HomeMy WebLinkAboutAPPROVED ENERGY CALCS & MANUAL J - 83 LAS CASITAS FORM R405-2020
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
Project Name: WYNNE BUIDLING-THE COTTAGE IMPACT Builder Name: WYNNE BUILDING CORP.
Street: THE COTTAGE Permit Office: ST. LUCIE COUNTY
City, State,Zip: FT.PIERCE, FL, Permit Number:
Owner: WYNNE BUILDING CORP. Jurisdiction:
Design Location: FL, Fort Pierce County: St. Lucie(Florida Climate Zone 2)
1. New construction or existing New(From Plans) 10. Wall Types(1718.3 sgft.) Insulation Area
2. Single family or multiple family Detached a. Concrete Block-Int Insul, ExteriorR=4.1 1478.30 ft2
g y p y b. Frame-Wood,Adjacent R=11.0 240.00 ft2
3. Number of units, if multiple family 1 c. NIA R= f?
4. Number of Bedrooms 1 d. NIA R= ft2
5. Is this a worst case? Yes 11. Ceiling Types(1336.0 sqft.) Insulation Area
a. Under Attic(Vented) R=30.0 1306.00 ft2
6. Conditioned floor area above grade(ft') 1306 b. Knee Wail (Vented) R=19.0 30.00 ft2
Conditioned floor area below grade(ft2) 0 c. NIA R= ft2
7. Windows(128.9 sgft.) Description Area 12. Ducts, location &insulation level R ft2
a. U-Factor: Sgl, U=1.02 76.04 ft2 a. a. Sup:Attic, Ret:Attic,AH:Attic 6 120
SHGC: SHGC=0.29 b.
b. U-Factor: Sgl, U=1.03 40.00 ft2 C.
SHGC: SHGC=0.27 13. Cooling Systems kBtulhr Efficiency
c. U-Factor: Sgl, U=1.02 12.85 ftz a. Central Unit 29.0 SEER:14.00
SHGC: SHGC=0.26
Area Weighted Average Overhang Depth: 4.701 ft
Area Weighted Average SHGC: 0.281 14. Heating Systems kBtulhr Efficiency
8. Skylights Description Area a. Electric Heat Pump 27.0 HSPF:8.20
U-Factor:(AVG) NIA NIA ft2
SHGC(AVG): NIA 15. Hot Water Systems
9. Floor Types Insulation Area 2 a. ElectricTankless Cap: 1 gallons
a. Slab-On-Grade Edge Insulation R= 0.0 1306.00 ft2 EF: 0.600
c. NIA R= ft b. Conservation features
None
16. Credits None
Glass/Floor Area:0.099 Total Proposed Modified Loads: 41.30
Total Baseline Loads: 43.21 PASS
I hereby certify that the plans and specifications covered by Review of the plans and
this calculation are in compliance with the Florida Energy specifications covered by this 'JOE5
Code. calculation indicates compliance
with the Florida Energy Code. ?'f . , s
PREPARED BY: Before construction is completed
this building will be inspected for W. !.
DATE: compliance with Section 553.908
Florida Statutes.
I hereby certify that this building,as des€gned J ompliance '
with the Florida Energy Codes ��WE
OWNE A T: BUILDING OFFICIAL:
DATE: \ DATE:
- Compliance requires certification by the air handier unit manufacturer that the air handler enclosure qualifies as
certified factory-sealed in accordance with R403.3.2.1.
- Compliance with a proposed duct leakage Qn requires a PERFORMANCE Duct Leakage Test Report confirming duct
leakage to outdoors,tested in accordance with ANSI/RESNETI[CC 380,is not greater than 0.000 Qn for whole house.
- Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project
requires a PERFORMANCE envelope leakage test report with envelope leakage no greater than 5.00 ACH60(R402.4.1.2).
6/7/2021 11:47:00 AM EnergyGaugeO USA 7.0.00-FlaRes202O FBC 7th Edition(2020)Compliant Software Page 1
FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT
PROJECT
Title: WYNNE BUIDLING-THE COTTAGE IMPACT Addresstype: Street Address
BuildingType: User Bedrooms: 1 Lot#: --
Owner: WYNNE BUILDING CORP. Conditioned Area: 1306 Block/SubDivision: ---
Total Stories: 1 PlatBook: --
Builder Name: WYNNE BUILDING CORP. Worst Case: Yes Street: THE COTTAGE
Permit Office: ST.LUCIE COUNTY Rotate Angle: 180 County: St Lucie
Jurisdiction: Cross Ventilation: No City,State,Zip: FT.PIERCE,
Family Type: Detached Whole House Fan: No FL,
New/Existing: New(From Plans) Terrain: Suburban
Year Construct Shielding: Suburban
Comment:
CLIMATE
Design Design Temp Int Design Temp Heating Design Daitytemp
Location Tmy Site 97.5% 2.5% Winter Summer Degree Days Moisture Range
FL,Fort Pierce FL_VERO_BEACH_MUNICIPA 39 90 70 75 299 62 Low
BLOCKS
Number Name Area Volume
1 Entire House 13M762001953125
SPACES
Number Name Area Volume Kitchen Occupants Bedrooms Finished Cooled Heated
_1 MASTER BEDROOM 234 1895.4 No 0 1 Yes Yes Yes
_2 DEN 144 1166.4 No 0 Yes Yes Yes
_3 SINK AREA 42 340.2 No 0 Yes Yes Yes
_4 CLOSET 63 510.3 No 0 No Yes Yes
_5 GREAT ROOM 452 3661.2 No 2 Yes Yes Yes
_6 MASTER BATH 50 405 No 0 Yes Yes Yes
_7 POWDER 25 202.5 No 0 No Yes Yes
_8 KITCHEN 232 1879.2 Yes 0 Yes Yes Yes
_9 LAUNDRY 40 324 No 0 No Yes Yes
10 STORAGE 24 192 No 0 0 Yes Yes Yes
FLOORS (Total Exposed Area = 1306 sq.ft.)
