HomeMy WebLinkAboutKSM Soil Compaction ReportHeadquarters
11345 U.S. Highway 1
Sebastian, FL. 32958
Orlando
723 Progress Way
Sanford, FL. 32771
Mailing
PO Box 78-1377
Sebastian, FL. 32978
Phone: 772-589-0712
C.A.# 5693
KSMengineering.net
KSM JOB #:214918-1d/BS/bm
NUC #528
Nuc Model:MC-1DR-P
Nuc Serial #:MD049528
4 Violetta Lane
Spanish Lakes Riverfront
Port St Lucie, Florida
Compacted Foundation Fill
DEPTH PEN
READ
DRY
DENSITY
MAX. DRY
PROCTOR VALUE (P.C.F)
PERCENT
COMPACTION
1 N.E.0" - 12"45 105.1 108.0 97.3%
2 S.E."40 104.7 "96.9%
3 Center "40 105.0 "97.2%
4 S.W."45 105.5 "97.7%
5 S.E."50 106.0 "98.1%
Proctor Optimum Moisture:
Proctor Max. Dry Density: P.C.F.
@ Test Locations the Density &
Penetrometer readings indicate the
Degree of Compaction Meets
7/1/2021
Certified Women Owned Business - WBE
Minimum Requirement
for Unstaked Foundation
In Place Moisture:
SOIL COMPACTION REPORT
ASTM D 1557 and ASTM D 6938
June 30, 2021DATE TESTED:
8.5%
12.0%
Dark Brown Sand
Geotechnical Engineering - Construction Materials Testing - Special Inspections - Civil and Structural Consulting
Respectfully Submitted:
ITEM TESTED:
108.0
TEST LOCATION
OF SAMPLE
Proudly Serving Florida since 1990
Disclaimer:Contractor is responsible to maintain the tested area
in the condition that KSM completed the indicated passed
compaction test.KSM is not responsible if the tested area has
been altered from the approved inspected condition.
PERMIT #:
CONTRACTOR:Wynne Development
21050015
Bryan E. Dahlke, P.E. V.P. of Engineering
Soil Description:
JOB LOCATION:
Email to: dotty@wynnebc.com
PE # 81439
Test report shall not be reproduced, except in full, without the written approval of KSM Engineering & Testing
103.0
104.0
105.0
106.0
107.0
108.0
109.0
7 8 9 10 11 12 13 14 15
W
E
I
G
H
T
P
.
C
.
F
.
D
R
Y
Moisture -% of Dry Weight