HomeMy WebLinkAbout30 temp power0
Request for 0-Day Temp
Date: I;�� f Permit
Project Address: ff� 7 E T (h,
,; c a �,n �
THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELEC
PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30)
AND EQUIPMENT IN PREPARATION FOR A FINAL INSPEC
REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FC
1. This temporary power release is requested for the abc
occupancy of any type, other than that permitted by c
2. As witness by our signatures, we hereby agree to abic
including Building Division Policy, which. is incorporate
3. All conditions and requirements listed in the attached,
Power for Testing" have been fulfilled and the premise
4. All requests for an extension beyond 30 days must be
the reason for the request. Power may be removed fr
the Final Inspection has not been approved within 30
the Stop Work Order.
a e o
CAL POWER TO THE ABOVE' DESCRIBED
YS, FOR THE PURPOSE OF TESTING SYSTEMS
N. IN CONSIDERATION OF APPROVAL OF THE
re stated purpose only, and there will be no
instruction during this time period.
by all terms and conditions of this agreement,
herein by reference.
ocument entitled "Requirements for 30 Day
is ready for compliance Inspection.
nade in writing to the Building Official stating
im the site and/or a Stop Work Order issued if
ays. A fee of $100.00 will be required to lift
WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST! LUCIE COUNTY, AND THEIR EMPLOYEES FROM
ALL. LIABILITIES AND CLAIMS OF ANY -TYPE :OF NATURE WHICH MAY ARISE NOW;OR IN THE FUTURE OUT
OF THIS -TRANSACTION, INCLUDING ANY.DAMAGE WHICH MAY BE INCURRED DUE TO THE
DISCONNECTION-0 CAL POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT.
I
{