# FloorType Space Exposed Perim Perimeter R-Value Area U-Factor Joist R-Value Tile Wood Carpet
_1 Slab-On-Grade Edge Ins MASTER BEDROOM 31 0 234 It 0.473 - 0.00 1.00 0.00
_2 Slab-On-Grade Edge ins DEN 24 0 144ft 0.473 - 0.00 1.00 0.00
_3 Slab-On-Grade Edge ins SINKAREA 7 0 42ft 0.473 - 0.00 1.00 0.00
_4 Slab-On-Grade Edge Ins CLOSET 1 0 63 ft 0.473 - 0.00 1.00 0.00
_5 Slab-On-Grade Edge Ins GREAT ROOM 32 0 452 ft 0.473 - 0.00 1.00 0.00
_6 Slab-On-Grade Edge Ins MASTER BATH 5 0 50 ft 0.473 - 0.00 1.00 0.00
_7 Slab-On-Grade Edge Ins POWDER 1 0 25ft 0.473 - 0.00 1.00 0.00
_8 Slab-On-Grade Edge Ins KITCHEN 38 0 232 ft 0.473 - 0.00 1.00 0.00
_9 Slab-On-Grade Edge Ins LAUNDRY 1 0 40ft 0.473 - 0.00 1.00 0.00
10 Slab-On-Grade Edge Ins STORAGE 21 0 24 It 0.304 - 0.00 0.00 1.00
6[7/2021 11:47:00 AM EnergyGauge®USA 7.0,00-FlaRes202O FBC 7th Edition(2020)Compliant Software Page 2
FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT
ROOF
/ Roof Gable Roof Rad Solar SA Emitt Emitt Deck Pitch
Type Materials Area Area Color Barr Absor. Tested Tested Insul. (deg)
1 Hip Metal 1376 ft2 Oft' Light N 0.6 No 0.9 No 0 18.4
ATTIC
# Type Ventilation Vent Ratio(I in) Area RBS IRCC
1 Full attic Vented 150 1306 ft2 N N
CEILING (Total Exposed Area = 1336 sq.ft.)
# CeilingType Space R-Value Ins.Type Area U-Factor Framing Frac. Truss Type
_1 UnderAttic(Vented) MASTER BEDROOM 30.0 Blown 234.0ft2 0.053 0.10 Wood
_2 UnderAttic(Vented) DEN 30.0 Blown 144.01t 0.053 0.10 Wood
_3 UnderAttic(Vented) SINKAREA 30.0 Blown 42.0ft2 0.053 0.10 Wood
_4 UnderAttic(Vented) CLOSET 30.0 Blown 63.Oft2 0.053 0.10 Wood
_5 UnderAttic(Vented) GREAT ROOM 30.0 Blown 452.0ft2 0.053 0.10 Wood
_6 UnderAttic(Vented) MASTER BATH 30.0 Blown 50.0ft2 0.053 0.10 Wood
_7 UnderAttie(Vented) POWDER 30.0 Blown 25.0ft2 0.053 0.10 Wood
_8 UnderAttic(Vented) KITCHEN 30.0 Blown 232.0f2 0.053 0.10 Wood
_9 UnderAttic(Vented) LAUNDRY 30.0 Blown 40.Oft2 0.053 0.10 Wood
_10 UnderAttic(Vented) STORAGE 30.0 Blown 24.0ft2 0.030 0.11 Wood
_11 Knee Wall(Vented) GREAT ROOM 19.0 Blown 30.0ft2 0.045 0.11 Wood
WALLS (Total Exposed Area = 1718 sq.ft.)
Note:First wall orientation below is as entered.Actual orientation is modified by the rotate angle(180 degrees)as shown in the"Project"section on page 1.
Adjacent Cavity Width Height Area U- Sheath Fnn. Solar Below
J# Ornt To Wall Type Space R-Value Ft In Ft In sq.ft. Factor R-Value Frac. Absor. Grade
_1 S=>N Exterior Cone.Bilk Int Ins MASTER BEDROOM 4.1 18.0 0 8.0 1 145.5 0.149 0 0 0.30 0%
_2 W=>E Exterior Cone.Bilk-Int Ins MASTER BEDROOM 4.1 13.0 0 8.0 1 105.1 0.149 0 0 0.30 0%
_3 N=>S Exterior Cone.Bilk-Int Ins DEN 4.1 12.0 0 8.0 1 97.0 0.149 0 0 0.30 0%
_4 W=- E Exterior Cone.Bik-Int Ins DEN 4.1 12.0 0 8.0 1 97.0 0.149 0 0 0.30 0%
_5 S=>N Exterior Cone.Bik-Int Ins SINK AREA 4.1 7.0 0 8.0 1 56.6 0.149 0 0 0.30 0%
_6 N=>S Exterior Cone.Bilk-Int Ins GREAT ROOM 4.1 22.0 0 8.0 1 177.8 0.149 0 0 0.30 0%
_7 W=>E Exterior Cone.Blk-Int Ins GREAT ROOM 4.1 10.0 0 8.0 1 80.8 0.149 0 0 0.30 0%
_8 S=>N Exterior Cone.Bilk-Int Ins MASTER BATH 4.1 5.0 0 8.0 1 40.4 0.149 0 0 0.30 0%
_9 N=>S Exterior Cone.Bik-Int Ins KITCHEN 4.1 17.0 0 8.0 1 137.4 0.149 0 0 0.30 0%
_10 E=>W Exterior Conc,Bilk Int Ins KITCHEN 4.1 16.0 0 8.0 1 129.3 0.149 0 0 0.30 0%
11 S=>N Exterior Cone.Bik-Int Ins KITCHEN 4.1 5.0 0 8.0 1 40.4 0.149 0 0 0.30 0%
_12 N=>S Exterior Cone.BIk-Int Ins KITCHEN 4.1 35.0 0 8.0 1 282.9 0.149 0 0 0.30 0%
_13 N=>S Exterior Cone.Bilk-Int Ins STORAGE 4.1 6.0 0 8.0 0 48.0 0.149 0 0 0.30 0%
_14 N=>S Exterior Cone.Bilk-Int Ins STORAGE 4.1 5.0 0 8.0 0 40.0 0.149 0 0 0.30 0%
15 N= S Garage Frame-Wood MASTER BEDROOM 11.0 30.0 0 8.0 0 240.0 0.092 0 0.23 0.30 0%
DOORS (Total Exposed Area = 20 sq.ft.)
