96 and HTL-0080-1107-98, dated 03/06/96 and 11/10/98, both
signed and sealed by Timothy S. Marshall, P.E.
(Submitted under NOA’s # 96-0417.03 and # 01-1002.03)
Ishaq I. Chanda, P.E.
Product Control Unit Supervisor
NOA No. 20-0528.04
Expiration Date: October 26, 2023
Approval Date: November 12, 2020
E –3
CGI Windows and Doors, Inc.
NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
C. CALCULATIONS
1.Anchor verification calculations and structural analysis, complying with FBC-2010,
dated 4/24/14, prepared by Al-Farooq Corporation, signed and sealed by Javad
Ahmad, P.E. (Submitted under NOA # 14-0506.01)
2.Glazing complies with ASTM E1300-09
D. QUALITY ASSURANCE
1.Miami-Dade Department of Regulatory and Economic Resources (RER)
E.MATERIAL CERTIFICATIONS
1.Notice of Acceptance No. 14-0916.11 issued to Kuraray America, Inc. for their
“SentryGlas® (Clear and White) Glass Interlayers” dated 06/25/15, expiring on
07/04/18.
2.Notice of Acceptance No. 14-0916.10 issued to Kuraray America, Inc. for their
“Butacite® PVB Glass Interlayer” dated 04/25/15, expiring on 12/11/16.
3.Notice of Acceptance No. 14-0423.15 issued to Eastman Chemical Company (MA)
for their “Saflex CP - Saflex and Saflex HP Composite Glass Interlayers with PET
Core” dated 06/19/14, expiring on 12/11/18.
4.Notice of Acceptance No. 14-0423.17 issued to Eastman Chemical Company (MA)
for their “Saflex Clear and Color Glass Interlayers” dated 06/19/14, expiring on
05/21/16.
F.STATEMENTS
1.Statement letter of conformance, complying with FBC- 5th Edition (2014), dated April
11, 2014, issued by Al-Farooq Corporation, signed and sealed by Javad Ahmad, P.E.
(Submitted under previous NOA # 14-0506.01)
2.Proposal No. 13-1098 issued by the Product Control Section, dated October 02, 2013
and revised on February 24, 2014, signed by Manuel Perez, P.E.
(Submitted under previous NOA # 14-0506.01)
3.Laboratory compliance letters for Test Reports No. HTL-0080-0301-07 for specimen
A and B and HTL-0080-0905-07 for specimen B and C, issued by Hurricane Test
Laboratory, Inc., dated 09/21/07 and 10/12/06, both signed and sealed by Vinu J.
Abraham, P.E.
(Submitted under NOA # 08-1010.02)
4.Laboratory compliances letters for Test Reports No. HETI-08-2143,
HETI–08–2144, HETI-08-4287 and HETI-07-4298, issued by Hurricane
Engineering & Testing, Inc., dated 06/27/08 and 07/17/08, all signed and sealed by
Candido F. Font, P.E.
(Submitted under NOA # 08-1010.02)
5.Laboratory compliance letters for Test Reports No. HTL-0080-0303-96 and
HTL-0080-1107-98, issued by Hurricane Test Laboratory, Inc., dated 03/06/96 and
11/10/98, both signed and sealed by Timothy S. Marshall, P.E.
(Submitted under NOA # 96-0417.03 and 01-1002.03)
Ishaq I. Chanda, P.E.
Product Control Unit Supervisor
NOA No. 20-0528.04
Expiration Date: October 26, 2023
Approval Date: November 12, 2020 E- 4
CGI Windows and Doors, Inc.
NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
6.Laboratory compliance letters for Test Reports No. FTL-1003 and FTL-1041, issued
by Fenestration Testing Laboratory, Inc., dated 10/14/94, both signed and sealed by
Yamil Kuri, P.E.
(Submitted under NOA # 96-0417.03)
7.Test Proposal for the qualification of Butacite® PVB glass interlayer by Kuraray
America, Inc., as well as Duraseal® and Super Spacer® Standard warm-edge
flexible insulating glass spacers, dated December 16, 2014, issued by RER, Product
Control Section, signed by Jaime Gascon, P.E., Supervisor, Product Control Section.
G. OTHERS
1.Notice of Acceptance No. 14-0506.01, issued to CGI Windows & Doors, Inc. for their
Series “238” Outswing Aluminum Casement Window - L.M.I., approved on 06/26/14
and expiring on 10/26/18.
2. EVIDENCE SUBMITTED In PREVIOS SUBMITTAL
A. DRAWINGS
1.Drawing No. W98-100, titled “Series-238 Alum Outswing Casement Wdw. (L.M.I.)”,
sheets 1, 1.1, 2, 3, 4, 5, 5.1, 6 and 7 of 7, dated 12/04/98, with revision K dated
08/30/17, prepared by Al-Farooq Corporation, signed and sealed by Javad Ahmad,
P.E.
B. TESTS
1.None.
C. CALCULATIONS
1.None.
D. QUALITY ASSURANCE
1.Miami-Dade Department of Regulatory and Economic Resources (RER)
E.MATERIAL CERTIFICATIONS
1.Notice of Acceptance No. 14-0916.11 issued to Kuraray America, Inc. for their
“SentryGlas® (Clear and White) Glass Interlayers” dated 06/25/15, expiring on
07/04/18.
