HomeMy WebLinkAboutPROPOSAL856 US Highway 1
Vero Beach, FL 32960
License CCC1329687
Paradise Association Mgmt
Deborah Lyon
Project Address:
Proposal
Date
4/26/2021
Estimate # Rep
11602 DAL
rchid Island
Roofing
Scope of Work
Uhl Shingle re -roof
Remove existing roof system, including all flashing, and counterflashing on the house at 209/211 River Walk and
dispose of the same. We are assuming that there is one layer of shingles, and one layer of 30# felt paper to remove.
If the roof is different from this, additional charges to remove the additional material will be added.
Nail off plywood to existing code.
If there is any rotted plywood it will be replaced at ($110.00 per sheet) Any other needed repairs on the SOFFIT,
FASCIA and SUB -FASCIA will be made at $65 per hour/ per man plus material cost.
Materials removed may be recycled with the proceeds going to Orchid Island Roofing. This rebate is figured into the
total cost of the job.
All materials will be installed per Florida Building Code
Install materials listed below
UNDERLAYMENT
WIP Grip peel & stick underlayment
FLASHING
Drip edge (aluminum)
Wall flashing (galvalume)
Step flashing (galvalume)
Valley metal roll (galvalume)
SHINGLE ROOF SYSTEM
Starter shingles
Owens Corning Shingles "Duration"
OC Pro -Edge Ridge Cap
Lead Boots
Galvalume gooseneck vents
Lomanco Omni Roll Ridge Vent
8D Ringshank 2 1/2" Coil Nails
Coil Nails
OIR proposes to furnish labor and materials for the above specs for the sum of:
Date of acceptance /-- I - 1>2 i Signature ��✓' �O
.Who
Payment: 30% deposit, 50% when underlayment is installed, balance when job is complete. c .
Acceptance of proposal, and the terms on the reverse side are hereby accepted. OR LLC is authorized to do the work specified.
Prices good for 15 days from date of proposal.
(772)643-5950 Page 1 orchidislandroofing.com
856 US Highway 1
Vero Beach, FL 32960
License CCC1329687
Paradise Association Mgmt
Deborah Lyon
Proposal
Date
4/26/2021
Estimate # Rep
11602 DAL
rchid Island
)of *ine
Project Address: Shingle re -roof
Scope of Work
Modified Bitumen roof cement
Dump fees
Orchid Island Roofing will purchase all required permits
GUTTERS:
Orchid Island Roofing will make every attempt to save and reuse the existing gutters. During the re -roof process, the
gutter spikes need to be removed, and then re -installed. This can sometimes cause corner joints to open and drip,
also some gutters may have an incorrect pitch currently, and this will make that worse. We will reinstall the gutters in
the same place they currently are, and we are not responsible for any gutter leaks, scratches, or dents when the
project is completed. In fact, this is a probability more than a possibility. This is why we recommend replacement at
the time of re -roofing.
Orchid Island Roofing warranties that this shingle roof will not leak for 5 years, under normal conditions. Orchid
Island Roofing will repair any leak in this time period. Any hurricane force winds void this warranty.
Please note, although great care will be taken to protect all plants, and grass from any damage, some minor
damage may occur. Grass, in the path around the house will be walked on multiple times daily. While this will cause
some stress to the grass, OIR can not be responsible for replacing any sod. Plants around the house will be covered
by a tarp during the removal process, and the weight of this may cause some damage to foliage. Because we take
great care to avoid this, OIR will not be responsible for damaged plants.
OR proposes to furnish labor and materials for the above specs for the sum of., $32,112.82
Date of acceptance Signature Q ,�}�
trek' Qn ti°�' w0 "'-pl f
Payment: 30%deposit, 50% when underlayment is installed, ba anc e o is c m e e. �;►Rr
Acceptance of proposal, and the terms on the reverse side are hereby accepted. OR LLC is authorized to do the work specified.
Prices good for 15 days from date of proposal.
(772)643-5950 Page 2 orchidislandroofing.com