Width Height
# Ornt Adjacent To Door Type Space Storms U-Value Ft In Ft In Area
1 E=>W Insulated KITCHEN None 0.32 3.00 0 6.00 8 20.Oft2
677/2021 11:47:00 AM EnergyGauge®USA 7.0.00-FlaRes202O FBC 7th Edition(2020)Compliant Software Page 3
FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT
WINDOWS (Total Exposed Area = 129 sq.ft.)
Wall --Overhang-
✓# Omt ID Frame Panes NFRC U-Factor SHGC Imp Storm Area Depth Separation IntedorShade Screening
-1 W=>E 2 Metal Low-E Single Yes 1.02 0.29 N N 32Af1= 1.0 ft 5 in 1.0 ft 5 in None None
_2 W=>E 4 Metal Low-E Single Yes 1.02 0.29 N N 18.4ft2 1.0 ft5 in 1.Oft5in None None
_3 N=>S 6 Metal Low-E Single Yes 1.02 0.29 N N 18.4ft' 1.0 ft 5 in 1.0 ft 5 in None None
-4 W=>E 7 Metal Low-E Single Yes 1.03 0.27 N N 40.0' 12.0 ft 0 in 1.0 ft 5 in None None
-5 S=>N 8 Metal Low-E Single Yes 1.02 029 N N 6.9ft2 1.0 ft 5 in 1.0 ft 5 in None None
6 E=>W 10 Metal Low-E Single Yes 1.02 0.26 N N 12.8ft' 1.0 ft 5 in 1.0 ft 5 in None None
INFILTRATION
# Scope Method SLA CFM50 ELA EgLA ACH ACH50 Space(s)
1 Wholehouse ProposedACH(50) 0.00026 881 48.35 90.78 0.0907 5.0 All
GARAGE
# F1oorArea Roof Area Exposed Wall Perimeter Avg.Wall Height Exposed Wall Insulation
1 280 ft' 280 ft' 35 ft 8 ft 11
MASS
# Mass Type Area Thickness FumitureFraction Space
_1 Default(8lbs/sq.ft.) 0 ft' 0 ft 0.30 MASTER BEDROOM
_2 Default(8lbs/sq.ft.) 0 ft' 0 ft 0.30 DEN
_3 Default(81bs/sq.ft.) 0 R' 0 ft 0.30 SINK AREA
_4 Default(81bs/sq.ft.) 0 ft' 0 It 0.30 CLOSET
-5 Default(8lbs/sq.ft.) 0 ft' 0 ft 0.30 GREAT ROOM
_6 Defauk(8lbs/sq.ft.) 0 ft' 0 ft 0.30 MASTER BATH
_7 Default(81bs/sq.ft.) 0 ft' 0 It 0.30 POWDER
-8 Default(8lbs/sq.fL) 0 ft' Oft 0.30 KITCHEN
_9 Default(81bs/sq.ft.) Oft' Oft 0.30 LAUNDRY
10 Default(8lbs/sq.fL) 0 ft' Oft 0.30 STORAGE
HEATING SYSTEM
# System Type Subtype/Speed AHRI# Efficiency Capacity -GeothermalHeatPump- Ducts Block
kBtu/hr Entry Power Volt Current
_1 Electric Heat Pump Split/Single HSPF:8.20 27.0 0.00 0.00 0.00 sys#1 1
COOLING SYSTEM
# System Type Subtype/Speed AHRI# Efficiency Capacity Air Flow SHR Duct Block
kBtu/hr cfm
1 Central Unit Split/Single SEER:14.0 29.0 0 0.80 sys#1 1
6/7/2021 11:47:00 AM EnergyGauge®USA 7.0.00-FlaRes2020 FBC 7th Edition(2020)Compliant Software Page 4
FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT
HOT WATER SYSTEM
# System Type Subtype Location EF(UEF) Cap Use SetPnt Fixture Flow Pipelns. Pipe length
1 Electric Tankless Garage 0.60(0.60) 1.00 gal 61 gal 120 deg Standard None 82
Recirculation Recirc Control Loop Branch Pump DWHR Facilities Equal DWHR Other Credits
System Type length length power Connected Flow Eff
1 No NA NA NA No NA NA NA None
DUCTS
vDuct Supply - --Return Air CFM 25 CFM 25 HVAC#
# Location R-Value Area Location R-Value Area Leakage Type Handler TOT OUT ON RLF Heat Cool
—1 Attic 6.0120f? Attic 6.0 45fF Default Leakage Attic (Default)(Default) 1 1
TEMPERATURES
Programable Thermostat:N Ceiling Fans:N
Cooling []Jan []Feb []Mar []Apr []May [X]Jun [X]Jul [X]Aug [X]Sep []Oct []NOV []Dec
Heating [X]Jan [X]Feb [X]Mar []Apr []May []Jun []Jul []Aug []Sep []Oct [X]Nov [X]Dec
Venting []Jan []Feb [X]Mar [X]Apr []May []Jun []Jul []Aug []Sep [X]Oct [X]Nov []Dec
JThermostat Schedule: HERS 2006 Reference Hours
Schedule7ype 1 2 3 4 5 6 7 8 9 10 11 12
—Cooling(WD) AM 78 78 78 78 78 78 78 78 78 78 78 78
PM 78 78 78 78 78 78 78 78 78 78 78 78
—Cooling(WEH) AM 78 78 78 78 78 78 78 78 78 78 78 78
PM 78 78 78 78 78 78 78 78 78 78 78 78
—Heating(WD) AM 68 68 68 68 68 68 68 68 68 68 68 68
PM 68 68 68 68 68 68 68 68 68 68 68 68
Heating(WEH) PM 68 68 68 68 68 68 68 68 68 68 68 68
6/7/2021 11:47:00 AM EnergyGauge®USA 7.0.00-FlaRes202O FBC 7th Edition(2020)Compliant Software Page 5
2020 -AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIAa
Project Name: WYNNE BUIDLING-THE COTTAGE IMPACT Builder Name: WYNNE BUILDING CORP.
