Loading...
HomeMy WebLinkAboutCreekside Lot 38 Roof Final.pdfUNIVERSAL" ENGINEERING SCIENCES Inspection Date: Project: C Address: / / c1 Check one: Regular inspection: ❑ Reinspection INSPECTION RESULTS „� Permit No. Date of Initial Inspection: _ Z —2 Inspection Type Requested (check): I KUL I URAL Footing ELECTRICAL PLUMBING Slab Underground Underground Masonry Floor Rough -In Rough -In Wall/Ceiling Wall Rough -In Stack Piping & Test Framing Ceiling Rough -In Water Piping &Test Structural Panel/Feeder Gas Piping &Test Sheet Rock Service/Ground Storm Piping & Test Roofing APPliance/Equipment Fixtures Re -inspection Lighting Protection Equipment Final Buildin g Re -inspection Final Electrical Re -inspection 111 Final Plumhino Other Inspection Type: Area Inspected/Code:_ Inspection ResultsXP-Disapproved P-Approved ❑ AE-A ! pproved with Exceptions ❑ Not Ready Conditions/Comments: 1. _ 2. 3. 4. _ 5. 6. 7. Inspector's Name: OFFICES THROUGHOUT FLORIDA 607 I - ol79 MECHANICAL Duct Rough -In Steam Piping & Test HW Piping & Test CHW Piping & Test Cond. Piping & Test Insulation Wall & Ceilme Final Mechanical ❑ DA-Disallowed NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com