2.Notice of Acceptance No. 16–1117.01 issued to Kuraray America, Inc. for their
“Trosifol Ultraclear, Clear and Color PVB Interlayers” dated 01/19/17, expiring
on 07/08/19.
3.Notice of Acceptance No. 17-0712.03 issued to Eastman Chemical Company (MA)
for their “Saflex CP – Saflex and Saflex HP Composite Glass Interlayers with
PET Core” dated 09/07/17, expiring on 12/11/18.
4.Notice of Acceptance No. 17-0712.05 issued to Eastman Chemical Company (MA)
for their “Saflex Clear and Color Glass Interlayers” dated 09/07/17, expiring on
05/21/21.
Ishaq I. Chanda, P.E.
Product Control Unit Supervisor
NOA No. 20-0528.04
Expiration Date: October 26, 2023
Approval Date: November 12, 2020
E – 5
CGI Windows and Doors, Inc.
NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
F.STATEMENTS
1.Statement letter of conformance, of complying with FBC 5th Edition (2014), with
FBC 6th Edition (2017) and of no financial interest, dated August 30, 2017, issued by
Al-Farooq Corporation, signed and sealed by Javad Ahmad, P.E.
G. OTHERS
1.Notice of Acceptance No. 15-0512.19, issued to CGI Windows and Doors, Inc. for
their Series “238” Outswing Aluminum Casement Window - L.M.I., approved on
09/17/15 and expiring on 10/26/18.
3 New Evidence submitted
A.DRAWINGS
1.Drawing No. CA238NOA1 Rev A (former W98-100 Rev K), titled “Series-238 Aluminum
Casement Window (L.M.I.)”, sheets 1 through 9 of 9 dated 05-22-20, prepared by manufacturer,
signed and sealed by Lynn Miller, P.E.
B. TESTS
1.Test reports on: 1) Air Infiltration Test, per FBC, TAS 202-94
2) Uniform Static Air Pressure Test, Loading per FBC, TAS 202-94
3) Water Resistance Test, per FBC, TAS 202-94
4)Large Missile Impact Test per FBC, TAS 201-94
5) Cyclic Wind Pressure Loading per FBC, TAS 203-94
along with marked-up drawings and installation diagram of all CGI Windows and Doors, Inc.
and PGT Industries, Inc., representative units listed below and tested to qualify Dowsil 791
and Dowsil 983 silicones, per Proposal #19-1155TP, prepared by Fenestration Testing
Laboratory, Inc., Test Reports No.:
CGI Windows and Doors Inc. test specimens:
FTL-20-2108.1, CGI SH360 Aluminum Single Hung Window (unit 1 in proposal) FTL-20-
2108.2, CGI CA238 Alum. Outswing Casement Window (unit 2 in proposal) FTL-20-2108.3,
CGI SGD560 Aluminum Sliding Glass Door (unit 3 in proposal) FTL-20-2108.4, CGI
PW410 Aluminum Fixed Window (unit 4 in proposal) and FTL-20-2108.5, CGI SH360
Aluminum Single Hung Window (unit 5 in proposal)all dated 08/24/20 and signed and sealed
by Idalmis Ortega, P.E.
PGT Industries, Inc. test specimens:
FTL-7897, PGT PW5520 PVC Fixed Window (unit 6 in proposal), dated 09/03/14
FTL-20-2107.1, PGT SGD780 Aluminum Sliding Glass Door (unit 7 in proposal) FTL-20-
2107.2, PGT CA740 Alum. Outswing Casement Window (unit 8 in proposal) FTL-20-
2107.3, PGT PW7620A Aluminum Fixed Window (unit 9 in proposal) and FTL-20-2107.4,
PGT PW7620A Aluminum Fixed Window (unit 10 in proposal) all dated 07/13/20 and
signed and sealed by Idalmis Ortega, P.E.
Ishaq I. Chanda, P.E.
Product Control Unit Supervisor
NOA No. 20-0528.04
Expiration Date: October 26, 2023
Approval Date: November 12, 2020
E –6
CGI Windows & Doors, Inc.
NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
C. CALCULATIONS
1. Anchor verification calculations and structural analysis, complying with FBC 7th
Edition (2020), dated 05/22/20, prepared by manufacturer, signed and sealed by
Anthony Lynn Miller, P.E.
2.Glazing complies with ASTM E1300-04, -09, -12 and -16.
D.QUALITY ASSURANCE
1.Miami Dade Department of Regulatory and Economic Resources (RER).
E.MATERIAL CERTIFICATIONS
1.Notice of Acceptance No. 17-0808.02 issued to Kuraray America, Inc. for their
“SentryGlas® (Clear and White) Glass Interlayers”, expiring on 07/04/23.
F.STATEMENTS
1.Statement letters of conformance to FBC 2020(7th Edition), dated 04/20/20, prepared,
signed & sealed by Lynn Miller, P. E.
2.Notification of Successor Engineer per the Florida Administrative Code Section 61G15-
27.001, notifying original engineer that the successor engineer is assuming full
professional and legal responsibility for all engineering documents pertaining to this
NOA, dated 06/12/20, signed and sealed by A. Lynn Miller, P.E
G. OTHER
1.This NOA revises NOA #17-0918.11 and updates to FBC 2020, expiring 10/26/23.
2.RER Test proposals #19-1155 dated 01/10/20 approved by Ishaq I. Chanda, P.E.