Street. THE COTTAGE Permit Office: ST.LUCIE COUNTY
City,State,Zip: FT. PIERCE, FL, Permit Number. Y
Owner. WYNNE BUILDING CORP. Jurisdiction: U
Design Location: FL, Fort Pierce County: St. Lucie(Florida Climate Zone 2) _
U
COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA
General A continuous air barrier shall be installed in the building envelope. Air-permeableinsulationshall
requirements The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material.
Breaks orjoints in the air barrier shall be sealed.
The air barrier in any dropped ceiling/soffit shall be aligned with The insulation in any dropped ceiling/soffit
Ceiling/attic the insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier.
Access openings,drop down stairs or knee wall doors to
uncenditioned attic spaces shall be sealed.
Walls The junction of the foundation and sill plate shall be sealed. Cavities within comers and headers of frame walls
The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity with
sealed. a material having a thermal resistance of R-3 per
Knee walls shall be sealed. inch minimum
Exterior thermal envelope insulation forframed walls
shall be installed in substantial centactand
continuous alignmentwith the air barrier.
Windows,skylights The space between window/doorjambs and framing,and
and doors skylights and framing shall be sealed.
Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated.
Floors The air barrier shall be installed at any exposed edge of Floor framing cavity insulation shall be installed to
(including insulation. maintain permanent contact with the underside of
above-garage subfloor decking,or floor framing cavity insulation
and cantilevered shall be permitted to be in contact with the top side
floors) of sheathing,orcontinuous insulation installed on
the underside of floor framing and extends from the
bottom to the top of all perimeter floor framing
members.
Crawl space walls Exposed earth in unvented crawl spaces shall be covered Where provided instead of floor insulation,insulation
with a Class l vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace walls.
Shafts,penetrations Duct shafts,utility penetrations,and flue shafts opening to
exterior or unconditioned space shall be sealed.
Narrowcavities Batts in narrow cavities shall be cut to fit,or narrow
cavities shall be filled by insulation that on
installation readily conforms to the available cavity
spaces.
Garageseparation Air sealing shall be provided between the garage and
conditionedspaces.
Recessedlighting Recessed lightfixtures installed in the building thermal Recessed light fixtures installed in the building
envelope shall be sealed to the finished surface. thermal envelope shall be air tight and IC rated.
Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring
and plumbing in exterior walls,or insulation that on
installation readily conforms to available space she]I
extend behind piping and wiring.
Showeritub The air barrier installed at exterior walls adjacent to showers Exterior walls adjacent to showers and tubs shall
onexteriorwall and tubs shall separate them from the showers and tubs. beinsulated.
Electrical/phonebox The air barrier shall be installed behind electrical or
onexteriorwalls communication boxes orair-sealed boxes shall be installed.
HVAC register boot HVAC supply and return register boots that penetrate building
thermal envelope shall be sealed to the sub-floor,wall covering
or ceiling penetrated by the boot.
Concealed When required to be sealed,concealed fire sprinklers shall only
sprinklers be sealed in a manner that is recommended by the manufacturer.
Caulking orother adhesive sealants shall not be used to fill voids
voids between fire sprinkler cover plates and walls or ceilings.
a.In addition,inspection of log walls shall be in accordance with the provisions of ICC-400.
677/2021 11:47:00 AM EnergyGauge®USA 7.0-FlaRes202O FBC 7th Edition(2020)Compliant Software Page 1
FORM R405-2020
ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX* = 96
The lower the EnergyPerformance Index,the more efficient the home.
THE COTTAGE,FT. PIERCE,FL,
1. New construction or existing New(From Plans) 10. Wall Types(1718.3 sgft.) Insulation Area
2. Single family or multiple family Detached a. Concrete Block-Int Insul, ExteriorR=4.1 1478.30 ft2
b. Frame-Wood,Adjacent R=11,0 240.00 ft
3. Number of units, if multiple family 1 c. WA R= ft2
4. Number of Bedrooms 1 d. N/A R= It
5. Is this a worst case? Yes 11. Ceiling Types(1336.0 sqft.) Insulation Area
a. Under Attic(Vented) R=30.0 1306.00 If
6. Conditioned floor area above grade(ft2) 1306 b. Knee Wall 2
Conditioned floor area below grade(ft2) 0 c. N/A (Vented) R=19R.0 30.00 ft2
7. Windows" Description Area 12. Ducts, location&insulation level R ft2
a. U-Factor: Sgl,U=1.02 76.04 ft2 a.a.Sup:Attic, Ret:Attic,AH:Attic 6 120
SHGC: SHGC=0.29 b.
b. U-Factor. Sgl, U=1.03 40.00 ft2 C.
SHGC: SHGC=0.27 13. Cooling Systems kBtu/hr Efficiency
c. U-Factor. Sgl, U=1.02 12.85 ft2 a. Central Unit 29.0 SEER:14.00
SHGC: SHGC=0.26
Area Weighted Average Overhang Depth: 4.701 It
Area Weighted Average SHGC: 0.281 14. Heating Systems kBtu/hr Efficiency
8. Skylights Description Area a. Electric Heat Pump 27.0 HSPF:8.20
U-Factor:(AVG) N/A N/A ft2
SHGC(AVG): N/A
15. Hot Water Systems
9. Floor Types Insulation Area a. ElectricTankless Cap: 1 gallons
a. Slab-On-Grade Edge Insulation R= 0.0 1306.00 ft22 EF:0.600
b. N/A R= ft b. Conservation features
c. N/A R= ft2 None
16. Credits None
I certify that this home has complied with the Florida Energy Efficiency Code for Building
Construction through the above energy saving features which will be installed(or exceeded)
in this home before final inspection. Otherwise,a new EPL Display Card will be completed }3ti S7,
based on installed Code compliant features. qY
Builder Signature:
Address of New Home: "J �t5 �`i"C=cS City/FL Zip:FT.PIIERCE,FL,`
-kq-S k 1�.�-
'Note: This is not a BuildingEnergy Rating. If our Index is below 70, our home may wE
gy g. y y y qualify for
energy efficient mortgage(EEM)incentives if you obtain a Florida Energy Rating. For information about the
Florida Building Code, Energy Conservation,contact the Florida Building Commission's support staff.
"Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation,if not DEFAULT.
677/2021 11:47:00 AM EnergyGauge®USA 7.0.00-FlaRes2020 FBC 7th Edition(2020)Compliant Software Page 1 of 1
wrightsoft° Project Summary Job:
,
Entire House BY
QUICK CALCS, INC.
317 ST.LUCIE LANE,FORTPIERCE,FL34946 PInre:772-466-6799 Em il:QUICKCALCSQ40LCOM
Project Information
For: WYNNE BUILDING CORP.
THE COTTAGE,FT.PIERCE,FL
Notes:
Design Information
Weather: Fort Pierce,FL,US
Winter Design Conditions Summer Design Conditions
Outside db 42 OF Outside db 90 OF
Inside db 70 OF Inside db 75 OF
Design TD 28 OF Design TO 15 OF
Daily range M
Relative humidity 50 %
Moisture difference 61 gr/Ib
Heating Summary Sensible Cooling Equipment Load Sizing
Structure 16327 Btuh Structure 15522 Btuh
Duds 4013 Btuh Duds 5251 Btuh
Central vent(0 chn) 0 Btuh Central vent(0 dm) 0 Btuh
none
(none)
Humidification 0 Btuh Blower 0 Bluh
Piping 0 Btuh
Equipmentload 20340 Btuh Use manufacturer's data In
Rate/swing multiplier 0.95
Infiltration Equipment sensible load 19734 Sun
Method Simplified Latent Cooling Equipment Load Sizing
Construction quality Average
Fireplaces 0 Structure 2094 Btuh
Ducts 1524 Btuh
Central vent(0 dim) 0 Btuh
Heatingg Coolingg (none)
Area(ft') 1306 1306 Equipment latent load 3618 Btuh
Volume(ff) 10579 10579
Airchanges/hour 0.45 0.23 Equipment Total Load(Sen+Lat) 23352 Btuh
EquivAVF(cfm) 79 41 Req.total capacity at 0.70 SHR 2.3 ton
Heating Equipment Summary Cooling Equipment Summary
Make Carrier Make Carrier
Trade CARRIER Trade CARRIER
Model CH14NBO3000GOA0 Cond CH14NBO3000GOA0
AHRI ref 9162387 Coil FX4DNBO43L
AHRI ref 9162387
Efficiency 8.2 HSPF Efficiency 11.5 EER,14 SEER
Heating input Sensiblecooling 20300 Btuh
Heating output 28000 Btuh @ 47'F Latent cooling 8700 Btuh
Temperature rise 26 OF Total cooling 29000 Btuh
Actual airflow 967 cfm Actual airflow 967 cfm
Airflowfador 0.048 cfrn/Btuh Airflowfador 0.047 cfm/Btuh
Static pressure 0.50 in H2O Static pressure 0.50 in H2O
Space thermostat Load sensible heat ratio 0.85
Capacity balance point=34 OF
Backup:
Input=5 kW, Output=18005 Btuh,100AFUE
Calculations approved byACCAto meet all requirements of Manual J 8th Ed.
i`s_ Wry �Q RigF-SOL@Urivers1201919.021RSU08101 2021-Jan1213age 1
AGf+lt Page 1
...\WrigtSoft FNAQWYNNE BUIOLING-h1E COTTAGE.r,p Calc=M18 Frorl Doortaces:SW
wrightsW Right-JO Worksheet Job.'
Entire House Date:
QUICK CALCS, INC. BY
317 ST.LUCIE LANE,FORT PIERCE,FL34946 Phre:772466-6799 Email:QUICKCALCS@AOL.COM
1 Room name Entire House MASTER BEDROOM
2 Eposedwall 145.0 ft 31.0 ft
3 Room height 8.1 ft 8.1 a heatlmol
4 Room dimensions 13.0 x 18.0 ft
5 Roomarea 1306.0 ft" 234.0 ft
Ty Construction U-value Or HTM Area Load
number (BtuhAF-'F (BWhXt� or penm�r M (BWh) oorperimeter (ft) (BWh)
Heat Cool Gross NIPS Heat Cool Gross NAPS Heat Cool
6 Ut/ 13A4as 0.143 n 4.00 2.19 446 427 1710 934 0 0 0 0
�--G 2glaang,droutr, 1.040 n 29.12 21.68 18 0 537 400 0 0 0 0
111 13A4acs 0.143 a 4.00 2.19 162 129 516 282 0 0 0 0
IL-DG 2glaang,droutr, 1.040 a 29.12 39.42 13 2 368 498 0 0 0 0
11 11130 0.390 a 1092 10.34 20 20 223 21 0 0 0 0
W/ 13A4= 0.143 s 4.00 2.19 284 277 1107 605 w 146 584 319
T-G 2glaang,droutr, 1.040 s 29.12 21.68 7 7 202 150 0 0 0 0
vh13A4ors 0.143 w 4.00 2.19 284 192 767 419 105 73 291 159
1Aclom 1270 w 35.56 34.77 41 41 1451 1419 0 0 0 0
10-h1om 1270 w 35.56 61.76 18 3 656 1139 0 0 0 0
1A-hlom 1270 w 35.56 63.40 33 5 1162 2072 33 5 1162 2072
C 16C-30ml 0.032 - 0.90 128 1306 1306 1170 1672 234 234 210 300
F 22A-Ipl 0.989 - 27.69 0.00 1306 145 4015 0 234 31 858 0
6 c)AEDe reon i 3591 997
Envelope lossigain 13985 13393 3105 3847
12 a) Infil4abon 2441 668 522 143
b) RoornwrIlabon 1 0 0 0 0
13 Internal gains O=pants@ 230 2 460 0 0
Appliances/other 1000 0
SubVaI(lines610 13) 16327 15522 X271 3990
Lesseatemal load I 0 0 0 0
Leestran4er 0 0 0 0
Redistibuion 0 0 0 0
14 Subtotal 16327 15522 3627 3990
15 Ductloads 250/. 34% 4013 5251 25% 34% 892 1352
Total room load 20340 20773
Air required(dm) 967 967 4518 5342
215 249
Calculations approved byACCAto meet all requirements of Manual J 8th Ed
RigkSuteO 1 p I6 919.021 R3U08101 2021-Jar-121321:40
�'A ...\Wdghtsotl HVAC1WYNNE BUIDLING-THE COTTrAGEAGE.nup CaIc=M Frort Coorfaces:SW Page 1
wrightsW Right-M)Worksheet Jo"
Entire House pate:
By.
