Loading...
HomeMy WebLinkAboutPROPOSAL856 US Highway 1 Vero Beach, FL 32960 License CCC 1329687 Paradise Association Mgmt Deborah Lyon Project Address: 206 River Walk Proposal Date 4/22/2021 Estimate # Rep 11595 DAI. rch*ld Island Roofing Scope of Work Shingle re -roof Remove existing roof system, including all flashing, and counterflashing on the house at 206 River Walk and dispose of the same. We are assuming that there is one layer of shingles, and one layer of 30# felt paper to remove. If the roof is different from this, additional charges to remove the additional material will be added. Nail off plywood to existing code. If there is any rotted plywood it will be replaced at ($110.00 per sheet) Any other needed repairs on the SOFFIT, FASCIA and SUB -FASCIA will be made at $65 per hour/ per man plus material cost. Materials removed may be recycled with the proceeds going to Orchid Island Roofing. This rebate is figured into the total cost of the job. All materials will be installed per Florida Building Code Install materials listed below UNDERLAYMENT Wip Grip peel & stick underlayment FLASHING Drip edge (painted steel) Wall flashing (galvalume) Step flashing (galvalume) Headwall flashing with hem (galvalume) Valley metal roll (galvalume) When replacing the wall flashings, and installing the new step flashing along the wall, every attempt will be made to re -use the existing siding. Generally if the siding is in good condition this will be possible. If the siding is not able to be saved, we will replace at the same rate as rotted wood. Stucco stop (galvalume) Stucco anywhere flashings have been removed SHINGLE ROOF SYSTEM Starter shingles Owens Corning Shingles "Oakridge" OR proposes to furnish labor and materials for the above specs for the sum of.- G�tT7Fj�,_ Date of acceptance '4 "6 Signature Payment: 30%deposit, 50% when underlayment is installed, balance when job is complete. Acceptance of proposal, and the terms on the reverse side are hereby accepted. OR LLC is authorized to do the work specified. Prices good for 15 days from date of proposal. (772)643-5950 Page 1 orchidislandroofing.com 856 US Highway 1 Vero Beach, FL 32960 License CCC1329687 Paradise Association Mgmt Deborah Lyon Project Address: 206 River Walk Owens Corning Ridgecap "Supreme" Lead Boots Galvalume gooseneck vents Lomanco Omni Roll Ridge Vent 8D Ringshank 2 1/2" Coil Nails Coil Nails Modified Bitumen roof cement Proposal Date 4/22/2021 Estimate # Rep 11595 DAL rch*ld Island Roofing Scope of Work (2' x 4') Sun-Tek ICMG II 2549 Skylight Lens, Flat Impact Glass Curb Mount (2' x 2') Sun-Tek ICMG II 2525 Skylight Lens, Flat Impact Glass Curb Mount Shingle re -roof Solar Powered Attic Breeze Attic Fan (AB 2042A 1400 CFM) Dump fees Orchid Island Roofing will purchase all required permits GUTTERS: Orchid Island Roofing will make every attempt to save and reuse the existing gutters. During the re -roof process, the gutter spikes need to be removed, and then re -installed. This can sometimes cause corner joints to open and drip, also some gutters may have an incorrect pitch currently, and this will make that worse. We will reinstall the gutters in the same place they currently are, and we are not responsible for any gutter leaks, scratches, or dents when the project is completed. In fact, this is a probability more than a possibility. This is why we recommend replacement at the time of re -roofing. Orchid Island Roofing warranties that this shingle roof will not leak for 5 years, under normal conditions. Orchid Island Roofing will repair any leak in this time period. Any hurricane force winds void this warranty. Please note, although great care will be taken to protect all plants, and grass from any damage, some minor damage may occur. Grass, in the path around the house will be walked on multiple times daily. While this will cause some stress to the grass, OIR can not be responsible for replacing any sod. Plants around the house will be covered by a tarp during the removal process, and the weight of this may cause some damage to foliage. Because we take great care to avoid this, OIR will not be responsible for damaged plants. OR proposes to furnish labor and materials for the above specs for the sum of.- G�tT7Fj� Date of acceptance 7 ' %b 2 I Signature V` �O Payment: 30% deposit, 50% when underlayment is installed, balance when job is complete. C.%�t Acceptance of proposal, and the terms on the reverse side are hereby accepted. OIR LLC is authorized to do the work specified. Prices good for 15 days from date of proposal. (772)643-5950 Page 2 orchid island roofing. com 856 US Highway 1 Vero Beach, FL 32960 License CCC1329687 Paradise Association Mgmt Deborah Lyon Project Address: 206 River Walk Scope of Work Proposal Date Estimate # Rep 4/22/2021 11595 D I rchid Island )of *in2 Shingle re -roof O/R proposes to furnish labor and materials for the above specs for the sum of $16,984.39 ZeT1fZ� Date of acceptance Signature '- � 1L Payment: 30%deposit, 50% when underlayment is �nstalled �ialaTice when tob is complete. c+ Acceptance of proposal, and the terms on the reverse side are hereby accepted.OlR LLC is authorized to do the work specified. Prices good for 15 days from date of proposal. (772)643-5950 Page 3 orchid island roofing. com