Loading...
HomeMy WebLinkAboutAPPROVED TANK SPECS - 6-30-21aftem— Quality Steel Corporation AG/UG Propane Tanks ME9� 14SO wg. AND UP APPROMMATF AeOVEGROUND/UNDEGROUND IAG/UGI VESSEL DIMENSIONS AND SPECIFICATIONS WATER CAPACITY DIAMETER (OD) HEAD TYPE OVERALL LENGTH OVERALL HEIGHT LEG* WIDTH LEG** SPACING WEIGHT (Ibs.) **QUANTITY FULLLOAD PER STACK *120 wg. 24" EIIip. 5'-8" 3' 1'-11/2" 2'-101/2°or 3'-11" 260 109 196 16112 *250 wg. 30" Hemi. 7'-10" 3'-8" V-5" 4'-11" 480 S4 9 *320 wg. 30" 1 Hemi. 9'-7" 3'-8" 1'-5" 5' 620 45 9 S00 wg. 371/2" Hemi. 10' V-2" 1'4" 5' 950 37130 8 j 6 1000 wg. 41" Hemi. 16' 4'-S" 1'-8" 10'-1" 1,800 17115 6 1 5 1450 wg. 461/2" EIIip. 17'-4" V-11" 1'-9" 11' 7" 2,650 12 4 1990 w . 461/2" EIIip. 23'-11" 4'-11" 1'-9" 16' 3,520 8 4 Dftnenslans and spectfttWm shown are appro3dra+ate. Individual vessels may vary. * Leg spak3ng +/- 2°. Leg widths and sparing may vary based on mfg. location. Check with your salesperson for detallss. 120, 250, 320 wa. standard tanks - no holes in legs (one center hole on request). 500 and 1= wg. standard tanks- 2 holes 160 on center. 1450 wg. and up as shown above. •* M load and stack qua rrttties varyby shipping location. Check with your salesperson for details. General Specifications - Conforms to the latest edition of ASME Rules for Construction of Pressure Vessels, Section Vlll, Division 1. Complies with NFPA 58. - Rated at 250 psig from -20° F to 1250 F. All vessels registered with National Board. -Two service options available: Option 1: Ready -to -bury underground option, coated with either powder coated phenolic epoxy finish or liquid applied epoxy primer coat followed by urethane top coat, supplied with composite AG/UG dome. Option 2: Aboveground option, coated with either powder coated TGIC polyester finish or liquid applied epoxy primer coat followed by urethane top coat, supplied with steel AG/UG dome. - All vessels are shipped vacuum pre -purged to enable simplified first fill of the vessel. Updated June 30, 201S M Qv COMO Pm f�i P.MERM aftnowl _ PROPANE CONSTRUCTION NOTES 1. All pipe and fr#tings above ground and inside buildingshall be SCH..40 Galvanized. ASTM A120 or • AGA approved.corrugated stainless steel -(C.S.S.T.)pipe. , 2. Al[ polypipe and fittings shalt be ASTTt D251.3 or ASTM D2517 and shad be bc,rgead-outside underground at a de th of 18" with warningto a and trace . P r wire. 3. All pipe and meter locations are approximate and subject to change.. . .4. All polypipe shaft be Joined by heat fusion or approved mechanical . couplings. • 5. All *galvanized PWO stall be threaded. 5- All Pipe. sha#1 tie pressure tested to 20 # PSI fat a period of 24 hours. . ' UNDERGROUND TANK INSTALLATION .i •- 2" to 6" • DOWNGRADED AWAY .. _ FROM OOME _• _, •� """ mi . i ANODECABLE . _ SACRJFICIAL ANOOE :.,•�•• • .: (MAGNESIUM 8Apj 1• • ' • f r •f• REGOT ATOR {k • SUET GAS OFF AT • Q SIflE YALNE _IR ABOYFUHADE ••i•• • f�i'i. �N . • • O • Ram If'G TAPE RISE • GRADgCONCRETE SLEEVE o• • p • •••.• • • • • •ae . , : . 0 . • . d p owv 41 • koenoaovno ttoAs colitA SERVICE 18IN1 . TRACE HIRE