QUICK CALCS, INC.
317 ST.LLUE LANE,FORr PIERCE,R-34W Mm:772-466-6799 EmaiI:QUICKGALCS@AOL.COM
1 Room reme DEN SINKARFA
2 F)posedwall 24.0 it 7.0 it
3 Room height &1 ft heallmol 8.1 It heat/cool
4 Room dimensow 12.0 x 12D It 6.0 x 7.0 it
5 Room area 144D ft• 420 IF
Ty Conshvution Ll-value Or rea HTM ALoad
number (BbhI�-°F) (BWhAN) or perim� (ft) (BWh) orped(mom (ft) (BNh)
Heat Co01 Gros NIPS Heat Cool Gros NIPS Heat Cool
6 W 13AA= 0.143 n 400 2-19 97 97 389 213 0 0 0 0
LC 2glaarg,droutr, 1040 n 29.12, 21.68 0 0 0 0 0 0 0 - 0
lQl 13A-4= 0.143 a 400 2.19 0 0 0 0 0 0 0 0
L�DG 2glaang,droutr, 1040 a 29.12 39.42 0 0 0 0 0 0 0 0
11 11DO 0.390 a 10.92 1034 0 0 0 0 0 0 0 0
W 13AA= 0.143 s 400 2.19 0 0 0 0 57 57 227 124
l--C 2gWrig,droutr, 1040 s 29.12 21.68 0 0 0 0 0 0 0 0
13A-0as 0.143 w 400 2.19 97 79 315 172 0 0 0 0
1Aclorn 1270 w 35M 34.77 0 0 0 0 0 0 0 0
1A-hlorn 1270 w 3556 61.76 18 3 656 1139 0 0 0 0
1A411om 1270 w 35M 63,40 0 0 0 0 0 0 0 0
C- 16C-30ml OA32 - 0.90 - 128 144 144 129 184 42 42 .38 54
F 22A-0 0.969 - 27.69 0.00 144 24 665 0 42 7 194 0
6 c)AED e=rson 574 3
ErNebpe loss/gain 2154 2283 459 175
12 a) Hibralion 404 111 118 32
b) Roomventlation 0 0 0 0
13 Infernalgairm 0—pants@ 230 0 0 0 0
Appliancesbther 0 0
Subtotal(lir=6b 13) 2558 2394 576 207
Lesexbmal load 0 0 0 0
Lestransler 0 0 0 0
Redistribudon 0 0 0 0
14 Subtotal 2558 2394 576 207
15 Ductloads 25% 34% 629 811 25% 34% 142 70
Tool room load 3187 3205 718 278
Airrequired(dm) 152 149 34 13
Calculations aDproved bvACCAto meet all requirements of Manual J 8th Ed.
20214k 121321:40
PogttTHE CD TrAG al20191lc=L RS rortDo
�A ...1WrighSORHJAGIWYNNE BUIDLING-THE COTTAGEn.p CaIc=MIB FmrtD00r1a0?S:SW Page 2
t wrightsoflr Right-M Worksheet Job:
.
Entire House By.
QUICK CALM INC.
317 ST.LUCIE LANE,FORT PIERCE,PL34946 Phone-772466-6799 Email:QUICKCALCS@AOLCOM
t Room name CLOSET GREAT ROOM
2 E pos:dwall O ft 32.0 it
3 Room height 8.1 ft heatl000l 9.1 ft heaftal
4 Room dimensions 9.0 x 7.0 It 1.0 x 452.0 It
5 Room area 63p 1F 452.0 W
Ty Construction U-value Or HTM Area (1) Load Area (ft) Load
number (B1uh4 F) (BWW or penmeter (ft) (Btuh) or Parameter (ft) (BWh)
r3566
Cool Grass NIPS Heat Cool Gross N/P/S Heat Cool
6 V�/ 13AA= 0.143 n 2.19 0 0 0 0 178 160 640 350
L--C 2 glazing,or outr, 1.040 n 21.68 0 0 0 0 18 0 537 400
W, 13A4as 0.143 a 2.19 0 0 0 0 0 0 0 0
L�--DG 2glaang,droW, 1.040 a 39.42 0 0 0 0 0 0 0 0
71 11DO 0390 a 10.34 0 0 0 0 0 0 0 0
� 1344ocs 0.143 s 2.19 0 0 0 0 0 0 0 0
G 2glaarg,droutr, 1.040 s 21.68 0 0 0 0 0 0 0 0
y! 13AAo s 0.143 w 2.19 0 0 0 0 81 40 161 88
I---G 1A,cl= 1270 w 34.77 0 0 0 0 41 41 1451 1419
IL----GG 1A-hlom 1270 w 35.56 61.76 0 0 0 0 0 0 0 0
1A-h1om 1270 w 35.66 63.40 0 0 0 0 0 0 0 0
C 1601MMI 0A32 - 0.90 128 63 63 Be 81 452 452 405 579
F 22Atpl 0289 - 27.69 0.00 63 0 0 0 452 32 886 0
6 c)AED e=rson -1 2069
Envelopeiosigain 55 80 4080 4903
12 a) Infiltration 0 0 539 148
b) Room ventilation 0 0 0 0
13 Internal gains: Occupants@ 230 0 0 2 460
Applianoas/other 0 0
Subtotal(lines6to13) 56 80 46191 5511
Lesse malload 0 0 0 0
Lesstrander 0 0 0 0
Redis[buton 0 0 0 0
14 Subtotal 56 80 4619 5511
151 Dud loads 25% 349/6 14 27 25% 34% 1135 1568
Total room load 70 107 5754 7379
Air required(cm) 3 5 274 343
Calculations approved bVACCAto meet all requirements of Manual J M Ed.
ti ��w��ti��• 2021Jan-121321:40
Rigl15ueOUriverssi 201919.021 RSU08101 Page 3
...\Wnglsoft HJAQWVNNEBUIDLING-THECOTTAGE.np Cal.=M18 Fmrt Doortoes:SW
wrightsat° RighW@ Worksheet Job:
Entire House °fit
QUICK CALCS, INC. By.
