Loading...
HomeMy WebLinkAboutCreekside Lot 90 UG Plumbing (2).pdfJEUNIVERSAU ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: 7 - / - 9 ( Permit No. Project: CS O l///��_� Address:,3 3 t5 r/'yit4 _ _ ✓� �lA�_� Check one: PIC Regular Inspection: ❑ Reinspection Date of Initial Inspection: - Inspection Type Requested (check): i s% BUILDING/7Floor TRICAL PLUMBING MECHANICAL Footingerground Underground Duct Rough -In Slab Rough -In Rough -In Steam Piping & TestMasonry Rough -In Stack Piping & Test HW Piping &TestWall/Ceilingng Rough -In Water Piping & Test CHW Piping & TestFramingl/Feeder Gas Piping & Test Cond. Piping &Test Structuralice/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall &Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions )( DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. S. 6. 7. Inspector's Name: ❑ DA-Disallowed OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com