317 ST.LUCIE LANE,FORT PIERCE,FL34946 Pl,one:T2466-6799 Email:OUICKCALCS@,AOL.COM
1 Room name MASTER BATH POWDER
2 E-Aoudwall 5.0 ft 0 ft
3 Room height 8.1 it heaVmol 8.1 it hMVorol
4 Room dimes ons 10.0 x 5.0 ft 5.0 x 5D ft
5 Room area 50.0 IF 25.0 fF
Ty Construction U-value Or HIM Area (110 Load Area Load
number (Bful d2.9 (B6rhITF) or perimeter (ft) (BWh) or perimeter M (Bwh)
Heat Cool Gross NIPrS Heat Cool Gross NIPS Heat Cool
6 V _G 13A-4= 0.143 n 4.00 2.19 0 0 0 0 0 0 0 0
2glazing,oroutr, 1.040 n 29.12 21.68 0 0 0 0 0 0 0 0
W, 13A4= 0.143 a 4.00 2.19 0 0 0 0 0 0 0 0
LL_q_ 2glaang,droutr, 1.040 a 29.12 39.42 0 0 0 0 0 0 0 0
11 D 11DO 0.390 a 1092 10.34 0 0 0 0 0 0 0 0
W 134 4= 0.143 s 4.00 2.19 41 34 134 73 0 0 0 0
�G 2glaang,droutr, 1.040 s 29.12 21,68 7 7 202 150 0 0 0 0
13A4o s 0.143 w 4.00 2.19 0 0 0 0 0 0 0 0
1Aciom 1270 w 35.56 34.77 0 0 0 0 0 0 0 0
1A-h1om 1270 w 3556 61.76 0 0 0 0 0 0 0 0
1A-h1om 1270 w 35.56 63.40 0 0 0 0 0 0 0 0
C 16C30mi 0.032 - 0.90 128 50 50 45 64 25 25 22 32
F 22A-tpl 0.989 - 27.69 0.00 50 5 138 0 25 0 0 0
I
6 c)AEDe racy, 40
Envelope loWgain 520 284 22 32
12 a) Infiltration 84 23 0 0
b) Room ventilation 0 0 0 0
13 Intemalgains: Occupants@ 230 0 0 0 0
Applianoeadther 0 0
Subtotal(lines6to 13) ' 604 307 22 32
Lesextemalload 1 0 0 0 0
Lestransfer 0 0
0 0
Redistribution 0 0 0 0
14 Subtotal I 604 307 22 32
15 Ductloads 25% 34% 148 104 250/6 34% 6 11
Total room load 752 411
Air required(dm) 36 19 28 1 42
2
Calculations approved byACCAto meet all requirements of Manual J 8th Ed
-F{i+-wr�9lrrLsaR�.9 A ... R9F 919.021 RSU0810t 2021-Jan-121321:40
\Wdgh6oftHVACWYNNEBUIDLING-THECATTAGE.rLo Calc=M)8 FrortCoorhoes:SW Page
1 wrightsoft° Right-M Worksheet Job:
Entire House Date:
QUICK CALCS, INC. By.
317 ST.LUCIE LANE,FORT PIERCE,FL34946 Pore:772�66£799 Email:QUICKCALCS@4OL.COM
1 Room name KrTCHEN LAUNDRY
2 Exoaredwall 38.0 It 0 It
3 Room height 8.1 E heatl000l 8.1 It heaVcool
4 Room dimensions 1.0 x 232.0 It 4.0 x 10.0 It
5 Room area 232.0 IF 40.0 1F
Ty Construction U-value Or HTM Area (ft) Load Area (ft) Load
number (BWhMt F) (Bluhflt) or perimeter (ft) (BWh) or perimeter (ft) (Btuh)
Heat j Cool Gross NRIS Heat Cool Gross N/PS Heat Cool
6 W! 13AAM 0.143 n 4.00 2.19 138 138 551 301 0 0 0 0
�--G 2glaang,droutr, 1A40 n 29.12 21.68 0 0 0 0 0 0 0 0
13A-0as 0.143 a 4.00 2.19 130 97 387 211 0 0 0 0
2glaang,droutr, 1.040 a 29.12 39.42 13 2 368 498 0 0 0 0
11 D 11130 0.390 a 10.92 10.34 20 20 223 211 0 0 0 0
13A4= 0.143 s 4.001 2.19 41 41 162 89 0 0 0 0
t-C 2glaarg,drout,, 1.040 s 29.12 21.68 0 0 0 0 0 0 0 0
13AAors 0.143 w 4.00 2.19 0 0 0 0 0 0 0 0
to-clom 1270 w 3556 34.77 0 0 0 0 0 0 0 0
IA-hlom 1270 w 35.56 61.76 0 0 0 0 0 0 0 0
1A-h1om 1270 w 35.56 63.40 0 0 0 0 0 0 0 0
C 16C-30mI 0.032 - 0.90 128 232 232 208 297 40 40 36 51
F 22A-tp1 0.989 - 27.69 0.00 232 38 1052 0 40 0 0 0
6 c)Am exorrson, -37 -1
Bwelope
losygain 2951 157C 36 51
12 a) infiltration 640 175 0 0
b) Roornwrolation 0 0 0 0
13 Irftesrlal gains: Oo:Ipants@ 230 0 0 0 0
Appliance.4other 1000 0
Subtotal(linesft 13) 3591 2745 136 51
LesseMernaliead 0 0 0 0
Less transfer 0 0 0 0
Redistibuton 0 0 0 0
14 Subtotal 3591 2745 36 51
15 Dudloads 25% 34-Al 883 931 25% 34% 9 17
Total mom load 4474 3676
Air required(dm) 213 171 45 68
2 3
Calculations approved byACCAto meet all requirements of Manual J 8th Ed
A& -rid-7 w�
RigttSUL&Umerml 20l9 l9.021 RSU08101 2021-Jan121 1
...\Wdghtwft HVAQWYNNESUIDLING-THECOTrAGE.w Caic=W8 Frort Ooorfaces:SW Page 5
wrightsoft- Right-M Worksheet Job;
Entire House Date:
QUICK CALCS, INC. By.
317 ST.LUCIE LANE,FORT PIERCE,FL34946 Phone:772466-6799 Email:QUICKCALCB@P.OL.COM
1 Room name STORAGE
2 Elyos-'ed vall 8.0 ft
3 Room height 8.1 It heaV=l
4 Room dimensone 4.0 x 6.0 ft
5 Room area 24.0 IF
Ty Construction U-value Or HTM Area (IF) Load Area Load
number (BbrhAF--°F) (BCrh4F) or perimeter (ft) (Bluh) or perimeter
Heat Cool Gros N/P/S Heat Cool Gross N/P/S Heat Cool
13AAM 0.143 n 4.00 2.19 32 32 130 71
6 Y—G 2glaarg,droutr, 1A40 n 29.12 21.68 0 0 0 0
13A4ors 0.143 a 4.00 2.19 32 32 130 71
2 glazing,droutr, 1.040 a 29.12 39.42 0 0 0 0
11 11DO 0.390 a 10.92 10.34 0 0 0 0
\RI 13AAc s 0.143 $ 4.00 2.19 0 0 0 0
�—G 2glazing,droutr, 1.040 s 29.12 21.68 0 0 0 0
13AAocs 0,143 w 4.00 2.19 0 0 0 0
1Aclom 1270 w 35.56 34.77 0 0 0 0
1A-h1om 1270 w 3556 61.76 0 0 0 0
1A-h1om 1270 w 3556 63.40 0 0 0 0
c 16C-30ml 0.032 - 020 128 24 24 22 31
F 22A-tpl 0.989 - 27.69 0.00 24 8 222 0
6 c)AEDe son _3
Enselopelossigain 502 17C
12 a) InfiMafion 135 37
b) Room venfilafion 0 0
13 Internal gains: Ocwpanfs@ 230 0 0
Applianceslother 0
SubtD6i(lines61013) 637 207
Lesetdemalload 0 0
Lestransfer 0 0
Redistribution 0 0
14 Subtotal 637 207
15J Dudloads 25% 29% 157 60
Total room load
738 212
Airrequired(Cm)
Calculations approved bvACCAto meet all requirements of Manual J 8th Ed.
RN te CAr 1 RS 2021-Jan-121321:40
...\WdgttoftHUAC\WYNNEBUIDLIG-THEC07rGE.np Calc=M8 FToniDoorfacesSW Page 6
wrightsoft` Duct System SummaryDale:
Entire House sy
QUICK CALCS, INC.
317 ST.LUCIE LANE,FORT PIERCE,FL34W Pion:772-46&6799 Em fl:QUICKCALCS@IOL.COM
Project •
For. WYNNE BUILDING CORP.
THE COTTAGE,FT.PIERCE,FL
Heating Cooling
External static pressure 0.50 in H2O 0.50 in H2O
Pressure losses 028 in H2O 028 in H2O
Available static pressure 022 in H2O 022 in H2O
Supply/return available pressure 0.110/0.110 in H2O 0.110/0.110 in H2O
Lowest friction rate 0.080 in/10011: 0.080 in/100ft
Actual airflow 967 darn 967 chn
Total effective length(TEL) 126 It
SupplyDetail Table
Design Htg Clg Design Diam H x W Dud Actual Ftg.Egv
Name (Btuh) 0m) (cim) FR pn) (in) Mail Ln(it) Ln(ft) Trunk
CLOSET c 107 3 5 0.080 4.0 OxO VIFx 24.6 90.0 st1
DEN h 3187 152 149 0.080 7.0 OxO VIFx 33.5 90.0 st1
GREAT ROOM c 3689 137 172 0.080 8.0 0x0 VIFx 14.6 70.0
GREAT ROOMA C 3689 137 172 0.080 8.0 OxO VIFx 16.1 70.0
KnU-rN h 4474 213 171 0.080 7.0 OxO VIFx 4.5 70.0
LAUNDRY c 68 2 3 0.080 4.0 Ox0 VIFx 5A 70.0
MASTERBATH h 752 36 19 0.080 4.0 OxO VIFx 32.9 90.0 st1
MASTERSEDROOM c 2671 107 124 0.080 7.0 Ox0 VIFx 27.9 90.0 st1
MASTERBEIXROOM-A c 2671 107 124 0.080 7.0 0x0 VIFx 35.9 90.0 SH
POWDER c 42 1 2 0.080 4.0 Ox0 VIFx 292 90.0 st1
SINK AREA h 718 34 13 0.080 4.0 0x0 VIFx 30.9 90.0 st1
STORAGE h 794 1 38 12 0.080 4.0 OxO VIFx 112 70.0
SupplyDetail Table
Trunk Htg Clg Design Veloc Diam H x W Duct
Name Type (cfm) (crm) FR (fpm) (in) pn) Material Trunk
st1 PeakAVF 441 437 1 0.080 561 12.0 0 x 0 VinlFix
wrightsoft- 2021Ja 121321:41
�(\ ,.v-, �.�.,�,,,., Rgtd-Suta@L4iwml201919.021RSU08101 Pages
...1WrigttMftWACIWYNNEBUIDLING-h1ECOTTAGEnp CaIc=MS FrortDoorfa SW
Return Branch Detail Table
Grille mg Gg TEL Design Ueloc Diam H x W Stud/Joist Duct
Name Size(n) (cfm) (dm) (it) FR (fpm) (in) (in) Opening(n) Mat Trunk
rb1 NO 1 967 967 0 0 0 0 Ox 0 MR
Wrightsoftm 20214k 121821:41
MgttSukeS Udv 1201919.021 RSU08101
Page 2
...\WngMsoR HVAgWVNNE BUIULING-7HE CATTAGEnp Cak=MIB Flort Ooorf�-SW